Decision Notice - Approved by Delegation of Authority - DBW25 0105 & RAP25 0040 (As Published)
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
SD02 B Site Plan prepared by SEQ Patio Group 04/06/2025
Annotated by Council
Geotechnical Stability
4. All works must be carried out in accordance with a Geotechnical Report for the site prepared
by a qualified person*. Certification must be submitted to Council from a qualified person*
which certifies that the site is not at risk from landslide emanating from the site or from other
land.
*(Refer to Advisory Note)
Stormwater Drainage
5. Stormwater runoff from the development must be discharged to Cooroy Belli Creek Road or
disposed of on-site without causing scour or damage to the subject site or any adjoining
property.
Damage to Services and Assets
6. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Not applicable.
6. REFERRAL AGENCIES MATTERS
The Assessment Manager would have been a referral agency pursuant to Planning Regulation
2017, Schedule 9, Part 3, Division 2, Table 3 – Design and Siting for part of the application (building
work assessable against the building assessment provisions) and so has the functions and powers
of a referral agency for that part.
The Assessment Manager exercising its functions and powers (Dwelling house in setbacks) it
would have had as a Referral Agency requires any Development Permit for Building Works in
relation to that building work to be subject to conditions 1-3, and 5-6 from this approval
(DBW25/0105).
7. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Qualified Person
1. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
Page 2 of 4
Document Set ID: 24192902
Version: 3, Version Date: 01/10/2025