Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Revised Drawings SCG 31131-OPW-2022.061.01-Council RFI.pdf

of 4

Page text read automatically using OCR, there may be inaccuracies

                  Issue:




                                           Unit 1/11 Project Ave,
                                           Noosa Heads
                                           Ph (07) 5455 5604




                  DEBUILD T/A
                                           email:[email protected]
                                           web:www.scg-engineers.com
                                           ABN 40 098 481 899




                      Title:




                     Project




                     Date:       Drawn                Design

                      Checked:   Drg No.                        Rev.




Rev. - 10.06.16


[OCR of page images]
 

DRAWING SIZE — At

  
  
 
 
 
 

 

www.dialbeforeyoudig.com.au

SAY DIAL1100

yy BEFORE YOU DIG

 

  

 

 

EXISTING SIDE ENTRY PIT
PROVIDE FILTER SOCK

SURROUND DURING SITE
BULK EARTHWORKS.

 

  
   
       
   
       
 
 
  
    
 
 
 
 

SILT FENCES TO DIVERT FLOWS INTO
CONSTRUCTED DETENTION BASIN.
PROVIDE BUNDING AS SHOWN ALONG
NORTHERN BOUNDARY WITH BUND Ht
MIN 200mm HIGHER THAN BLOCKWALL
WEIR Ht (RL 11.30m), EXTEND BUND
ALONG BOUNDERY UNTIL HIGHER THAN
THE RL 11.70m CONTOUR.

x*

 
 
 
   

MAINTAIN EXISTING SITE TURFED AREA FOR A SILT
BUFFER. PROVIDE MAXIMUM POSSIBLE WIDTH. PROVIDE
BARK CHIP REPLACEMENT FOR ANY EXPOSED SOIL AREAS.
PROVIDE SILT FENCE ACROSS THE UPSTREAM EDGE OF
THE ZONE DURING THE CONSTRUCTION PHASE OF
BIO/DETENTION BED AND SILT/SEDIMENT BASIN

  
 
  

BLOCKWORK WALLS FOR DETENTION
ZONE AND BIO-RETENTION BED
CONSTRUCTED TO CREATE
SILT/SEDIMENT SETTLEMENT BED TO
SERVE SITE THROUGHOUT
CONSTRUCTION WORKS. PROVIDE GAPS
R| IN WALLS TO ALLOW SURFACE RUNOFF
INFLOWS INTO THE BED. REFER DRG
SW1.1/SW1.2 FOR DETAILS

CONSTRUCTED SEDIMENT
BED TO DETAIL MIN 80m2

PLAN SIZE, OUTFLOW TO /
EXISTING SITE DRAINAGE

GULLY PIT, REFER DRG /

QW2.2 FOR BED DETAILS //

 

 

HEIGHT DATUM

Lot 1 on RP130594 & Lots 80 &
81 on RP71151
Level Datum AHD I

 

 

 

  
 

EXISTING CONDITION SURVEY
A PHOTOGRAPHIC SURVEY OF THE EXISTING KERB &
CHANNEL AND FOOTPATHS FRONTING THE SITE IS TO
BE COMPLETED AND ISSUED TO COUNCIL PRIOR 10
THE PRE-START WORKS MEETING WITH COUNCIL.

 

 
  
 
 
 
 
  
   
    
      
   
  

 

80-120mm ROCK (NO FINES) | \ é
HARD STAND OVERLAY :
FOR“DELIVERY'S DURING
CONSTRUCTION. TYPICAL.

 

THE SILT FENCE ALONG THE NORTHERN
BOUNDARY TO BE COVERED WITH BUILDERS
PLASTIC TO DIVERT ALL FLOWS TOWARDS AND |
INTO THE INTO CONSTRUCTED DETENTION BASIN. \
FENCE TO BE MAINTAINED THROUGHOUT

i xX

 

Level Origin PSM115316, RL 3.593m CONSTRUCTION — _ — = (quune®S paste
Survey information provided by Noosa \x g a : «0
Cooloola Land Surveys Pty Ltd | } 2, =a = + tag | EXISTING Wat \
Drg No. 21215DET _ —— — Tie4/ GWE
P BOUNDARY, Hake \ | > | Swale 7
ot = — x over SUT FENCE) _ swe >
= PLA c a
- —— (puuDers \ cane > _— swat (c.-0) \

oO Field Inlet \
_— SWE \ “

  

\

SITE PLAN — SILT & SEDIMENT EROSION PLAN

 

