1. INTRODUCTION
The purpose of this report is to classify the subject allotment in accordance with
Australian Standard 2870-2011 'Residential Slabs and Footings. From this classification
a footing system has been recommended for the structure so as to allow adequate
performance of the footings under the soil conditions determined at the site.
This report relates exclusively to the proposed pool at subject allotment, as detailed on
the architectural drawings supplied by the client. This document has been prepared for
the express purpose stated above. This document does not cover any other elements
related to construction on the site.
2. SITE DESCRIPTION
The subject allotment is a residential lot fronting a sealed road, there is an existing
residence at the site and the proposed pool is to be located towards the rear. The
proposed site has average grass cover with dense undergrowth and many shrubs and
small trees present, the site falls towards the rear of the block at an approximate slope
of 15%.
3. SOIL PROFILE
The borelogs carried out at the site, refer attached Site Plan for localities, indicate that
the soil profile consists of clayey sand (high organic content - peat) overlying silty sand.
A WATERTABLE was encountered at the time of testing at a depth of 900mm.
Whilst every effort has been made to ensure that the borelogs carried out at the subject
allotment are indicative of the soil profile over the site any discrepancy between the
profile detailed in the borelogs and that observed during construction shall be referred
to the Consulting engineer for immediate attention.
4. MATERIALS LABORATORY TEST RESULTS
Determination of the classification for the site in this situation is based upon test results
from Dynamic Cone Penetrometer testing performed over the site and shrink/swell test
results.
Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 11 pages
Page 2
5. SITE CLASSIFICATION AND TARGET STRATA
Based on the findings of the site investigation and the footing system design proposed
on the client supplied information, the classification of the site is considered to conform
to: -
CLASS " P "
This classification is due to poor bearing capacity of the existing soil and
the presence of peat.
However, if this was not the case the soil type and reactivity would
be comparable to that of a CLASS " M ".
in accordance with Australian Standard 2870-2011, 'Residential Slabs and Footings,
Construction'.
An allowable bearing capacity of 100kPa is reached with the medium dense SILTY
SAND which occurs at a depth of 1200mm from the existing ground level at location
BH1 and at a depth of 1300mm at location BH2. Any fill placed over the existing
ground shall be piered through the fill into the existing material. Further note that the
placement of reactive material as fill may change the site’s classification.
6. FOOTING SYSTEM DESIGN
The footing system shall be designed to conform to the performance limits stated in AS
2870 – 2011 and reprinted in the C.S.I.R.O.'s Publication 10/91, 'Guide to Home
Owners on Foundation Maintenance and Footing Performance', a copy of which
attached to this report. It should be noted that footings designed in accordance with
AS2870-2011 does not guarantee no movement of footings, shrinkage cracking or other
damage to the building.
Foundation preparation and footing construction shall be in accordance AS 2870 -2011
and AS 3798-1990 'Guidelines on Earthworks for Commercial and Residential
Developments'.
Where necessary, subsoil drainage shall be incorporated in the construction of the
building to ensure that subsurface water is properly drained away from the footings.
Potential seepage or subsoil drainage problems cannot always be recognised from the
results of a site investigation. Problems with respect to subsurface water flow or
seepage may not be evident until after the site has been subject to the first significant
wet period.
After construction of the footing system the ground surface around the residence shall
be sloped away from the footings at a fall of 1 in 20 minimum for a distance of 2000
mm.
7. ARTICULATION
It is recommended that masonry walls on Class M, H, E and P sites be articulated at all
or some openings. Articulation joints shall be constructed in accordance with the
Cement and Concrete Association's Publication 'TN61 - Articulated Walling'.
Page 3
8. SERVICES
Expansive or collapsing soils require special considerations at service connections to
ensure flexibility to prevent damage or breakage. In areas where known expansive or
collapsing soils are present flexible connections and impervious plugs shall be provided
to all services including all drainage, stormwater and septic system.
