DRAWING SIZE - Al
MANAGEMENT PLAN
— Ensure the inflow into the pit is protected with
an approved leaf and silt guard.
— The pit MUST be wrapped in geofabric cloth as
specified.
— The pit should be backflushed on a regular basis
(3 months) to remove any silts or similiar
materials.
~ The pit should only be used for the disposal of
stormwater.
Settlement 100mm
Allowance.
Topsoil Bund
10 |
Grid of Slotted
Agg pipes 150 min
clearance to base. As per plan
STORMWATER SOAKER PIT DETAIL
Slotted horizontal
agg laterals
pipes equally spaced.
(A \ TYPICAL SECTION ~ A - A
Oy DETAILS
Pipe Grid at Base
GEND
7:77 INDICATES EXISTING SURFACE
48.00 CONTOUR AND LEVEL TO AHD.
FAL, INDICATES DIRECTION OF FALL
TO FINISHED DRAINS.
450Sq GRATED FIELD INLETS,
EE] pre-cast concrete.
+309 =~ INDICATES PROPOSED FINISHED R.L SPOT
SURFACE LEVELS.
As per plan
\ comm clean
aggregate encased
As per plan
Wet tooled 125 Thick —
control pit. \ driveway slab. 2/908 vPVC
Cut every 2nd
NOMINAL KERB Barri
SETOUT LINE arnier
, Kerb to
é detail
ROOF DRAINAGE
ALL ROOF DRAINAGE TO DRAIN TO Q
PROPOSED WATER TANKS. FINAL -
DOWNPIPE LOCATIONS TO FUTURE 8 ____ Extend sub-base 150mm
DETAIL. passed back of kerb.
Depth { Subgrade preperation, refer
determined PAVEMENT MATERIALS general notes.
on-site. 125mm N25 Concrete pavement, SL82 Mesh Middle
100 Base course type 2.1 CBR 40 OR Compacted Sand Base
Sub—grade preperation in accordance with specifications/notes
ROP ET E2UND Ap, CONCRETE DRIVEWAY SECTION
_ PROPPING TO 190 BLOCK
% ———~ RETAINING WALL DURING
COMPACTED FILL TO 98%
STANDARD, PROVIDE BACK
ry ;
FFL 43.515 Slam. +E ee CONSTRUCTION
GARAGE a a 7.
Ay Tae
ee
i We co a
a eso
SFio\ ea ~~
—— 1-7 I
t}GPI a
Ba Eg” !
/
RESIDENCE 2
LOT 2
AREA : 718.87m?
PROPOSED NEW
RESIDENCE
FFL 43,765
GARAGF
LOT 1
AREA : 800.81m?
PROPOSED NEW
RESIDENCE
TANK OVERFLOW
3(No.) ey eo -
SL72 mesh
wire along line middle STORMWATER SOAKAGE . ———
of joint. PITS TO DETAIL. 2/900 PVE = RGSS
TANK OVERFLOW ERTY 5
TJ) TOOLED JOINT DETAIL DRIVEWAY WORKS AND DRAINAGE
Sunshine Coast Regional Council
Development Permit Operational Works tio: 262".
Under no circumstances may the Plan & Specitications be departed
from within the written approval of Councit.
PLANS
START OF EXISTING
BITUMAN DRIVEWAY
CE ow
eee FLEE, eset
not scale from this drowing.
dimensions in
ting out dimensions are to be obtained from the orchitectura!
to the engineer i
is responsible for locating ofl existing services within and
sholl ensure thot oll new marks are in
ze
yeep o
a} 5
8
s
ZY
fi
EE
2
eriaceesunc ats
ia
ba Uibet
LasH HE
pase lee
apet FEE g
ae bee:
pitt efi :
asf
i |
4 ¥
aie
il
i
}
i
i
i
3
eid
&
g
3
&¢
He
i
f
Ez
{
tie
i
itll
Hie
peur
iit sit
eat
ce
”3
i
Ey
Hl
cil
HH
it
it
i
i
2
DO NOT SCALE FROM THIS DRAWING
Beacate rena ree
SCG Consulting Engineers.
CONSULTING ENGINEERS
SC ructural - Givil - geotechnical
st
ABN 40 098 481
18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) §447 5544 Fax (07) 5447 2634
Title:
DRIVEWAY WORKS & DRAINAGE
Project
POWELL RESIDENCE
Little Cove Rd, Noosa Heads
eam oe [|
em 7266-0W2 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0529 - Approved Plan [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.