Original source · versioned page text
RFI - Stormwater Management Plan
The original of this document is very large (13.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 30, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTABLE 1.0 RESULTS OF PROTOTYPE INFILTRATION PIT (IP) TESTING 23 JULY 2001 HEAD (M) 0 10 20 30 40 50 INFILTRATION RATE (mm/SEC) —_— eRe ee eee PROJECT: DRAWING TITLE: ‘WHE PROTSSOHA paees Py LD 7 TAL EE: tine ee oeosre, SETTLERS COVE — HIGH DENSITY RESIDENTIAL INGIETRATION [ETTATEST RSG RESUCTS) BL? eo 20 fo (07) 2443 724 at SERENITY CLOSE, NOOSA HEADS DRAWING No: CIGSG/0B/MCU/IP2 Revision: ORAWNG STATUS Design: CDF, Drown: CDF. Date: May 2008 Checked: SH, Datum: AKD, Emok engineers@otenct ov for SETERS COVE DEVELOPMENT Pry un Cauncil Ref; Sheet | of J PROFESSIONAL ENGINEERS Wet: Mte://wew.totenetou TACADTSOVUGIAALE NOAFRST GUDRUN ODCO OLED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.