Figure 11 I4: Noosa Civic Access Road / Main Street – Existing and SIDRA Assessed
Form
Table 23 I4: Noosa Civic Access Road / Main Street – SIDRA Outputs
Weekday PM Peak Saturday Midday Peak
Scenario Critical Delay 95%tile Critical Delay 95%tile
DOS DOS
(sec) Queue (m) (sec) Queue (m)
Baseline
2022 0.08 12 3 0.08 12 3
2027 0.22 13 9 0.25 13 11
2037 0.23 13 10 0.26 13 12
Baseline with Development
2027 0.23 13 10 0.27 13 13
2037 0.24 13 10 0.27 13 13
The results of the analysis summarised in Table 23 shows that the existing intersection form
is expected to perform well within the adopted performance thresholds for all assessed
scenarios.
25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E- Traffic Impact Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.