c. Not permitted on Sunday or public holidays.
Measurement of Noise
13. Measurement of sound pressure levels (adjusted for tonality and impulse) must be in
accordance with either:
a. Australian Standard AS1055.1 “Acoustics–Description and measurement of
environmental noise – General procedures”, or
b. The relevant “Noise Measurement Manual” as provided by the Department of
Environment and Heritage Protection.
14. A qualified person is considered to be either:
a. a Registered Professional Engineer of Queensland, or;
b. an environmental consultant with a minimum of 3 years current experience in the
field of acoustics.
Environmental Protection
15. The development should be undertaken in a manner that causes no unlawful
environmental nuisance under the Environmental Protection Act 1994 by the creation of
excessive noise, lighting, waste, atmospheric pollutants (including dust or odours) or
other releases to the environment.
16. In accordance with the Environmental Protection Act 1994, all sand, silt, mud, paint,
cement, concrete, builder’s waste or other prescribed contaminants should not to be
released to or be placed where it could reasonably be expected to move into a roadside
gutter, storm water drain or a watercourse. On the spot fines apply for such offences.
ENGINEERING ADVICE
Co-ordination of Operational Works Assessment
17. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Landscaping, Stormwater, Frontage Works,
Works Access, Earthworks and Car Parking
Development Permit for Building Works All building works
10. SUBMISSIONS
Not applicable.
Page 12 of 16
Document Set ID: 22079448
Version: 6, Version Date: 24/08/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
NBC Lot 22 Representaitons for an NDN - SLR Traffic Memorandum of Advice 23.09.22.pdfRelated documentApplication case desk ↗
About this file
- File size
- 19.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.