Skip to the record
Accept no imitations.

Original source · versioned page text

MCU14/0106 & OPW15/0001 Appendix E - Stormwater Management Plan

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (26.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Civic
Stormwater Management Plan



    - Utilizing the fauna passage 1/2400x1200 RCBC as a discharge point for events above a 5 year ARI.
      Culvert at 3.82mAHD with controlling weir at 4.2mAHD in front of the fauna crossing.
With reference to Section 3, it is intended to place a bioretention system within the car parks as well. In
accordance with common practice, for the analysis it was assumed that the extended detention zone of the
bioretention system was full at the commencement of each rainfall event, although this is unlikely to occur in
this particular situation in practice.
Table 2-5         C1 Carpark Area Stage-Storage Relationship

 Stage (mAHD)                   Storage (m3)
           8.03                      0
           8.05                     6.18
           8.10                    26.01
           8.15                    90.67
           8.20                   215.32
           8.25                   387.38
           8.30                   596.47


Table 2-6         C2 Carpark Area Stage-Storage Relationship

     Stage (mAHD)                Storage (m3)
            7.98                         0
            8.05                     0.39
            8.10                     2.24
            8.15                     6.95
            8.20                    16.17
            8.25                    37.57
            8.30                    76.14
            8.35                    133.89


Table 2-7         C3 Carpark Area Stage-Storage Relationship

     Stage (mAHD)                Storage (m3)
            8.39                         0
            8.44                     2.56


Table 2-8         C4 Carpark Area Stage-Storage Relationship

     Stage (mAHD)                Storage (m3)
            7.96                         0
            8.05                     1.97
            8.10                     7.56
            8.15                    17.95
            8.20                    35.98
            8.25                    72.42




QIC Noosa Civic Pty Ltd                             Version Final                                  11 May 2015
J13041R2_Final SWMP.docx                        Commercial in Confidence                                Page 5
Log in to download the original file

MCU14_0106 & OPW15_0001 Appendix E - Stormwater Management Plan.pdf · 26.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.