Council archive · source document
Appendix E- Traffic Impact Assessment · MCU23/0135
Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
10 October 2023
SLR Project No.: 620.V30926
Stockwell Development Group Pty Ltd SLR Ref No.: 620.30926-R01-v1.0 Noosa Civic
Noosa Civic Shopping Centre Stage 2 Retail TIA 20231010.docx
traffic generated by Lot 3 was considered in conjunction with the existing and the proposed
development of Lot 1. The resulting trip rates for the total yield are presented in Table 15.
Figure 7 Shopping Centre Traffic Generation Decay Curve
Table 15 Calibrated Traffic Generation for Expansion GFA
Combined Weekday PM Peak Saturday Midday Peak
Location Yields m2 Trip Rate Trips Trip Trip Rate Trips Trip
(GFA) (vph/100 m ) (vph) (1)
2 Increase (vph/100 m2) (vph) (1) Increase
Lot 1 - Existing 31,670 4.98 1,577 7.02 2,223
Lot 3 - Development 39,170 4.48 1,756 179 6.44 2,522 299
Lot 1 - Expansion 45,670 4.15 1,894 138 6.05 2,761 239
1. Interpolated from the Noosa Shopping Centre Adjusted Decay Curve
8.6.1.2 Retail (Shopping Centre) Use Drop-in Trips
When considering trips generated by the development, it is important to consider that not all
trips are new to the local road network. Traffic that already exists on the road network should
be discounted to account for the ‘drop-in’ component, which is detailed within Austroads Guide
to Traffic Management Part 12, as follows:
Diverted drop-in trips: A linked trip from an origin to a destination that has made a
significant network diversion to use the new development.; and
Undiverted drop-in trips: A linked trip from an origin to a destination that previously
passed the development site. It is also referred to as a pass-by trip and the new
development is an intermediate stop on a trip that is made from an origin to a
destination.
18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E- Traffic Impact Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.