Council archive · source document
Appendix E- Traffic Impact Assessment · MCU23/0135
Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
10 October 2023
SLR Project No.: 620.V30926
Stockwell Development Group Pty Ltd SLR Ref No.: 620.30926-R01-v1.0 Noosa Civic
Noosa Civic Shopping Centre Stage 2 Retail TIA 20231010.docx
Table 16 Retail (Shopping Centre) Use Drop-in Trips ....................................................... 19
Table 17 External Traffic Distribution ................................................................................ 19
Table 18 DTMR GARID Intersection Performance Thresholds ......................................... 20
Table 19 Critical Delay Thresholds ................................................................................... 20
Table 20 I1: Hofmann Drive / Noosa Civic Access Road – SIDRA Outputs ...................... 22
Table 21 I2: Hofmann Drive / Noosa Civic Loop Road – SIDRA Outputs .......................... 23
Table 22 I3: Hofmann Drive / Rene Street / Loading Dock Access– SIDRA Outputs ........ 24
Table 23 I4: Noosa Civic Access Road / Main Street – SIDRA Outputs............................ 25
Figures in Text
Figure 1 Site Location – Regional Context ......................................................................... 1
Figure 2 Site Location – Local Context .............................................................................. 2
Figure 3 Noosa Council Network Upgrades ....................................................................... 4
Figure 4 Local Public Transport ......................................................................................... 5
Figure 5 Local Bicycle Network.......................................................................................... 6
Figure 6 Study Intersections ............................................................................................ 13
Figure 7 Shopping Centre Traffic Generation Decay Curve ............................................. 18
Figure 8 I1: Hofmann Drive / Noosa Civic Access Road – Existing and SIDRA Assessed
Form .................................................................................................................. 22
Figure 9 I2: Hofmann Drive / Noosa Civic Loop Road – Existing and SIDRA Assessed Form
.......................................................................................................................... 23
Figure 10 I3: Hofmann Drive / Rene Street / Loading Dock Access – Existing and SIDRA
Assessed Form .................................................................................................. 24
Figure 11 I4: Noosa Civic Access Road / Main Street – Existing and SIDRA Assessed Form
.......................................................................................................................... 25
Appendices
Appendix A Development Plan
Appendix B Swept Path Assessment
Appendix C Assessed Traffic Volumes
Appendix D ITE Decay Curve
Appendix E Detailed SIDRA Outputs
Appendix F Council Code Responses
iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix E- Traffic Impact Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.