TIA - Application decision - s62A (PA) - Approval_1
Attached to the e-mail RAL25/0016 - SARA Referral agency response – with conditions.
No. Conditions of Approval Condition Timing
drawing number 2025030-DET-001, revision 01.
2 (a) Road access works must be provided at the permitted shared (a) & (b) Prior to submitting
road access location identified in Condition 1 comprising: the Plan of Survey to the
a rural residential driveway with a 6m wide throat and sealed local government for
between the pavement edge and property boundary. approval and to be
maintained at all times.
(b) The road access works must be designed and constructed in
accordance with Department of Transport and Main Roads:
Rural Property Access, Standard Drawing SD1807 Type A,
Issue B with a 450 mm diameter pipe for drainage and
include sloping headwalls at both sides;
Road Landscape Manual; and
Road Planning and Design Manual, 2nd edition.
3 (a) The applicant must register reciprocal access easements on (a)
the titles of proposed lots 41 & 42 for the shared access. At the time of survey plan
registration.
(b) The applicant must provide to
[email protected] of the Department of (b)
Transport and Main Roads a copy of Registration Confirmation Within 20 business days of
Statement/s and easement registration dealing number/s as registration of the
evidence of the registration of the easement/s referred to in part easements.
(a) of this condition.
4 Direct access is prohibited between Boreen Point – Teewantin At all times.
Road and Lot 4 RP136445 at any other location other than the
Permitted Road Access Location described in Condition 1.
Reasons for the decision
The reasons for this decision are as follows:
a) Vehicular access must not compromise safety of the users of the state-controlled road
network.
b) The safety of users of the state-controlled road network is the primary consideration for all
works in a state-controlled road corridor.
Please refer to Attachment A for the findings on material questions of fact and the evidence or
other material on which those findings were based.
Information about the Decision required to be given under section 67(2) of TIA
1. There is no guarantee of the continuation of road access arrangements, as this depends on
future traffic safety and efficiency circumstances.
Page 2 of 14