On and Behalf of
LINDSAY CONSULTING PTY LTD
Jason Lindsay
RPEQ 4928
Page 4
LIMITATIONS Recommendations given in this report are based on the information supplied by the client regarding the proposed building construction in conjunction with the findings of the investigation. Any change in construction type, building location or omission in the client supplied information, may require additional testing and/or make the recommendations invalid. The recommendations herein identify a target soil stratum into which the footings are to be founded. The target stratum has been located by the depth in mm of the target stratum's upper horizon boundary below the existing ground surface level at the time of the site investigation. Any cutting or filling works and any surface erosion or deposits subsequent to the site investigation, will alter the measured location of the stratum relative to the surface. Where required, the author should be notified in such cases to confirm the location of the target stratum. The description of the soil given in the Soil Profile section of this report is intended as a brief overview of the soil's primary constituents. For a detailed classification of the soil, the reader should refer to the Soil Profile Reports and/or Borehole Reports attached to this report. Every reasonable effort has been made to locate the test sites so that the borehole profiles are representative of the soil conditions within the area investigated. The client should be made aware however, that exploration is limited by time available and economic restraints. In some cases soil conditions can change dramatically over short distances, therefore, even careful exploration programs may not locate all the variations. If soil conditions different from those shown in this report are encountered or are inferred from other sources, then the author must be notified immediately. This report may not be reproduced except in full. The information and drawings provided with this report shall only be used and will only be applicable for the development shown on the client supplied information provided for this site. Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan shall not be used for any building construction or costing calculations. The purpose of the plan is to show approximate location of field tests only. Any changes made to these recommendations by persons unauthorised by the author will legally be interpreted as that person assuming the responsibility for the long-term performance of the footing system. The recommendations contained in this report have not taken into consideration the long term effects of any previous, current or potential subsurface work by mining companies or potential slope instability problems. At the time of writing this report neither our client (nor his agent) nor the local authority had made the author aware that these problems may be affecting this allotment. If a mining subsidence or slope stability assessment is required for this allotment, the recommendations of a suitably qualified geotechnical engineer should be sought.
Page 5
Foundation Maintenance and Footing Performance: A Homeowner's Guide (i) CSIRO BIF 18 replaces Information Sheet 10/91 Buildings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause of movement in buildings can usually be related to one or more problems in the foundation soil. It is important for the homeowner to identi the soil type in order to ascertain the measures that should be put in place in order to ensure that problems in the foundation soil can be prevented, thus protecting against building movement. This Building Technology File is designed to identify causes of soil-related building movement, and to suggest methods of prevention of resultant cracking in buildings. Soil Types ‘The types of soils usually present under the topsoil in land zoned for residential buildings can be split into two approximate groups — granular and clay. Quite often, foundation soil is a mixture of both types. The general problems associated with soils having granular content are usually caused by erosion. Clay soils are subject to saturation and swell/shrink problems. Classifications for a given area can generally be obtained by application to the local authority, but these are sometimes unreliable and if there is doubt, a geotechnical report should be commissioned. As most buildings suffering movement problems are founded on clay soils, there is an emphasis on classification of soils according to the amount of sweil and shrinkage they experience with variations of water content. The table below is Table 2.1 from AS 2870, the Residential Slab and Footing Code. Settlement due to construction There are two types of settlement that occur as a result of construction: * Immediate settlement occurs when a building is first placed on its foundation soil, as a result of compaction of the soil under the weight of the structure. The cohesive quality of clay soil mitigates against this, but granular (particularly sandy) soil is susceptible. * Consolidation settlement is a feature of clay soil and may take place because of the expulsion of moisture from the soil or because of the soil’s lack of resistance to local compressive or shear stresses. This will usually take place during the first few months after construction, but has been known to take many years in exceptional cases. These problems are the province of the builder and should be taken into consideration as part of the preparation of the site for construc- tion. Building Technology File 19 (BTF 19) deals with these problems. Erosion All soils are prone to crosion, but sandy soil is particularly susceptible to being washed away. Even clay with a sand component of say 10% or more can suffer from erosion. Saturation This is particularly a problem in clay soils. Saturation creates a bog- like suspension of the soil that causes it to lose virtually all of its bearing capacity. To a lesser degree, sand is affected by saturation because saturated sand may undergo a reduction in volume — particularly imported sand fill for bedding and blinding layers. However, this usually occurs as immediate