Original source · versioned page text
Revised Drawings SCG 31131-OPW-2022.061.01-Council RFI.pdf
.26
15
WM
WM
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — At
www.dialbeforeyoudig.com.au ALL STORMWATE
SAY DIAL1100
BEFORE YOU DIG
HEIGHT DATUM
Lot 1 on RP130594 & Lots 80 &
81 on RP71151
Level Datum AHD
Level Origin PSM115316, RL 3.593m
Survey information provided by Noosa
Cooloola Land Surveys Pty Ltd
Drg No. 21215DET
BUILDER TO POT HOLE LOCATE AND
CONFIRM EXISTING SERVICES LOCATIONS
& LEVELS BEFORE ANY EARTHWORKS
ARE CARRIED OUT. REPORT ANY
DISCREPANCIES TO THIS FIRM.
BINS AREA.
PROVIDE DRAINAGE PIT FOR CONNECTION TO
R
PIPES TO BE LAID AT
1:100 MIN. UNO.
4/125x75x4.0 RHS (GALV.)
LAID AT 1 in 100 MIN. INSTALL TO
NEW KERB ADAPTORS IN
ACCORDANCE WITH COUNCIL STD
DETAIL RS—081 & MAKE
FOOTPATH GOOD. TYPICAL.
15kL ALL CAST PRE CAST IN-GROUND
TRAFFICABLE STORMWATER RETENTION TANK
RECEIVE ROOF RUNOFF (ONLY) FROM UNITS 1-3
& UNITS 17-20. PROVIDE PUMP OUT FOR
IRRIGATION PURPOSES & BIN WASH DOWN.
WARNING SIGNS AT TAPS 'NON POTABLE’.
REAR OF TOWNHOUSES UNITS SET AT EXISTING SURFACE
LEVEL WITH A FORMED STONE PITCHED SWALE TO ALLOW
FOR OVERLAND FLOW TOWARDS BIO-RETENTION /DETENTION
BASIN. PROVIDE UPSTAND TIMBER SLEEPER WALL ALONG
BOUNDARY TO RETAIN OVERLAND FLOWS WITHIN SITE
REFER SECTION B-B
REAR OF UNITS DRAINED VIA GRATED
FIELD INLETS AND INTERCONNECTING
DRAIN TO SITE DRAINAGE. REFER DRG
SW1.2 FOR TYPICAL DETAIL. SWALE
FORMATION FOR OVERLAND FLOWS
DIRECTED TO BIO/DETENTION BASIN
OVERFLOW WIER WALL AND
SCOUR PROTECTION ALONG
PROPERTY BOUNDARY. REFER
DRG SW1.2 FOR DETAILS
PROPOSED 60m2 BIO RETENTION
BED AND 200m3 DETENTION BASIN. (EXP—4)
FORMED WITH BLOCKWORK WALLS.
REFER DRG SW1.2 FOR DETAILS
SEWER MAIN. PROVIDE BUND SURROUND TO
DIVERT SW RUNOFF AWAY FROM AREA. REFER
TO HYDRAULIC CONSULTANTS DETAILS.
FRONT OF UNITS DRAINED VIA GRATED
FIELD INLETS AND INTERCONNECTING
SWALE DRAIN FORMATION FOR
OVERLAND FLOWS DIRECTED TO
DRIVEWAY
LEGEND
INDICATES EXISTING SURFACE CONTOURS
AND LEVELS TO AHD.
INDICATES DIRECTION OF FALL
TO FINISHED SURFACES.
INDICATES SURFACE LEVEL (S.L.) AND INVERT
LEVEL (|.L.) OF ADJACENT STORMWATER PIT
49077
GD-200
F,
Alls
Sw
S.L. 12.50
LLL. 12.00
JP1
XI
— R-SW
450Sq STORMWATER JUNCTION PIT, PRE—CAST
CONCRETE. HEAVY DUTY GRATE WHERE IN
DRIVEWAY
400Sq GRATED FIELD INLETS, PRE-CAST
CONCRETE & HEAVY DUTY GRATE WHERE IN
DRIVEWAY, POLY AND LIGHT DUTY GRATE WHER
IN LANDSCAPE AREAS, REFER DRG SW1.2 FOR
TYPICAL REAR OF TOWNHOUSE CONNECTION
DETAIL.
