Council archive · source document
Appendix E- Traffic Impact Assessment · MCU23/0135
Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
10 October 2023
SLR Project No.: 620.V30926
Stockwell Development Group Pty Ltd SLR Ref No.: 620.30926-R01-v1.0 Noosa Civic
Noosa Civic Shopping Centre Stage 2 Retail TIA 20231010.docx
8.0 Operational Assessment
8.1 Study Locations
To assess the traffic demands of the surrounding road network, a detailed assessment has
been undertaken at the intersections shown on Figure 6, noting that the broader road network
has been considered as part of the prior infrastructure agreement process.
Figure 6 Study Intersections
The key intersections shown on Figure 6 are summarised in Table 11.
Table 11 Study Intersections Summary
ID Intersection Name Form Authority
I1 Hofmann Dr / Noosa Civic Access Rd
I2 Hofmann Dr / Noosa Civic Loop Rd NSC
I3 Hofmann Dr / Rene St / Loading Dock Access
I4 Noosa Civic Access Rd / Main St Private
8.2 Existing Traffic Demands
In order to ascertain the existing traffic demands on the study road network, Austraffic were
commissioned by SLR to conduct traffic surveys at the study intersections I1 to I3. The surveys
were carried out during the weekday PM (3pm to 7pm) and Saturday midday (10am to 2 pm)
peak periods on Thursday 5 May 2022 and Saturday 7 May 2022 respectively.
According to the survey data, it was observed that the peak hour traffic conditions occurred
at:
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E- Traffic Impact Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.