settlement and should normally be the province of the builder. Seasonal swelling and shrinkage of soil All clays react to the presence of water by slowly absorbing it, making the soil increase in volume (see table below). The degree of increase varies considerably between different clays, as does the degree of decrease during the subsequent drying out caused by fair weather periods. Because of the low absorption and expulsion rate, this phenomenon will not usually be noticeable unless there are prolonged rainy or dry periods, usually of weeks or months, depending on the land and soil characteristics. The swelling of soil creates an upward force on the footings of the building, and shrinkage creates subsidence that takes away the support needed by the footing to retain equilibrium. Shear failure This phenomenon occurs when the foundation soil does not have sufficient strength to support the weight of the footing. There are two major post-construction causes: * Significant load increase. + Reduction of latcral support of the soil under the footing due to crosion or excavation. * In clay soil, shear failure can be caused by saturation of the soil adjacent to or under the footing. GENERAL DEFINITIONS OF SITE CLASSES Class Foundation A Most sand and rock sites with little or no ground movement from moisture changes Ss Slightly reactive clay sites with only slight ground movement from moisture changes M Moderately reactive clay or silt sites, which can experience moderate ground movement from moisture changes H Highly reactive clay sites, which can experience high ground movement from moisture changes E Extremely reactive sites, which can experience extreme ground movement from moisture changes AtoP Filled sites P Sites which include soft soils, such as soft clay or silt or loose sands; landslip; mine subsidence; collapsing soils; soils subject to erosion; reactive sites subject to abnormal moisture conditions or sites which cannot be classified otherwise
Page 6
Tree root growth Trees and shrubs that are allowed to grow in the vicinity of footings can cause foundation soil movement in two ways: * Roots that grow under footings may increase in cross-sectional size, exerting upward pressure on footings. * Roots in the vicinity of footings will absorb much of the moisture in the foundation soil, causing shrinkage or subsidence. | Unevenness of Movement The types of ground movement described above usually occur unevenly throughout the building’s foundation soil. Settlement due to construction tends to be uneven because of: * Differing compaction of foundation soil prior to construction. * Differing moisture content of foundation soil prior to construction. Movement due to non-construction causes is usually more uneven still. Erosion can undermine a footing that traverses the flow or can create the conditions for shear failure by eroding soil adjacent to a footing that runs in the same direction as the flow. Saturation of clay foundation soil may occur where subfloor walls create a dam that makes water pond. It can also occur wherever there is a source of water near footings in clay soil. This leads to a severe reduction in the strength of the soil which may create local shear failure. Seasonal swelling and shrinkage of clay soil affects the perimeter of the building first, then gradually spreads to the interior. The swelling process will usually begin at the uphill extreme of the building, or on the weather side where the land is flat. Swelling gradually reaches the interior soil as absorption continues. Shrinkage usually begins where the sun's heat is greatest. Effects of Uneven Soil Movement on Structures Erosion and saturation Erosion removes the support from under footings, tending to create subsidence of the part of the structure under which it occurs. Brickwork walls will resist the stress created by this removal of support by bridging the gap or cantilevering until the bricks or the mortar bedding fail. Older masonry has little resistance. Evidence of failure varies according to circumstances and symptoms may include: * Step cracking in the mortar beds in the body of the wall or above/below openings such as doors or windows. * Vertical cracking in the bricks (usually but not necessarily in line with the vertical beds or perpends). Isolated piers affected by erosion or saturation of foundations will eventually lose contact with the bearers they support and may tilt or fall over. The floors that have lost this support will become bouncy, sometimes rattling ornaments etc. Seasonal swelling/shrinkage in clay Swelling foundation soil due to rainy periods first lifts the most exposed extremities of the footing system, then the remainder of the perimeter footings while gradually permeating inside the building footprint to lift internal footings. This swelling first tends to create a dish effect, because the external footings are pushed higher than the internal ones. The first noticeable symptom may be that the floor appears slightly dished. This is often accompanied by some doors binding on the floor or the door head, together with some cracking of cornice mitres. In buildings with timber flooring supported by bearers and joists, the floor can be bouncy. Externally there may be visible dishing of the hip or ridge lines. As the moisture absorption process completes its journey to the innermost areas of the building, the internal footings will rise. If the spread of moisture is roughly even, it may be that the symptoms will temporarily disappear, but it is more likely that swelling will be uneven, creating a difference rather than a disappearance in symptoms. In buildings with timber flooring supported by bearers and joists, the isolated piers will rise more easily than the strip footings or piers under walls, creating noticeable doming of flooring. Seen re eee rly Ww eR. BL Wall cracking due to uneven footing settlement As the weather pattern changes and the soil begins to dry out, the external footings will be first affected, beginning with the locations where the sun’s effect is strongest. This has the effect of lowering the external footings. The doming is accentuated and