Noosa Council may require an inspection for certification to be carried out before
final approval can be issued. Unearthed Geotechnical P/L recommends an inspection
for certification be carried out by the designer prior to commissioning, and preferably
during construction, to ensure code compliance and that ‘best practice’ principles
have been utilised.

As with all use of sand or distribution aggregate for wastewater treatment and disposal
it is very important to restrict the ingress of finer particles to maintain the integrity of
the expected performance outcomes of the sand or distribution aggregate. To this end
Unearthed Geotechnical P/L suggests the entire bed of sand or distribution aggregate
be covered in an appropriate and approved geotextile fabric to restrict such ingress of
finer soil particles. This will help to maintain the expected performance outcomes of
the sand or distribution aggregate. Without the use of an appropriate and approved
geotextile fabric it is probable that the integrity of the sand or distribution aggregate
will likely be compromised.

The treatment plant/ tanks traps and associated fittings shall be

« constructed of durable materials with expandable and/or flexible connections,

* positioned correctly in relation to boundaries, buildings etc to provide an angle of
repose of at least 30 degrees between the bottom of the footing system/excavation
and the base of any associated excavation

watertight and capable of withstanding loads imposed on the roof and walls
installed so that flotation will not occur when the tank/s is empty

installed on a stable base and to prevent surface water infiltration.

located with good clear access for servicing and desludging operations

located within a designated area to enhance its amenity

be protected from roof water/tank discharge, surface water flow and/or seepage
installed and operated in accordance with regulatory guidelines.

The supply lines to the septic tank must be adequately vented with mosquito proof
cowls fitted to all vents.

The Land Application Area shall

« not be located on land prone to water logging or subject to floodwater inundation
« be sited to be open to prevailing winds and not totally shaded from sunlight

« be protected from roof water discharge, surface water flow and/or seepage

e have no runoff or seepage of the applied effluent beyond the designated area

¢ be regularly inspected and maintained

e have the mandatory signage prominently displayed

¢ have boundaries (fence) to deter grazing animals and casual pedestrian traffic

As the slope configuration was recorded to be linear planar the Land Application Area
shall be protected from surface water infiltration by the installation of an excavated
surface water diversion drain (suggested minimum 1000mm wide and 150mm deep)
and from runoff by the installation of a vegetated track rolled retention
moundAranspiration buffer zone (suggested minimum 1000mm wide and 150mm

high).

 

Unearthed Geotechnical P/L. 9 Design Report 020-212
Log in to download the original file

Effluent Disposal Report.PDF · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.