Original source · versioned page text
MCU14/0106 & OPW15/0001 Appendix E - Stormwater Management Plan
The original of this document is very large (26.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 57, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn DATE PLOTTED: 8 December 2014 3:50 PM BY : NICHOLA WALLACE
EROSION AND SEDIMENT MANAGEMENT STRATEGY
OBJECTIVE/TARGET COMPLY WITH THE EROSION AND SEDIMENT CONTROL PLAN AS SHOWN, TO CONTROL EROSION 4
Y
AND SEDIMENT FLOWS.
/
SP222982
ENSURE THAT ALL EROSION AND SEDIMENT CONTROL DEVICES ARE OPERATIONAL AT ALL TIMES. NORTH
IVE
Y
SITE FOREMAN TO IDENTIFY AND CHECK DIRECTION OF STORMWATER OVER LAND FLOWS AS
DR
MANAGEMENT STRATEGY
/
SHOWN ON PLAN. PROVIDE BARRIERS AND OTHER MEASURES SHOWN ON THE PLAN TO PREVENT
N
Y
STORMWATER FLOWS OVER EMBANKMENTS, AND SEDIMENTS INTO GULLY PITS.
AN
/
FM
TASKS/ACTIONS ERECT SEDIMENTATION BARRIERS AT PERIMETER OF CONSTRUCTION AREAS AS REQUIRED.
SB
Y
HO
///
///
/
Y
///
FREQUENCY/DEADLINE SITE FOREMAN TO MONITOR PERFORMANCE AFTER EVERY HEAVY RAINFALL.
SB
RESPONSIBLE PERSON/ SITE FOREMAN TO BE RESPONSIBLE FOR INSPECTIONS.
/
Y
///
ORGANISATION
REPORTING/REVIEW SITE WORKMEN TO ADVISE FOREMAN IF THEY NOTICE ANY CONTROLS NEEDING REPAIR. Y ///
CORRECTIVE ACTIONS SITE FOREMAN TO CONFIRM TO SUPERINTENDENT, EXTRA BARRIERS AS REQUIRED.
///
///
///
EROSION AND SEDIMENT CONTROL CONSTRUCTION SEQUENCE: ///
///
PHASE 1 - PRIOR TO EARTHWORKS:
1. CONSTRUCT ROAD ENTRY/EXIT AND SHAKER GRIDS. COVENANT J
SEDIMENT BASIN 1 SP182845
2. DIRECT CLEAN STORMWATER FLOW DIVERSIONS AROUND CONSTRUCTION AREAS.
3. CONSTRUCT SEDIMENT BASIN. ENSURE SAFETY FENCING TO SURROUND IF BATTERS STEEPER THAN
1 IN 4 ARE USED.
///
4. TEMPORARY STOCKPILE AREAS TO BE MARKED OUT. TOPSOIL TO BE TRANSPORTED IN DAMP
CONDITION TO RETAIN SOIL STRUCTURE. TOPSOIL STOCKPILES TO BE LOW FLAT LONG MOUNDS.
5. FORM AND LINE ALL DRAINAGE CHANNEL/SWALES.
///
6. CHECK DAMS TO BE LOCATED IN EXISTING SWALES, IF REQUIRED , TO CONTROL FLOW VELOCITIES.
///
///
///
7. SITE FENCING AND SECURITY GATES TO BE INSTALLED.
///
PHASE 2 - DURING EARTHWORKS:
///
///
///
///
1. ALL MEASURES FROM PHASE 1 ARE TO REMAIN IN PLACE.
///
2. STRIP TOPSOIL TO STOCKPILES, PROVIDE SEDIMENT FENCE TO PERIMETER. ///
///
///
3. CARRY OUT EARTHWORKS TO AREAS, IN A PHASED SEQUENCE.
4. RESPREAD TOPSOIL FOLLOWING EARTHWORKS PHASED SEQUENCE, LEAVING IN A SEDIMENT BASIN 2 ///
ROUGHENED STATE. TOPSOIL TO BE TRANSPORTED IN DAMP CONDITIONS TO RETAIN SOIL
/
///
///
STRUCTURE. SEED/MULCH/HYDROMULCH/TURF AND WATER PHASED AREAS IMMEDIATELY /
/// ///
ON COMPLETION. /
5. PLACE ADDITIONAL SEDIMENT FENCE AND CONSTRUCT CUTOFF DRAINS AS EARTHWORKS
///
/ /
PROGRESS. Y /
/
6. AS ROADS ARE FORMED, SANDBAG WEIRS TO BE PLACED TO SLOW RUNOFF.
7. FINAL LOCATION OF SEDIMENT FENCES/CUTOFF AND SAND BAG WEIRS TO BE CONFIRMED TEMPORARY CLEAN Y /
/
Y Y
ON SITE WITH SUPERINTENDENT. WATER DIVERSION
Y
SB
/
EXIT
Y
EXIT
/
Y
SB
/
///
///
SITE OFFICE
Y
///
/
///
/
///
/
LEGEND:
/
///
3
/
EXIT CONSTRUCTION ENTRY/EXIT SP182845
/
SB SEDIMENT BARRIER OR GEOSOCK
3 TEMPORARY CLEAN
DIRECTION OF MINOR FLOW SP246584
CAD File: T:\J13041 Noosa Civic\Design\ACAD\Concept\J13041-CI-C05 EROSION AND SEDIMENT CONTROL.dwg
WATER DIVERSION
/
W
AL
> > CLEAN WATER DIVERSION
TE
///
DIRTY WATER COLLECTION R
HA ///
///
/ / SEDIMENT FENCE Y
///
///
DR
///
Y
///
IV
///
SEDIMENT BASIN
E ///
Y Y
ROCK FILTER DAM
///
Y
///
FINISHED CONTOURS Y
///
Y Y
Y Y
Y
XREF's: X-TITLE BORDER; X-J13041-SURVEY; X-J13041-CONCEPT
///
/// ///
COVENANT J SP182845
/// /// /// ///
EARTHWORKS LIMIT PLAN 10 0 10 20 30 40 50m
SCALE A1 - 1 : 1000
A3 - 1 : 2000 Scale 1:1000
Drawn Date Client
AMENDMENTS ALONG HOFMANN DRIVE
14/10/2014 QIC NOOSA CIVIC PTY LTD
Cardno Limited All Rights Reserved. Checked Date Project Status
NOOSA CIVIC EXPANSION
This document is produced by Cardno Limited solely for the
N.J.W
Designed
P.M
Date
FOR APPROVAL
benefit of and use by the client in accordance with the NOOSAVILLE NOT TO BE USED FOR CONSTRUCTION PURPOSES
N.J.W. .
Verified Date CONCEPT DATUM Orig. Date Scale Size
assume any responsibility or liability whatsoever to any third Cardno (Qld) Pty Ltd | ABN 57 051 074 992
Level 1, 9 Maud Street
P.M. . Title
. A.H.D. NOV 2014 AS SHOWN A1
party arising out of any use or reliance by third party on the Approved RPEQ NO
Maroochydore, QLD 4558 Drawing Number Revision
content of this document. .
A 28/11/2014 DA LODGEMENT N.J.W P.M Tel: 07 5443 2555 Fax: 07 5443 5642
Rev. Date Description Des. Verif. Appd. Web: www.cardno.com.au SIG APPROVED
DATE
. PRELIMINARY EROSION AND SEDIMENT CONTROL PLAN J13041-CI-C05 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.