Skip to the record
The gold standard in government transparency.

Council archive · source document

Appendix E- Traffic Impact Assessment · MCU23/0135

of 151

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

MOVEMENT SUMMARY
      Site: I3 [I3 - 2022 Baseline - PM (Site Folder: 2022 BL)]
Output produced by SIDRA INTERSECTION Version: 9.1.3.210
620.30326-Noosa Civic Expansion
Prepared by: SJ
Reviewed by: BR
Site Category: Existing Design
Roundabout


 Vehicle Movement Performance
 Mov     Turn Mov       Demand         Arrival    Deg.    Aver. Level of         95% Back Of     Prop.     Eff.    Aver.    Aver.
 ID           Class        Flows        Flows     Satn    Delay Service             Queue         Que     Stop    No. of   Speed
                     [ Total HV ] [ Total HV ]                                 [ Veh.   Dist ]            Rate    Cycles
                      veh/h % veh/h %               v/c     sec                  veh      m                                  km/h
 South: Hofmann Drive (S)
 1        L2 All MCs        8 3.0      8 3.0     0.011       4.1   LOS A        0.1       0.4     0.41     0.49     0.41     45.5
 2        T1 All MCs        1 3.0      1 3.0     0.011       4.9   LOS A        0.1       0.4     0.41     0.49     0.41     37.3
 3       R2 All MCs         1 3.0      1 3.0     0.011       9.8   LOS A        0.1       0.4     0.41     0.49     0.41     38.9
 3u       U     All MCs     1 3.0      1 3.0     0.011     10.4    LOS A        0.1       0.4     0.41     0.49     0.41     44.7
 Approach                  12 3.0     12 3.0     0.011       5.3   LOS A        0.1       0.4     0.41     0.49     0.41     44.4

 East: Loading Dock Access (E)
 4        L2 All MCs        1 3.0      1 3.0     0.010       1.3   LOS A        0.0       0.3     0.41     0.21     0.41     40.8
 5        T1 All MCs        4 3.0      4 3.0     0.010       1.3   LOS A        0.0       0.3     0.41     0.21     0.41     42.6
 6       R2 All MCs         5 3.0      5 3.0     0.010       1.3   LOS A        0.0       0.3     0.41     0.21     0.41     33.4
 Approach                  11 3.0     11 3.0     0.010       1.3   LOS A        0.0       0.3     0.41     0.21     0.41     38.7

 North: Hofmann Drive (N)
 7        L2 All MCs        5 3.0      5 3.0     0.183       1.9   LOS A        1.0       7.1     0.06     0.37     0.06     26.1
 8        T1 All MCs        7 3.0      7 3.0     0.183       0.0   LOS A        1.0       7.1     0.06     0.37     0.06     37.3
 9       R2 All MCs       283 3.0    283 3.0     0.183       2.9   LOS A        1.0       7.1     0.06     0.37     0.06     37.9
 9u       U     All MCs     1 3.0      1 3.0     0.183       3.8   LOS A        1.0       7.1     0.06     0.37     0.06     28.4
 Approach                 297 3.0    297 3.0     0.183       2.8   LOS A        1.0       7.1     0.06     0.37     0.06     37.7

 West: Rene Street (W)
 10       L2 All MCs      356 3.0    356 3.0     0.223       2.9   LOS A        1.3       9.5     0.07     0.39     0.07     39.7
 11       T1 All MCs        2 3.0      2 3.0     0.223       6.6   LOS A        1.3       9.5     0.07     0.39     0.07     42.1
 12      R2 All MCs         2 3.0      2 3.0     0.223       7.3   LOS A        1.3       9.5     0.07     0.39     0.07     46.6
 12u      U     All MCs     3 3.0      3 3.0     0.223       9.2   LOS A        1.3       9.5     0.07     0.39     0.07     46.9
 Approach                 363 3.0    363 3.0     0.223       3.0   LOS A        1.3       9.5     0.07     0.39     0.07     39.8

 All Vehicles             682 3.0    682 3.0     0.223       2.9   LOS A        1.3       9.5     0.08     0.38     0.08     38.9

Site Level of Service (LOS) Method: Delay (RTA NSW). Site LOS Method is specified in the Parameter Settings dialog (Options
tab).
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.

SIDRA INTERSECTION 9.1 | Copyright © 2000-2022 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: SLR CONSULTING AUSTRALIA | Licence: NETWORK / FLOATING | Processed: Friday, 29 September 2023 1:49:41 PM
Project: H:\Projects-SLR\620-BNE\620-BNE\620.30926.00000 Noosa Shopping Centre Expansion\02 Analysis\02. SIDRA\2023 09 18 - Updated
Lot 1 SIDRA\620.30926-Noosa Lot 1 Retail SIDRA-v0.5.sip9

Used in these records

About this file

File size
10.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix E- Traffic Impact Assessment.pdf · 10.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.