MCU14/0106 & OPW15/0001 Appendix E - Stormwater Management Plan
The original of this document is very large (26.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNoosa Civic
Stormwater Management Plan
Table 3-3 Full Site MUSIC Catchment Parameters
MUSIC Node Description Area Land Use Total
(ha) Impervious
(%)
Car Park and Road All car park areas and new 2.044 Commercial 75%
roads
Green Areas All landscape areas 0.956 5%
Roof All roof areas 3.466 100%
Walkways and Hardstand All walking paths and 0.556 80%
general public areas
Table 3-4 MUSIC Catchment Areas
MUSIC Green Areas (ha) Car Park and Road (ha) Roof (ha) Walkways
Catchment and
Hardstand
(ha)
C1 0.192 0.573 0 0.017
C2 0.054 0.168 0 0.029
C3 0.113 0.222 0 0.014
C4 0.078 0.149 0 0.012
C5 0.100 0.193 0 0
F2 0.028 0 0 0.257
G1 0 0.087 0 0
G4a 0.310 0.223 0 0.228
G4b 0.035 0.154 0 0
H 0.045 0.275 0 0
I1 0 0 2.022 0
J1 0 0 1.444 0
For this scenario, stormwater quality treatment will be provided by multiple bio-retention basins located in
surface car parks, the southern area of the site and in the southern round-about. The drainage corridor
present in the OS7 corridor has also been utilized for its natural treatment properties. The common adopted
bio-retention parameters are listed in Table 3-5.
Table 3-5 Common Basin Details
Design Parameters Southern Basin and Carpark Basins
Roundabout
Filter Depth (m) 0.4 0.4
Extended Detention Depth (m) 0.3 0.2
Saturated hydraulic conductivity (mm/hr) 200 200
TN content of filter media (mg/kg) 400 400
Orthophosphate content of filter media (mg/kg) 50 50
QIC Noosa Civic Pty Ltd Version Final 11 May 2015
J13041R2_Final SWMP.docx Commercial in Confidence Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.