SUPERSEDED - Minor Change Existing Approval MCU22 0133 01
Officer: Andrew Gaffney
Direct Telephone: 07 53296284
Our Reference: MCU22/0133.01
Your Reference: STP3977
27 May 2024
KFQ Clucas & BE Smidt
C/- Steffan Harries
PO Box 6258
FAIRFIELD QLD 4103
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 16 February 2024, requesting a minor change to an existing
development approval. Council decided on 23 May 2024, your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: MCU22/0133.01
Street address: 8 Hinterland Cl Tinbeerwah Qld 4563
Real property description: Lot 8 RP 162815
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 11 November 2022.
• Development Permit for Material Change of Use of Premises – Dwelling House
In relation to the request to make a minor change to the existing approval, Council on 23 May
2024, decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Amend conditions 2, 6, 8, 13 and 14
C. Include new condition 17.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 6
Document Set ID: 23033199
Version: 2, Version Date: 27/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
- - Tree Removal Comparison - prepared by The 15.03.2024
Outside Perspective
TP001 B DEMO + PROPOSED SITE PLAN - prepared by The 28.03.24
Outside Perspective
TP002 B PROPOSED FLOOR PLAN - prepared by The 28.03.24
Outside Perspective
As annotated by Council
TP003 B PROPOSED ROOF PLAN - prepared by The 28.03.24
Outside Perspective
TP004 B ELEVATIONS 1 OF 2 PLAN - prepared by The 28.03.24
Outside Perspective
Currency Period
3. This development approval lapses if the use has not happened by 11 November 2028,
unless an application to extend the currency period is approved by Council.
Building Height
4. The maximum height of the development must not exceed 8 meters above ground level in
accordance with the approved plans.
5. Certification must be submitted to Council from a Licensed Surveyor which certifies that the
building does not exceed the maximum height requirement of this Decision Notice.
Vegetation Clearing
6. This approval allows for the clearing of vegetation limited to those trees identified (in red
dashed and yellow lines) within the approved Tree Removal Comparison. No further clearing
is permitted.
Performance Bond
7. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Page 2 of 6
Document Set ID: 23033199
Version: 2, Version Date: 27/05/2024
Page 3
Site Access and Driveways
8. A sealed access driveway must be provided from the formation in Hinterland Close to all
parking and manoeuvring areas of the development. The access driveway must be generally
in accordance with Council’s standard drawing RS-056 (including any associated addendum)
and The Outside Perspective’s Proposed Floor Plan (TP.002, Rev. B) dated 28 March 2024.
Stormwater Drainage
9. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Easements
10. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
11. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
12. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
13. All works must be carried out in accordance with the recommendations contained in Report
on Geotechnical Investigation Project Number 220673, Report 01 Revision A prepared by
ARCOS dated 18 March 2024.
14. At the completion of the works certification must be submitted to Council from a qualified
person* which certifies that the development has been constructed in accordance with the
recommendations contained in Report on Geotechnical Investigation Project Number
220673, Report 01 Revision A prepared by ARCOS dated 18 March 2024.
Earthworks and Retaining Walls
15. All earthworks and associated retaining structures/batters must be contained entirely within
the subject site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
16. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Food Preparation area
17 The dwelling house is to contain only one food preparation area. The gas cooktop shown
within the ‘LIVING’ room within the western building is not approved.
5. REFERRAL AGENCIES
Not applicable.
Page 3 of 6
Document Set ID: 23033199
Version: 2, Version Date: 27/05/2024
Page 4
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Qualified Person
2. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
Infrastructure Charges
3. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work.
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
Page 4 of 6
Document Set ID: 23033199
Version: 2, Version Date: 27/05/2024
Page 5
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Andrew Gaffney
Senior Development Planner
Enc: Appeal Rights
Approved Plans/Documents
cc. Unitywater
DECISION NOTICE HISTORY
• Original Decision Notice – 11 November 2022.
• Decision Notice - Minor MCU22/0133.01 – 23 May 2024, with an
amendment to conditions 2, 6, 8, 13 and 14, and additional
conditions 17
Page 5 of 6
Document Set ID: 23033199
Version: 2, Version Date: 27/05/2024
Page 6
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 6 of 6
Document Set ID: 23033199
Version: 2, Version Date: 27/05/2024