cracking reduces or disappears where it occurred because of dishing, but other cracks open up. The roof lines may become convex. Doming and dishing are also affected by weather in other ways. In areas where warm, wet summers and cooler dry winters prevail, water migration tends to be toward the interior and doming will be accentuated, whereas where summers are dry and winters are cold and wet, migration tends to be toward the exterior and the underlying propensity is toward dishing. Movement caused by tree roots In general, growing roots will exert an upward pressure on footings, whereas soil subject to drying because of tree or shrub roots will tend to remove support from under footings by inducing shrinkage. Complications caused by the structure itself Most forces that the soil causes to be exerted on structures are vertical — i.e. either up or down. However, because these forces are seldom spread evenly around the footings, and because the building resists uneven movement because of its rigidity, forces are exerted from one part of the building to another. The net result of all these forces is usually rotational. This resultant force often complicates the diagnosis because the visible symptoms do not simply reflect the original cause. A common symptom is binding of doors on the vertical member of the frame. Effects on full masonry structures Brickwork will resist cracking where it can. It will attempt to span areas that lose support because of subsided foundations or raised points. It is therefore usual to see cracking at weak points, such as openings for windows or doors. In the event of construction settlement, cracking will usually remain unchanged after the process of settlement has ceased. With local shear or erosion, cracking will usually continue to develop until the original cause has been remedied, or until the subsidence has completely neutralised the affected portion of footing and the structure has stabilised on other footings that remain effective. In the case of swell/shrink effects, the brickwork will in some cases return to its original position after completion of a cycle, however it is more likely that the rotational effect will not be exactly reversed, and it is also usual that brickwork will settle in its new position and will resist the forces trying to return it to its original position. This means that in a case where swelling takes place after construction and cracking occurs, the cracking is likely to at least partly remain after the shrink segment of the cycle is complete. Thus, each time the cycle is repeated, the likelihood is that the cracking will become wider until the sections of brickwork become virtually independent. With repeated cycles, once the cracking is established, if there is no other complication, it is normal for the incidence of cracking to stabilise, as the building has the articulation it needs to cope with the problem. This is by no means always the case, however, and monitoring of cracks in walls and floors should always be treated seriously. Upheaval caused by growth of tree roots under footings is not a simple vertical shear stress. There is a tendency for the root to also exert lateral forces that attempt to separate sections of brickwork after initial cracking has occurred.
Page 7
The normal structural arrangement is that the inner leaf of brick-
work in the external walls and at least some of the internal walls
(depending on the roof type) comprise the load-bearing structure on
which any upper floors, ceilings and the roof are supported. In these
cases, it is internally visible cracking that should be the main focus
of attention, however there are a few examples of dwellings whose
external leaf of masonry plays some supporting role, so this should
be checked if there is any doubt. In any case, externally visible
cracking is important as a guide to stresses on the structure generally,
and it should also be remembered that the external walls must be
capable of supporting themselves.
Effects on framed structures
Timber or steel framed buildings are less likely to exhibit cracking
due to swell/shrink than masonry buildings because of their
flexibility. Also, the doming/dishing effects tend to be lower because
of the lighter weight of walls. The main risks to framed buildings are
encountered because of the isolated pier footings used under walls.
Where erosion or saturation cause a footing to fall away, this can
double the span which a wall must bridge. This additional stress can
create cracking in wall linings, particularly where there is a weak
point in the structure caused by a door or window opening. It is,
however, unlikely that framed structures will be so stressed as to suffer
serious damage without first exhibiting some or all of the above
symptoms for a considerable period. The same warning period should
apply in the case of upheaval. It should be noted, however, that where
framed buildings are supported by strip footings there is only one leaf
of brickwork and therefore the externally visible walls are the
supporting structure for the building. In this case, the subfloor
masonry walls can be expected to behave as full brickwork walls.
Effects on brick veneer structures
Because the load-bearing structure of a brick veneer building is the
frame that makes up the interior leaf of the external walls plus
perhaps the internal walls, depending on the type of roof, the
building can be expected to behave as a framed structure, except that
the external masonry will behave in a similar way to the external leaf
of a full masonry structure.
id Di
Water Servi
Where a water service pipe, a sewer or stormwater drainage pipe is in
the vicinity of a building, a water leak can cause erosion, swelling or
saturation of susceptible soil. Even a minuscule leak can be enough
to saturate a clay foundation. A leaking tap near a building can have
the same effect. In addition, trenches containing pipes can become
watercourses even though backfilled, particularly where broken
rubble is used as fill. Water that runs along these trenches can be
responsible for serious erosion, interstrata seepage into subfloor areas
and saturation.