600Sq GRATED FIELD INLETS, PRE-CAST
CONCRETE. HEAVY DUTY GRATE WHERE IN
DRIVEWAY
crt
Ej 6r2
RW
600x900 GRATED FIELD INLETS, PRE-CAST
CONCRETE. HEAVY DUTY GRATE WHERE IN
DRIVEWAY
— SWALE +>
& GP3
y6r4
900Sq GRATED FIELD INLETS, PRE-CAST
CONCRETE. WITHIN BIO/DETENTION BED, REFER
DRG SWI.2 FOR ORIFICE AND RAISED GRATE
DETAILS
OVERLAND FLOW
Qhoo - Qio = 12 L/s
Qatow = 215 L/s
INDICATES DIRECTION OF RAMP UP OR
DOWN AS INDICATED
RAMP. ww
PROVIDE A SWITCH OVER VALVE TO MAINS WHEN LOT 79 STONE SCOUR LOT 101
TANK VOLUME IS BELOW 10%. OVERFLOW TO RP71151 ie» PROTECTION T
EUMUNDI NOOSA ROAD KERB + CHANNEL. . Ca is RP106085
SL 1550] | Ix Ix \ Lk a i@
LIL 14.85 1500 uPVC cei 1508-uPVC = gpy_ 1508 uPVC apy 1508 uPVC 7910'00" 95.916 _cp1 2250 uPVC gp ws 2258 uPVC, N pt. 2258 uPVC py Pt BLOCK R-WALL SL 1110] “4 e
px - —sSw— Spar — sar -S Waar =e SWF sa > — WS Seale 7 sl Swale = SiS sare gg S Wie nr Sg sar SW See gy wae 9 Wo Sear —— Si Eh anne ILL. 9.25 x x F
Pt t FAL &. SE — sue Sea
Pt rh ee | 7. __ [SE 150] J) betentron’ easin 2
Po p—-—-———————4—---—--—~-_4 LL. 10.20 (grassed beyond bi x
/ | | bed area fp
4 / Z Y LITTTTIT IZ. ] EXISTING INTER-ALLOTMENT DRAINAGE
Bf / WMI. WY OCOE Ls YA | Z CONNECTION POINT. EXISTING PIT REPLACED WITH
iy Z | = EW PIT & EXISTING 2259 BRANCH PIPE
/ TH104 | TH201 TH202 <TH203 TH204 : 2 we INCREASED TO 3008
/ . L / : CEE] = : s kz IN ACCORDANCE WITH STORMWATER
1 / Hit. Loe 1 ry FFL: 14.000 FFL: 15.400 FFL: 13.400 FFL: 12.600 | a bo) MANAGEMENT REPORT BY SCG CONSULTING
) HH] |i Fe = oT | - FPL: 13.850 FPL: 13.250 FPL: 13.250 Y FPL: 12.450 Oi ENGINEERS.
! rood TTT s . . Y ; L
APE a ie | I GC 4 STUBS FOR ROOF WATER = ==]
Ce rr Qiao = Qn = 34 L/s | | OVERLAND FLOW Ye 1 CONNECTION, REFER INTERNAL | BIO-BED 2258 COLLECTOR
t ut Lo AAA Re _ ,
er Qatow = 934 L/s as LLL, | | Qtoo — Qo = 64 L/s “7A HYDRAULICS CONSULTANT I PIPE SHOWN WITH 100¢
715.1. 16.000 b eee : x | | Qatow = 235 L/s if Le YO, |= + FOR DETAILS, TYPICAL. 4 SLOTTED BRANCH PIPE AT
J] \\-15.600 ? SBE AWN CS =] OE S ap S LI NM AR a y 1.0m CTRS INTERCONNECTING
| / FALL SL 15.750 / “o SL 148 S.L. 12.450
z 7 ay wL. 10. / FALL y -L. 14.860 ? f, Ut.
el _ FLOW MveRT HL 18.150 S FLOW INVERT 2250PVe.. 1. 13.900 a “Reg [IL 11.000 | fe HEAD WALL AND STONE
——~— sh 7 =.
