Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
and may be further amended by the conditions of this approval.
Plan No. Rev. Plan/Document Name Date
A-AD-0002 N Site Plan, prepared by Buchan 18.05.22
A-DA-100-B1 K Basement 01, prepared by Buchan 18.05.22
A-DA-100-B2 K Basement 02, prepared by Buchan 18.05.22
A-DA-1000 P Ground Floor Plan, prepared by Buchan 18.05.22
A-DA-1001 O Level 01 Plan, prepared by Buchan 18.05.22
1200 I Roof Plan, prepared by Buchan 18.05.22
A-DA-2000 E Sections, prepared by Buchan 18.05.22
A-DA-3000 K Elevations, prepared by Buchan 18.05.22
A-DA-6001 G Perspectives, prepared by Buchan 18.05.22
A-DA-6002 C Perspectives, prepared by Buchan 18.05.22
1.1 Site Plan, prepared by place design group 17.03.22
1.2 Landscape Elevations, prepared by place 17.03.22
design group
1.3 Perspective view, prepared by place design 17.03.22
group
2.1 Indicative plant palette – streetscape and entry 17.03.22
landscaping, prepared by place design group
2.2 Indicative plant palette – bio basin landscaping, 17.03.22
prepared by place design group
3.1 Indicative materials palette, prepared by place 17.03.22
design group
Nature and Extent of Approved Use
3. The approved use must not commence until all works required by RAL18/0023 have
been completed.
4. This approval is for a total of 2,170m2 of gross floor area, as depicted on the Approved
Plans, for the following uses:
a. Commercial Business Type 1 – Office
b. Commercial Business Type 2 – Medical
5. The approved uses and associated activities must not result in environmental nuisances
such as noise, visual or odour impacts that unreasonably diminish the amenity of the
area or surrounding uses.
Currency Period
6. This development approval lapses if the use has not happened by 18 August 2028,
unless an application to extend the currency period is approved by Council.
Built Form and Development Appearance
7. The maximum height of the development must be in accordance with the approved
plans.
Page 2 of 16
Document Set ID: 22079448
Version: 6, Version Date: 24/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
NBC Lot 22 Representaitons for an NDN - SLR Traffic Memorandum of Advice 23.09.22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.