Pipe leakage and trench water flows also encourage tree and shrub
roots to the source of water, complicating and exacerbating the
problem.
Poor roof plumbing can result in large volumes of rainwater being
concentrated in a small area of soil:
Incorrect falls in roof guttering may result in overflows, as may
gutters blocked with leaves etc.
* Corroded guttering or downpipes can spill water to ground.
* Downpipes not positively connected to a proper stormwater
collection system will direct a concentration of water to soil that is
directly adjacent to footings, sometimes causing large-scale
problems such as erosion, saturation and migration of water under
the building.
Seriousness of Cracking
In general, most cracking found in masonry walls is a cosmetic
nuisance only and can be kept in repair or even ignored. The table
below is a reproduction of Table C1 of AS 2870.
AS 2870 also publishes figures relating to cracking in concrete floors,
however because wall cracking will usually reach the critical point
significantly earlier than cracking in slabs, this table is not
reproduced here,
| Prevention/Cure
Plumbing
Where building movement is caused by water service, roof plumbing,
sewer or stormwater failure, the remedy is to repair the problem.
It is prudent, however, to consider also rerouting pipes away from
the building where possible, and relocating taps to positions where
any leakage will not direct water to the building vicinity. Even where
gully traps are present, there is sometimes sufficient spill to create
erosion or saturation, particularly in modern installations using
smaller diameter PVC fixtures. Indeed, some gully traps are not
situated directly under the taps that are installed to charge them,
with the result that water from the tap may enter the backfilled
trench that houses the sewer piping. If the trench has been poorly
backfilled, the water will either pond or flow along the bottom of
the trench. As these trenches usually run alongside the footings and
can be at a similar depth, it is not hard to see how any water that is
thus directed into a trench can easily affect the foundation's ability to
support footings or even gain entry to the subfloor area.
Ground drainage
In all soils there is the capacity for water to travel on the surface and
below it. Surface water flows can be established by inspection during
and after heavy or prolonged rain. If necessary, a grated drain system
connected to the stormwater collection system is usually an easy
solution.
It is, however, sometimes necessary when attempting to prevent
water migration that testing be carried out to establish watertable
height and subsoil water flows. This subject is referred to in BTF 19
and may properly be regarded as an area for an expert consultant.
Protection of the building perimeter
Ic is essential to remember that the soil that affects footings extends
well beyond the actual building line. Watering of garden plants,
shrubs and trees causes some of the most serious water problems.
For this reason, particularly where problems exist or are likely to
occur, it is recommended that an apron of paving be installed
around as much of the building perimeter as necessary. This paving
CLASSIFICATION OF DAMAGE WITH REFERENCE TO WALLS
Description of typical damage and required repair Approximate crack width Damage
limit (see Note 3) category
Hairline cracks <0.1 mm 0
Fine cracks which do not need repair <1 mm 1
Cracks noticeable but easily filled. Doors and windows stick slightly <5 mm 2
Cracks can be repaired and possibly a small amount of wall will need 5-15 mm (or a number of cracks 3;
to be replaced. Doors and windows stick. Service pipes can fracture. 3 mm or more in one group)
‘Weathertightness often impaired
Extensive repair work involving breaking-out and replacing sections of walls, 15-25 mm but also depend 4
especially over doors and windows. Window and door frames distort. Walls lean on number of cracks
or bulge noticeably, some loss of bearing in beams. Service pipes disrupted
Page 8
