                        Retention of Existing Vegetation
                 31.    A Tree Management Plan in accordance with AS4970-2009 detailing vegetation in the
                        covenant to the north of the site (Cov. I SP182845). The TMP will demonstrate the Tree
                        Protection Zones and Structural Root Zones of vegetation in the covenant are protected,
                        to ensure the health and longevity of vegetation in the covenant. If impacts are
                        proposed, offset planting may be required for any impacted vegetation.
                 32.    The report must be resubmitted to Council incorporating the above amendments prior
                        to the issue of any Development Permit for Operational Works.
                 33.    Prior to the prestart meeting, a bank guarantee or a bond of $30,000 must be lodged as
                        security for the protection of the tree/s identified for retention in the conditions of this
                        approval. The bond:
                        a.      may be drawn upon by Council in its entirety if any one tree identified for retention
                                is damaged to the point where the tree cannot be saved (as confirmed by the
                                project arborist and agreed in writing by Council)
                        b.      will be returned upon practical completion of all the operational works relating to
                                this development.
                 34.    The tree/s identified for retention in the conditions of this approval must be maintained
                        in good health for the life of the tree.
                        Environment
                 35.    Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994)
                        must not be released from the site or to waters within the site, or be likely to be released
                        should rainfall occur, unless all reasonable and practicable measures are taken to
                        prevent or minimise the release and concentration of contamination.
                 36.    Erosion and sediment control measures must be installed and maintained to minimise
                        erosion on the site and to minimise the export of sediment and associated pollutants
                        from the site. The erosion and sediment control measures must be designed, installed
                        and maintained in accordance with current best practice standards
                        (*Refer to Advisory Notes).
                 37.    Limit soil exposure on the site to a distance of no more than 2m beyond the extent of
                        earthworks shown on the approved plans except where the exposed soil is effectively
                        stabilised without delay and prior to rainfall occurring.
                 ENGINEERING/TRAFFIC
                        External Works
                 38.    Hoffman Drive and the internal service road must be upgraded for the length of its
                        frontage to the subject site. The works must be undertaken in accordance with an
                        Operational Works approval and must include in particular:
                        a.      Rectification of any damage to existing kerb and channelling; and
                        b.      Construction of a pedestrian footpath in accordance with the conditions of this
                                Decision Notice.
                        Site Access and Driveways
                 39.    A sealed access driveway must be provided from the internal service road to all parking
                        and manoeuvring areas of the development. The works must be undertaken in
                        accordance with an Operational Works approval and must include in particular:
                        a.      a driveway crossover in accordance with Council’s standard drawing RS-051 and
                                respective addendum; and




                                                                                                           Page 5 of 16
Document Set ID: 22079448
Version: 6, Version Date: 24/08/2022

Used in these records

About this file

File size
19.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

NBC Lot 22 Representaitons for an NDN - SLR Traffic Memorandum of Advice 23.09.22.pdf · 19.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.