LEGEND Scale 1: 200
Cannne——+>__ © 8 '0n1:200 @ AI
_--7-7 INDICATES EXISTING SURFACE CONTOURS — sw/EX INDICATES STORMWATER DRAIN EXISTING 1:400 @ A3
48077 AND LEVELS TO AHD. AS NOTED
SY
4480 EXISTING SURFACE SPOT LEVELS. wy INDICATES DIRECTION OF SURFACE FLOWS
————— INDICATES OVERHEAD ELECTRICITY — — — — sir SILT RETENTION FENCE TO DETAIL
SUPALY TINE INDICATES ALIGNMENT OF SWALE AND
— SWALE +>

INDICATES EXISTING SEWER LINE

w———— INDICATES WATER MAIN APPROX
ALIGNMENT, BUILDER TO CONFIRM EXACT
LOCATION PRIOR TO WORKS

a INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM EXACT
LOCATION PRIOR TO WORKS

BUNDING TO DETAIL

tl (.-0)

DIRECTION OF FLOW, REFER TYPICAL
SWALE DETAILS

INDICATES ALIGNMENT OF SOIL BUNDING
MOUNDS TO DETAIL. SITE FOREMAN TO
MAINTAIN BUNDS THROUGHOUT WORKS

INDICATES LOCATION OF COIR LOG CHECK
DAMS ACROSS DRAINAGE PATHS REFER
TYPICAL DETAIL

\
CREATE A VBHICLE PATH THROUGH .
THE SITE FOR SONSTRUCTION é
VEHICLES, COVER ‘N CRUSHED ROCK

OR ROAD BASE = SL. _- — ——

TEMPORARY SWALE CONSTRUCTED TO

 
 
        
          
   
   
       
         
 
 
 
 
  
   
        
     
     
      
       
   
   
   
   
   

xix—

; oe
95.916

71000

 

 

\ = \ % DIVERT SURFACE FLOWS PRIOR TO
2 \ 9% BUNDING CONSTRUCTION =
1 2 \ \ *
\ % oe \
\ PROVIDE RUMBLE GRATES \% + \
DURING DEMOLITION & \s \
\ SITE BULK EARTHWORKS. d \
\ ee ° \ Ke. $08 Manhole :
* \ a
sn \ . \ * 4
= —— \ \ Yn
G \ . \ + \ g
/ \ \ \ m
: \
/ \. “ . . |
+ \ \ A
. x \ .
PARKING AREA FOR \ . ooNS Sg
VISITORS AND WORKERS \ . we
\ & . \ Lot 1 ¢
SS * \ NC RPI 3054
—_ N\ > Ye
* SI
N \ ‘\ \ wy \ .
» \ . ‘ 2 f
4 S +
‘ \ SY 2 SA =
\ 3 \
\
\ . YN XN
N
y . +
wy s ~L — SIL —
SILT FENCING AROUND ‘ ° = — —_ |
é NN ~ poe
PARKING AREA . SS _ — SIL Oo ~

SEDIMENT BASIN DESIGN

The sediment basin has been designed using
the recommendations of IECA (International
Erosion Control Association). Refer to IECA
forBasin Management recommendations.
Basin type : D

RUSLE : 190 - 230 t/ha/yr

R (Y%, 5 day) : 54mm (R(85%))

Catchment : 0.4 ha

Cv: 0.60

Settlement Volume : 130m? (Depth: 750mm)
Storage Volume : 65m° (Depth : 375mm)
Basin Surface Area : 160m?

 

  

 

 

 

4+ \) 6
aPepISWALE > +

 

wail \
af eA.
we

4 q ss
Wok i

FOR DETAILS

BUNDING TO DIVERT FLOWS
INTO CONSTRUCTED

 

 

 

 

CONSTRUCTION BASIN

Ne A DETENTION BASIN.
{75910 25m
‘ eweh75,976 x
be )
SITE SILT & SEDIMENT MANAGEMENT — CONSTRUCTION PHASES
PHASE METHODOLOGY

DEMOLITION — Provide silt fencing around existing SW pit in N.E. Cnr of site
- Construct bunding along rear (eastern) boundaries as indicated on plan.
Cover bunds in builders plastic to prevent scour/silt runoff
— Maintain the existing turfed area shown on the plan and provide
additional silt fence upslope from the area.
— Install remaining silt fences as indicated on the plan.
— Rumble grates and no fines rock hardstand to be provided for all plant
and equipment exiting the site.
— Cover all stockpiled soil with builder plastic
— Maintain existing swale adhjacent northern boundary and install coir log
dams along its length

BIO/DETENTION/SILT | — Maintain all site measures implemented during the DEMOLITION phase.

— Fix and or improve any measures damaged or compromised during the
DEMOLITION phase or past storm event.

— Provide a clearly identified vehicle path through the site down to the
construction work-face. Provide crushed rock/road base as a temporary
pavement along these paths.

— Establish a clearly identified parking area within the site for workers and
visitors. This area should have crushed rock/road base surfacing and the
downslope areas surrounded by silt fencing.

