Council archive · source document
Martoo Planning Statement · MCU18/0013
Attached to the e-mail Detached House - MCU18/0013.
Subject site
Figure 1 – Site location
Vehicular access to the site is from Arakoon Crescent which is of a split level configuration. The site is
serviced by all essential urban infrastructure including reticulated water supply, sewerage, underground
telecommunications and overhead electricity cables, stormwater drainage and a bitumen roadway.
The general character of the area is that of residential dwellings of differing building styles with several
dwellings having garages located within the Arakoon front boundary setback. The site enjoys direct views
to Sunshine Beach.
Figure 2 – Site and existing slope
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Martoo Planning Statement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 951 KB (small file)
- File type
No other editions are linked here.