Skip to the record
Beware of cheap imitations.

Council archive · source document

Appendix E- Traffic Impact Assessment · MCU23/0135

of 151

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                                           10 October 2023
                                                                               SLR Project No.: 620.V30926
Stockwell Development Group Pty Ltd                            SLR Ref No.: 620.30926-R01-v1.0 Noosa Civic
Noosa Civic Shopping Centre                                               Stage 2 Retail TIA 20231010.docx



8.0         Operational Assessment
8.1         Study Locations
To assess the traffic demands of the surrounding road network, a detailed assessment has
been undertaken at the intersections shown on Figure 6, noting that the broader road network
has been considered as part of the prior infrastructure agreement process.

Figure 6    Study Intersections




The key intersections shown on Figure 6 are summarised in Table 11.

Table 11 Study Intersections Summary
ID               Intersection Name                               Form           Authority
       I1             Hofmann Dr / Noosa Civic Access Rd
       I2              Hofmann Dr / Noosa Civic Loop Rd                                     NSC
       I3         Hofmann Dr / Rene St / Loading Dock Access
       I4               Noosa Civic Access Rd / Main St                                  Private


8.2         Existing Traffic Demands
In order to ascertain the existing traffic demands on the study road network, Austraffic were
commissioned by SLR to conduct traffic surveys at the study intersections I1 to I3. The surveys
were carried out during the weekday PM (3pm to 7pm) and Saturday midday (10am to 2 pm)
peak periods on Thursday 5 May 2022 and Saturday 7 May 2022 respectively.
According to the survey data, it was observed that the peak hour traffic conditions occurred
at:



                                                   13

Used in these records

About this file

File size
10.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E- Traffic Impact Assessment.pdf · 10.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.