bee Ta Shrubs Clump of trees; height selected for distance from house eS -f a arnt Aon erat TTT ee Patio. UHL — | Drained Carport pathway Path——@ Garden bed ‘ as covered with Driveway|""— muich Preset ania AS Oost LU me armed oe area should extend outwards a minimum of 900 mm (more in highly reactive soil) and should have a minimum fall away from the building of 1:60. The finished paving should be no less than 100 mm below brick vent bases. It is prudent to relocate drainage pipes away from this paving, if possible, to avoid complications from future leakage. If this is not practical, earthenware pipes should be replaced by PVC and backfilling should be of the same soil type as the surrounding soil and compacted to the same density. Except in areas where freezing of water is an issue, it is wise to remove taps in the building area and relocate them well away from the building — preferably not uphill from it (see BTF 19). It may be desirable to install a grated drain at the outside edge of the paving on the uphill side of the building. If subsoil drainage is needed this can be installed under the surface drain. Condensation In buildings with a subfloor void such as where bearers and joists support flooring, insufficient ventilation creates ideal conditions for condensation, particularly where there is little clearance between the floor and the ground. Condensation adds to the moisture already present in the subfloor and significantly slows the process of drying out. Installation of an adequate subfloor ventilation system, either natural or mechanical, is desirable. Warning: Although this Building Technology File deals with cracking in buildings, it should be said that subfloor moisture can result in the development of other problems, notably: + Water that is transmitted into masonry, metal or timber building elements causes damage and/or decay to those elements. High subfloor humidity and moisture content create an ideal environment for various pests, including termites and spiders. * Where high moisture levels are wransmitted to the flooring and walls, an increase in the dust mite count can ensue within the living areas. Dust mites, as well as dampness in general, can be 2 health hazard to inhabitants, particularly those who are abnormally susceptible to respiratory ailments. The garden The ideal vegetation layout is to have lawn or plants that require only light watering immediately adjacent to the drainage or paving edge, then more demanding plants, shrubs and trees spread out in that order. Overwatering due to misuse of automatic watering systems is a common cause of saturation and water migration under footings. If ir is necessary to use these systems, it is important to remove garden beds to a completely safe distance from buildings. Existing trees Where a tree is causing a problem of soil drying or there is the existence or threat of upheaval of footings, if the offending roots are subsidiary and their removal will not significantly damage the tree, they should be severed and a concrete or metal barrier placed vertically in the soil to prevent future root growth in the direction of the building. If it is not possible to remove the relevant roots without damage to the tree, an application to remove the tree should be made to the local authority. A prudent plan is to wansplant likely offenders before they become a problem. Information on trees, plants and shrubs State departments overseeing agriculture can give information regarding root patterns, volume of water needed and safe distance from buildings of most species. Botanic gardens are also sources of information, For information on plant roots and drains, see Building Technology File 17. Excavation Excavation around footings must be properly engineered. Soil supporting footings can only be safely excavated at an angle that allows the soil under the footing to remain stable. This angle is called the angle of repose (or friction) and varies significantly between soil types and conditions. Removal of soil within the angle of repose will cause subsidence. _Remediation Where erosion has occurred that has washed away soil adjacent to footings, soil of the same classification should be introduced and compacted to the same density. Where footings have been undermined, augmentation or other specialist work may be required. Remediation of footings and foundations is generally the realm of a specialist consultant. Where isolated footings rise and fall because of swell/shrink effect, the homeowner may be tempted to alleviate floor bounce by filling the gap