MCU14/0106 & OPW15/0001 Appendix E - Stormwater Management Plan

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (26.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
   NOOSA CIVIC


                                                               Flow Comparison
  ARI                                                                Node H vs Node C
(Years)      Existing Case EX04       Unmitigated Case DE10         Mitigated Case DE17         Impact         Impact        Impact        Impact
          Flow (m3/s)     Critical   Flow (m3/s)    Critical     Flow (m3/s)      Critical    (Existing v    (Existing v   (Existing v   (Existing v
                         Duration                  Duration                      Duration    Unmitigated)   Unmitigated)   Mitigated)    Mitigated)
                           (min)                     (min)                         (min)        (m3/s)           (%)         (m3/s)          (%)
  2           0.3         60 min         0.5        25 min           0.5          25 min          0.2           67%            0.2          67%
  5           0.5         25 min         0.8        60 min           0.8          60 min          0.3           60%            0.3          60%
 10           0.6         60 min         0.9        90 min           0.9          90 min          0.3           50%            0.3          50%
 20           0.7         60 min         1.1        90 min           1.1          90 min          0.4           57%            0.4          57%
 50           0.8         60 min         1.3        60 min           1.3          60 min          0.5           63%            0.5          63%
 100          0.9         60 min         1.5        90 min           1.5          60 min          0.6           67%            0.6          67%

                                                               Flow Comparison
  ARI                                                                   Node G4b vs B
(Years)      Existing Case EX04       Unmitigated Case DE10         Mitigated Case DE17         Impact         Impact        Impact        Impact
          Flow (m3/s)     Critical   Flow (m3/s)    Critical     Flow (m3/s)      Critical    (Existing v    (Existing v   (Existing v   (Existing v
                         Duration                  Duration                      Duration    Unmitigated)   Unmitigated)   Mitigated)    Mitigated)
                           (min)                     (min)                         (min)        (m3/s)           (%)         (m3/s)          (%)
  2           0.3         120min         0.0        60 min           0.0          60 min         -0.3          -100%          -0.3         -100%
  5           0.5        120 min         0.1        60 min           0.1          60 min         -0.4           -80%          -0.4          -80%
 10           0.6         90 min         0.1        60 min           0.1          60 min         -0.5           -83%          -0.5          -83%
 20           0.7         90 min         0.1        25 min           0.1          25 min         -0.6           -86%          -0.6          -86%
 50           0.9         90 min         0.1        60 min           0.1          60 min         -0.8           -89%          -0.8          -89%
 100          1.0         90 min         0.1        60 min           0.1          60 min         -0.9           -90%          -0.9          -90%

                                                               Flow Comparison
  ARI                                                             Nodes G4b & H vs B & C
(Years)      Existing Case EX04       Unmitigated Case DE10         Mitigated Case DE17       Impact           Impact        Impact        Impact
          Flow (m3/s)     Critical   Flow (m3/s)    Critical     Flow (m3/s)      Critical  (Existing v      (Existing v   (Existing v   (Existing v
                         Duration                  Duration                      Duration  Unmitigated)     Unmitigated)   Mitigated)    Mitigated)
                           (min)                     (min)                         (min)      (m3/s)             (%)         (m3/s)          (%)
  2           0.7            -           0.6            -            0.6              -        -0.1             -14%          -0.1          -14%
  5           1.0            -           0.8            -            0.8              -        -0.2             -20%          -0.2          -20%
 10           1.2            -           1.0            -            1.0              -        -0.2             -17%          -0.2          -17%
 20           1.4            -           1.2            -            1.2              -        -0.2             -14%          -0.2          -14%
 50           1.7            -           1.4            -            1.4              -        -0.3             -18%          -0.3          -18%
 100          1.9            -           1.6            -            1.6              -        -0.3             -16%          -0.3          -16%

                                                               Flow Comparison
  ARI                                                                    Node Culvert
(Years)      Existing Case EX04       Unmitigated Case DE10         Mitigated Case DE17         Impact         Impact        Impact        Impact
          Flow (m3/s)     Critical   Flow (m3/s)    Critical     Flow (m3/s)      Critical    (Existing v    (Existing v   (Existing v   (Existing v
                         Duration                  Duration                      Duration    Unmitigated)   Unmitigated)   Mitigated)    Mitigated)
                           (min)                     (min)                         (min)        (m3/s)           (%)         (m3/s)          (%)
  2           3.0         25 min         4.5        25 min           3.1          60 min          1.5           50%            0.1           3%
  5           3.9         25 min         6.2        25 min           3.7          60 min          2.3           59%           -0.2          -5%
 10           4.4         25 min         7.0        25 min           4.0          60 min          2.6           59%           -0.4          -9%
 20           5.1         25 min         8.0        25 min           4.8          60 min          2.9           57%           -0.3          -6%
 50           5.5         60 min         8.5        60 min           5.6          60 min          3.0           55%            0.1           2%
 100          6.3         60 min         9.3        60 min           6.4          60 min          3.0           48%            0.1           2%

                                                               Flow Comparison
  ARI                                                                     Node SINK
(Years)      Existing Case EX04       Unmitigated Case DE10         Mitigated Case DE17         Impact         Impact        Impact        Impact
          Flow (m3/s)     Critical   Flow (m3/s)    Critical     Flow (m3/s)      Critical    (Existing v    (Existing v   (Existing v   (Existing v
                         Duration                  Duration                      Duration    Unmitigated)   Unmitigated)   Mitigated)    Mitigated)
                           (min)                     (min)                         (min)        (m3/s)           (%)         (m3/s)          (%)
  2           3.7            -           5.1            -            3.7              -           1.4           38%            0.0            0%
  5           4.9            -           7.0            -            4.5              -           2.1           43%           -0.4           -8%
 10           5.6            -           8.0            -            5.0              -           2.4           43%           -0.6          -11%
 20           6.5            -           9.2            -            6.0              -           2.7           42%           -0.5           -8%
 50           7.2            -           9.9            -            7.0              -           2.7           38%           -0.2           -3%
 100          8.2            -          10.9            -            8.0              -           2.7           33%           -0.2           -2%




                                                               O:\J13041\XPSTORM\Results\Results.E04.DE08.DE17.xls\WBNM.Compare.Mit
                                                                                                                   8/05/2015,12:29 PM
Log in to download the original file

MCU14_0106 & OPW15_0001 Appendix E - Stormwater Management Plan.pdf · 26.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.