Original source · versioned page text
RFI - Stormwater Management Plan
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 8°
BDY
NOTE: ALL WORKS TO BE
6°
BALC TYPICAL ROOM ROOF GARDEN
UNDERTAKEN UNDER STRICT
AC AC AC
GUIDEANCE OF ARBORIST
BALC TYPICAL ROOM C'DOR TYPICAL ROOM BALC
TYPICAL ROOM C'DOR TYPICAL ROOM BALC
PROPERTY BOUNDARY
PROPERTY BOUNDARY
BALC TYPICAL ROOM C'DOR
PROPOSED DRAINAGE
TYPICAL ROOM BALC
NETWORK TO
TYPICAL ROOM C'DOR TYPICAL ROOM BALC OUTLET <Q3MONTH FLOWS TO PROPOSED BUNDED SWALE
SURFACE OF SWALE. HIGHER FLOWS BUND LEVEL
HOTEL OFFICE C'DOR TO BEROOM
TYPICAL PIPED DIRECTLY
BALC TO RIP'S
RL9.5 MIN
TYPICAL ROOM C'DOR TYPICAL ROOM BALC
CARPARK BIN STORE TREATMENT
HOTEL OFFICE BOH C'DOR HOTEL ADMIN DRIVEWAY POOLS
FIRE ISOLATED
EMERGENCY OVERFLOW VIA
PROPOSED DRAINAGE NETWORK TO CORRIDOR
CARPARK ROCK PROTECTED WEIR
DRIVEWAY DAY SPA OUTLET <Q3MONTH FLOWS TO
SURFACE OF SWALE. HIGHER FLOWS
TO BE PIPED DIRECTLY TO RIP'S PROPOSED RAPID
INFILTRATION PITS (RIP'S)
(RL9.00m)
SECTION C
SECTION E
SCALE 1:200 A1 SCALE 1:200 A1 SMP04
SMP04
8°
7°
ROOF GARDEN
TYPICAL
ROOM ROOF PLANT
TYPICAL ROOM ROOF GARDEN
TYPICAL STORE C'DOR TYPICAL ROOM BALC
ROOM
TYPICAL ROOM C'DOR TYPICAL ROOM BALC
PROPERTY BOUNDARY
STORE C'DOR TYPICAL ROOM BALC
PROPERTY BOUNDARY
TYPICAL ROOM C'DOR TYPICAL ROOM BALC
C'DOR TYPICAL ROOM BALC
LIFT STAIRS
HOTEL OFFICE C'DOR TYPICAL ROOM BALC
LOADING DAY SPA EXTERNAL
RAMP BAY TREATMENT POOLS
CARPARK SERVICES DAY SPA
DRIVEWAY PLANT FIRE ISOLATED
CORRIDOR
PROPOSED DRAINAGE NETWORK TO
OUTLET <Q3MONTH FLOWS TO
SURFACE OF SWALE. HIGHER FLOWS PROPOSED DRAINAGE NETWORK TO
TO BE PIPED DIRECTLY TO RIP'S OUTLET <Q3MONTH FLOWS TO
SURFACE OF SWALE. HIGHER FLOWS
TO BE PIPED DIRECTLY TO RIP'S
SECTION D SECTION F
SCALE 1:200 A1 SMP04 SCALE 1:200 A1 SMP04
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 DRAINAGE SECTIONS - SOUTH
FOR APPROVAL Date: AUG 2022 26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-23-SMP05 A 5 of
STEVEN HARRISON
Email: [email protected]
A 10/07/2023 ISSUE FOR APPROVAL PBL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CALILE MALOUF INVESTMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6769-23-SMP05 RIP section.dwg - DATE : 10/7/23 - 1:31pm - XREF's: H-Approved-SH; H-Checked-SH Council Ref:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.