Effluent Disposal Report
3.0 DESIGN DETERMINATION We have determined the soil to have the following characteristics Borehole Nos 3&4 Depth (mm) 0 - 200 Soil Category 5 Indicative Drainage Poor Structure Strong Texture ; Light Clay Indicative Permeability P (metres/day) as Kat 0.12 - 0.5 For our calculations we have assessed the design flow as follows DLR (mm/day) (Advanced Enviro-septic™ effluent) 5-8 Hydraulic load (litres/day/person) 120 Design flow Q (litres/day) (equivalent population 5 people) 600 Total System Footprint (m’) =75 Septic Tank minimum size requirement (litres) 3000 Advanced Enviro-septic™ System Note — AS/NZS 1547-2012 (Appendix H, Table H1) lists the typical wastewater design flow allowance for households with an on-site roof water tank supply as 120-litres/person/day (all wastes). With the installation of standard water reduction fixtures the design flow can be reduced substantially. Note — In this instance we have used the maximum DLR of 8 mm/day due to the very highly structured nature of the Category 5 soil recorded in BH 3 and that we recorded Category 4 soil in BH 4. Where the design flow ‘Q’, nominated above, is exceeded the area (Ai) may need to be increased accordingly. This sewerage system is not suitable for accepting waste from garbage grinders. Unearthed Geotechnical P/L. 3 Design Report 020-212
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.