SEDIMENT BASIN FOREBAY SLOTTED
150 DIAM PIPES AND WITH 225 DIAM
MANIFOLD PIPE DRINAING INTO

SEDIMENT BASIN, REFER DRG OW2.2

EXISTING SITE DRAINAGE GULLY PIT REMOVED
AND UPGRADED CONNECTION PIPE INSTALLED
AS PER DRG SW1.1 PROVIDE SILT BARRIER
SURROUNDS DURING CONSTRUCTION OF
DETENTION BASIN RETAINING WALLS. FULL
INFLOW CAPACITY TO BE MAINTAINED DURING
CONSTRUCTION WORKS

MAINTENANCE OF SILT PROTECTION

SITE FOREMAN TO MAINTAIN ALL SILT AND SEDIMENT
PROTECTION MEASURES THROUGHOUT THE DURATION OF
PROJECT. ANY BREACHING OF THE PROTECTION MEASURES
MUST BE REMEDIATED IMMEDIATELY AND REPORTED TO THE
ENGINEER FOR CORRECTION MEASURES. SILT RUNOFF
PROTECTION IS TO BE MAINTAINED UNTIL SUCH POINT THAT
LANDSCAPING IS COMPLETED AND NOT SUSCEPTABLE TO
STORMWATER SCOUR.

DUST MOBILISATION FROM WIND ACTION

SITE CONTROL TO INCLUDE PROTECTION AGAINST THE
CARRIAGE OF SOIL SEDIMENT FROM WIND ACTIONS. SITE
FOREMAN TO COVER ALL STOCKPILES WITH HESION OR
SIMILIAR, PROVIDE SILT FENCING AROUND BASE OF STOCKPILES

 

SITE DRAINAGE — CONSTRUCTION
CONSTRUCTED STORM WATER PITS WITHIN THE SITE

ARE TO BE COVERED UNTIL THE SITE IS COMPLETED
OR TO BE FITTED WITH SILT PROTECTION MEASURES
TO THE APPROVAL OF THE ENGINEER

 

 

BULK EARTHWORKS

— Maintain all site measures implemented during the previous construction
phase.

— Fix and or improve any measures damaged or compromised during the
previous phase or past storm event.

— Provide all detailed items within the constructed Bio/Detention basin
which will act as the a Silt Basin during the earthworks and subsequent
construction phases.

— Ensure all site surface runoff is channeled through the Silt Basin. No
runoff from the site must be allowed to drain into neighbouring properties.
— Maintain bunding where required

— The Silt Basin will require continual management/maintenance during the
remaining construction works. Refer Silt Basin detail.

— Approved flocculating agent should be used for any silt laden volumes
of detained runoff within the Silt Basin.

— Stripped Areas awaiting earthworks should be tilled or bucket raked in a
direction parallel to the surface contours to slow/impede surface runoff
and promote infiltration

— Completed earthworks areas should be treated with an approved soil
binder material.

 

BUILDING WORKS

— Maintain all site measures implemented during the previous construction
phase.

— Fix and or improve any measures damaged or compromised during the
previous phase or past storm event.

— The Silt Basin will require continual management/maintenance during the
remaining construction works. Refer Silt Basin detail.

— All constructed SW pits within the site must be covered until connected
to drains which discharge in the Silt Basin. At which point the pits should
still be covered with a Geofabric blanket.

— All installed gutters should be fitted with temporary down pipes which
drain directly into constructed SW pits.

 

BIO-RETENTION BED

 

 

— The silt capture measures shall be removed from the Silt Basin for
preparation of Bio—retention basin.

— The Bio-retention basin shall be constructed in accordance with the
details contained within these drawings.

 

 

These measures are provided with reference to IEAUST Soil and Sediment Erosion Engineering
Guidelines for Queensland Construction Sites and IEAC recomendations

 

 

 

 

 

 

 

B Basin details revised for Council RFI 01.06.22

A Revisions for Council RFI 19.05.22
Revision | Description Date
Iss

* FOR APPROVAL

 

DO NOT SCALE FROM THIS DRAWING

The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.

 

Unit 1/11 Project Ave,
Noosa Heads

Ph (07) 5455 5604
email:[email protected]

web:www.scg-engineers.com
ABN 40 098 481 299

C) S06

DEBUILD T/A

 

Title:

SITE SILT AND SEDIMENT
CONTROL

 

Project

89-93 Eumundi Noosa Rd,
NOOSAVILLE

 

Date: Drawn Design

 

 

 

April 22 SR SR
Checked: Drg No. Rev.

| 9.55 | 31131 -OW2.1) B.

 

 

 

 

 

 

Log in to download the original (Revised Drawings SCG 31131-OPW-2022.061.01-Council RFI.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.