MCU14/0106 & OPW15/0001 Appendix E - Stormwater Management Plan

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (26.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 14, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Civic
Stormwater Management Plan



Table 3-3        Full Site MUSIC Catchment Parameters

         MUSIC Node                       Description                      Area           Land Use               Total
                                                                           (ha)                                Impervious
                                                                                                                  (%)
     Car Park and Road           All car park areas and new                2.044          Commercial              75%
                                            roads
         Green Areas                  All landscape areas                  0.956                                  5%
                Roof                     All roof areas                    3.466                                 100%
 Walkways and Hardstand               All walking paths and                0.556                                  80%
                                      general public areas


Table 3-4        MUSIC Catchment Areas

      MUSIC                Green Areas (ha)        Car Park and Road (ha)          Roof (ha)         Walkways
     Catchment                                                                                          and
                                                                                                     Hardstand
                                                                                                        (ha)
           C1                   0.192                         0.573                   0                0.017
           C2                   0.054                         0.168                   0                0.029
           C3                   0.113                         0.222                   0                0.014
           C4                   0.078                         0.149                   0                0.012
           C5                   0.100                         0.193                   0                 0
           F2                   0.028                          0                      0                0.257
           G1                     0                           0.087                   0                 0
          G4a                   0.310                         0.223                   0                0.228
          G4b                   0.035                         0.154                   0                 0
            H                   0.045                         0.275                   0                 0
           I1                     0                            0                    2.022               0
           J1                     0                            0                    1.444               0


For this scenario, stormwater quality treatment will be provided by multiple bio-retention basins located in
surface car parks, the southern area of the site and in the southern round-about. The drainage corridor
present in the OS7 corridor has also been utilized for its natural treatment properties. The common adopted
bio-retention parameters are listed in Table 3-5.
Table 3-5        Common Basin Details

 Design Parameters                                        Southern Basin and       Carpark Basins
                                                             Roundabout
 Filter Depth (m)                                                  0.4                    0.4
 Extended Detention Depth (m)                                      0.3                    0.2
 Saturated hydraulic conductivity (mm/hr)                          200                    200
 TN content of filter media (mg/kg)                                400                    400
 Orthophosphate content of filter media (mg/kg)                       50                   50




QIC Noosa Civic Pty Ltd                                 Version Final                                           11 May 2015
J13041R2_Final SWMP.docx                            Commercial in Confidence                                         Page 9
Log in to download the original file

MCU14_0106 & OPW15_0001 Appendix E - Stormwater Management Plan.pdf · 26.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.