Planning Report
The preliminary approval has a currency period of six years and will expire in April 2013. A copy of the
approval and associated site plan is included in Appendix A.
This development application does not rely on the preliminary approval and the preliminary approval will
remain in place regardless of this application.
1.3 Prelodgement Discussions
A pre-lodgement meeting was held with the Sunshine Coast Regional Council on 10 November 2010.
Minutes prepared by Buckley Vann Town Planning Consultants are attached as Appendix B.
The issues discussed at the meeting and their outcomes are summarised below.
Issues Discussion/Outcome
(a) Proposed GFA of Proposed GFA is 2,224m2, with 32 beds and 4 staff.
new special care
building Outcome: Council is not concerned by the additional GFA, provided the
overall GFA does not exceed 12,200m2, with a site cover of 30%.
(b) Setback to rear Approximately 1.5m of landscaping is provided along the rear boundary.
boundary
Outcome: A revised plan to be provided to Council, due to the following
concerns:
proximity of the driveway to adjoining to the north;
the interface between the facility and the residential uses to the north;
amenity issues; and
frequency of laundry vehicles and gas delivery vehicles.
(c) Setback to street Car parking is proposed to be set back 4.5m from the road frontage.
frontage
Outcome: Council is happy to accept this setback, provided that existing
landscaping is retained and/or more landscaping provided.
(d) Setback to eastern A turning circle is proposed in the south-western corner of the site within the
boundary and 6m setback, which removes the need for trucks to do a three point turn to
location of new exit the premises.
kitchen block
Outcome: A revised plan to be provided to Council, due to the following
concerns:
protection of the neighbour s amenity;
noise generated by vehicles and by kitchen and service block;
reversing operations so close to the neighbouring property;
high activity area so close to the neighbouring property;
preferable no to extend in this corner unless layout reviewed; and
number of parking spaces here can be reduced provided overall parking
spaces on the site comply with the planning scheme requirements.
(e) Engineering issues Loss of on-street car parking is acceptable and car parking is to be provided at
the rates set out in the planning scheme, including the emergency vehicle bay.
(f) General Supporting documentation to be lodged with the application is to include:
landscape concept plan;
stormwater management plan;
traffic report, including a traffic management plan, detailing, for example
frequency of deliveries to kitchen and laundry facilities.
(g) Further action Council is to review a revised set of drawings (as per the requested changes
above) before the application is lodged.
Development Permit for a MCU
NoosaCare Inc
186 Cooroy-Noosa Road, Tewantin
Buckley Vann
Town Planning Consultants
April 2011 Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.