that has appeared between the bearer and the pier with blocking. The danger here is that when the next swell segment of the cycle occurs, the extra blocking will push the floor up into an accentuated dome and may also cause local shear failure in the soil. IFit is necessary to use blocking, it should be by a pair of fine wedges and monitoring should be carried out fortnightly. This BTF was prepared by John Lewer FAIB, MIAMA, Partner, Construction Diagnosis. The information in this and other issues in the series was derived from various sources and was believed to be correct when published. The information is advisory. It is provided in good faith and not claimed to be an exhaustive treatment of the relevant subject. Further professional advice needs to be obtained before taking any action based on the information provided. Distributed by CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia Freecall 1800 645 051 Tel (03) 9662 7666 Fax (03] 9662 7555 www.publish.csiro.au Email: [email protected] © CSIRO 2003. Unauthorised copying of this Building Technology file is prohibited
Page 9
SITE PHOTOGRAPHS
Page 10
Lindsay Consulting Pty Ltd
Off. 2C/82 Parker Street, Maroochydore
NO. 5 SEAMIST COURT,
CLIENT POOLS BY DESIGN SITE LOCATION
SUNSHINE BEACH
REFERENCE 231061
BORELOG 1 BORELOG 2 PENETROMETERS
Depth Depth
below below
Group Group
ground Soil Description ground Soil Description PN1 PN2 PN3 PN4 PN5
Symbol Symbol
level level
(mm) (mm)
0 SC Clayey SAND, fine to medium, dark grey, 0 SC Clayey SAND, fine to medium, dark grey,
high plasticity fines, moist, soft (HIGH high plasticity fines, moist, soft (HIGH
100 ORGANIC CONTENT-PEAT) 100 ORGANIC CONTENT-PEAT) 0.25 0.25
200 200 0.25 0.25
300 300 0.25 0.25
400 400 0.25 0.25
500 500 0.3 0.3
600 600 0.3 0.3
Silty SAND, fine to medium, pale grey,
700 SM low plasticity fines, moist, loose 700 Silty SAND, fine to medium, pale grey, 0.3 0.3
800 800 SM low plasticity fines, moist, loose 0.5 0.5
WATERTABLE WATERTABLE
900 SM Silty SAND, fine to medium, pale grey, 900 SM Silty SAND, fine to medium, pale grey, 0.5 0.5
low plasticity fines, saturated, loose low plasticity fines, saturated, loose
1000 1000 1 1
Hole Terminated – Collapsing
1100 Hole Terminated – Collapsing 1100 1 2
1200 1200 3 1
1300 1300 4 3
1400 1400 5 6
1500 1500 6 5
COMMENTS
AUTHORISED SIGNATORY
Page 11
Lindsay Consulting Pty Ltd
Off. 2C/82 Parker Street, Maroochydore
NO. 5 SEAMIST COURT,
CLIENT POOLS BY DESIGN SITE LOCATION
SUNSHINE BEACH
REFERENCE 231061
BORELOG 1 BORELOG 2 PENETROMETERS
Depth Depth
below below
Group Group
ground Soil Description ground Soil Description PN1 PN2 PN3 PN4 PN5
Symbol Symbol
level level
(mm) (mm)
0 SC Clayey SAND, fine to medium, dark grey, 0 SC Clayey SAND, fine to medium, dark grey,
high plasticity fines, moist, soft (HIGH high plasticity fines, moist, soft (HIGH
100 ORGANIC CONTENT-PEAT) 100 ORGANIC CONTENT-PEAT) 0.25 0.25
200 200 0.25 0.25
300 300 0.25 0.25
400 400 0.25 0.25
500 500 0.3 0.3
600 600 0.3 0.3
Silty SAND, fine to medium, pale grey,
700 SM low plasticity fines, moist, loose 700 Silty SAND, fine to medium, pale grey, 0.3 0.3
800 800 SM low plasticity fines, moist, loose 0.5 0.5
WATERTABLE WATERTABLE
900 SM Silty SAND, fine to medium, pale grey, 900 SM Silty SAND, fine to medium, pale grey, 0.5 0.5
low plasticity fines, saturated, loose low plasticity fines, saturated, loose
1000 1000 1 1
Hole Terminated – Collapsing
1100 Hole Terminated – Collapsing 1100 1 2
1200 1200 3 1
1300 1300 4 3
1400 1400 5 6
1500 1500 6 5
COMMENTS
AUTHORISED SIGNATORY
Page 12
LINDSAY CONSULTING ¢7;, fvjl Engineers) LTA ED 4928 OFF. 2C/82 PARKER TREET, MAROQGAYDORE PH 5h 792 118 CLIENT AND PROJECT DESCRIPTION POOLS BY DESIGN PROPOSED POOL NO.5 SEAMIST COURT SCALES REVISION LIST. SUNSHINE BEACH SURVEY DATUM THIS DRAWING REMAINS HE PROPERTY OF LINDSAY CONSULTING PTY LTD AND IS FOR THE SOLE USE OF THE CLIENT. NO PART MAY BE USED IN PART OR WHOLE WITHOUT PRIOR EXPRESS WRITTEN CONSENT OF LINDSAY CONSULTING PTY LTD DRAWING TITLE SITE PLAN ASSOCIATED CONSULTANTS ‘A [ORIGINAL ISSUE m//23 [Computer Fite 231061SP.DWG DRAWING NUMBER SHEET] REV. 23-1061-S1 T/A Ma, 4oomm Coping —— 2nd Storey house Steel columns \ Existing home ist Floor HOUSE STORMWATER OVERFLOW GRAVEL PIT | -4 wos Easement with 9 5 : ° Oo 4 a = a Ww 2 ° oc 4.00 m