Original source · versioned page text
RFI - Stormwater Management Plan
Plans and drawings: the text below has words only, no drawings.
Very large file (13.7 MB): may take a few minutes to open.
Original PDF page 43, section 1. The text section number identifies this passage in the reader.
NODE 05 CATCHMENTS: EXTERNAL UPSTREAM CATCHMENT + VEGETATION AREA + BALANCE 6/1 + SERENITY EX/10 + SERENTIY 8/1 Q100 = 1.59m3/s Q10 = 1.038m3/s GAP FLOW = 0.552m3/s NODE 05 - LOWERED FOOTPATH - FULL Q100 NODE 05 - LOWERED FOOTPATH - GAP FLOW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.