Appendix E- Traffic Impact Assessment
MOVEMENT SUMMARY
Site: I1 [I1 - 2027 Baseline+DEV - SAT (Site Folder: 2027 BL
+DEV)]
Output produced by SIDRA INTERSECTION Version: 9.1.2.202
Noosa Civic Expansion
Prepared by: SJ
Reviewed by: BR
Site Category: (None)
Roundabout
Vehicle Movement Performance
Mov Turn Mov Demand Arrival Deg. Aver. Level of 95% Back Of Prop. Eff. Aver. Aver.
ID Class Flows Flows Satn Delay Service Queue Que Stop No. of Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ] Rate Cycles
veh/h % veh/h % v/c sec veh m km/h
East: Noosa Civic Access Road (E)
5 T1 All MCs 85 0.0 85 0.0 0.688 7.5 LOS A 7.6 54.6 0.75 0.71 0.83 36.7
6 R2 All MCs 724 3.0 724 3.0 0.688 12.7 LOS B 7.6 54.6 0.75 0.71 0.83 35.9
6u U All MCs 13 3.0 13 3.0 0.688 14.9 LOS B 7.6 54.6 0.75 0.71 0.83 46.6
Approach 822 2.7 822 2.7 0.688 12.2 LOS B 7.6 54.6 0.75 0.71 0.83 36.2
North: Hofmann Drive (N)
7 L2 All MCs 942 3.0 942 3.0 0.555 3.6 LOS A 5.9 42.1 0.35 0.43 0.35 49.2
9 R2 All MCs 297 0.0 297 0.0 0.237 8.8 LOS A 1.6 11.1 0.27 0.59 0.27 31.4
9u U All MCs 1 3.0 1 3.0 0.237 11.1 LOS B 1.6 11.1 0.27 0.59 0.27 31.4
Approach 1240 2.3 1240 2.3 0.555 4.9 LOS A 5.9 42.1 0.33 0.47 0.33 46.0
West: Hofmann Drive (W)
10 L2 All MCs 360 0.0 360 0.0 0.567 10.7 LOS B 5.6 39.5 0.96 0.85 1.16 14.8
11 T1 All MCs 51 0.0 51 0.0 0.567 11.0 LOS B 5.6 39.5 0.96 0.85 1.16 42.8
12u U All MCs 1 0.0 1 0.0 0.567 18.4 LOS B 5.6 39.5 0.96 0.85 1.16 14.5
Approach 412 0.0 412 0.0 0.567 10.8 LOS B 5.6 39.5 0.96 0.85 1.16 18.2
All Vehicles 2474 2.0 2474 2.0 0.688 8.3 LOS A 7.6 54.6 0.57 0.61 0.64 37.1
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: SIDRA Roundabout LOS.
Vehicle movement LOS values are based on average delay per movement.
Intersection and Approach LOS values are based on average delay for all vehicle movements.
Roundabout Capacity Model: SIDRA Standard.
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity
Constraint effects.
SIDRA INTERSECTION 9.1 | Copyright © 2000-2022 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: SLR CONSULTING AUSTRALIA | Licence: NETWORK / FLOATING | Processed: Tuesday, 10 October 2023 11:29:10 AM
Project: H:\Projects-SLR\620-BNE\620-BNE\620.30926.00000 Noosa Shopping Centre Expansion\02 Analysis\02. SIDRA\2023 09 18 - Updated
Lot 1 SIDRA\620.30926-Noosa Lot 1 Retail SIDRA-v0.5.sip9
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E- Traffic Impact Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.