§| FLOW INVERT | | _ sw i % | Ew: \ L 3000 uPVC =| IL: 11.020 SCOUR PROTECTION
Ss es eS re t 3 rower Sl RP106085
N Re) ys \ \S \ WF A 9 ~<
SS is ~~ = DSF \ OS ROH] SENe ~ PROVDE 25m WDE RAMP FOR
Noa tase] JF ILL. 12.200 “om
yosS le ~~ | Ir ! a oye Ls TY MAINTENANCE ACCESS INTO
A, GPt pat g
a \ Y GP1 gz Z, ‘ we & BIO/DETENTION BASIN
| TH401 a ww] 4 N. §
16.600 afro Ya A = 01 fo aw J
16-45 PA : ei “ FFL: 16.500 | L| ST] / ~ FFL: 15.000 | SLasé0 wa “ XN e PAVEMENT LEVELS AND BREAKS IN
: ! FPL:16.150 7“ i SN FPL: 14.850 | be? \ i KERBING TO ALLOW OVERLAND
| S - ahi ‘ELS | [EL 1220 I = Fi f FLOWS INTO DETENTION BASIN
% OVERLAND FLOW & [i L| OVERLAND FLOW 2 ey, 5 L/-—~—
oot Bz Qtoo - Qi = 19 L/s Oo | Quo = Qy = 15 L/s ON : SW/EX aM 53076 ‘SW/EX SW/EX sw/ex
i Qaow = 409 L/s | , 6.1m MIN) Qgtow = 215 L/s JA x
1H402 Hi Y | I es \ PROPOSED BLOCK
| | FFL:16.450 <1, FFL:15.000 «4 +2 LU x BOUNDARY WALL
| A FPL: 16.300 SL 14.800H4 “44° a) 2 se. & c
Ss 6.1m] MIN LU CP! h | IL 14.250 | EL 14.890 CPt | one
= te TN t |b J
ie L- EXISTING
| P2_ | 4 7) lL aH | K . INTER—ALLOTMENT
| j TH403 ew ! / cer 1} 99 \4 >
S.L. 16.250 GP1 \ TH303 ¥ Y DRAINAGE
eh a / FFL: 15.000 85 LOT 99 ¥
=: FPL: 16.300 Ve FPL: 14.850 «| Rl XN v \
= dN \2 Te, ! | \ RP106085 \
3| | | 1B | a \ \ ¥
=| | | a | ; \ \
| 4
| AL) | | . \ AX a
| ! FEL 16.450 ! TH304 Of x ALAN
2 VSL, “10. “4 Fal .
wit FPL: 16.300 FFL:15.000 | 2
4 im v J 6 * /
L— LI | SL. 16.400 77 AN J pe Bs 5 be
IL, 15.800 K& by J] fe x
RE oes a 1 a
— = O° 84.965 LL == -!- {E i
BP .
W x x _ x \ x
HATCHING INDICATES ROOF I | :
STORMWATER
TO BE DIRECTED TO
HARVESTING TANK.
200(W) GRATED DRAIN WITH HEAVY
DUTY GRATE.
INDICATES STORMWATER DRAIN PROPOSED
AS NOTED MIN 1 IN 100 FALL UNLESS
NOTED OTHERWISE
INDICATES ROOF STORMWATER DRAINAGE
LINE TO HYDRAULIC DESIGNERS DETAILS.
INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM EXACT
LOCATION PRIOR TO WORKS
INDICATES EXISTING SEWER LINE
INDICATES POSITION OF RETAINING WALL
REFER EARTHWORKS DETAILS
INDICATES ALIGNMENT OF SWALE AND
DIRECTION OF FLOW, REFER TYPICAL
SWALE DETAILS
INDICATES OVERLAND FLOW CAPACITY
ASSESSMENT OF DRIVEWAY (Qio9 Yr 2100
FLOWS) USING MANNINGS. Qig FLOWS
DRAINED VIA UNDER GROUND PIPING
FINISHED SURFACE LEVELS
ALONG SIDE BOUNDARY TO
FALL TOWARDS DRIVEWAY
REAR OF UNITS DRAINED VIA
GRATED FIELD INLETS AN
INTERCONNECTING DRAIN TO
SITE DRAINAGE TYP.
SITE PLAN — SITE STORMWATER DRAINAGE PLAN
Scale 1: 200
THIS PLAN TO BE READ IN CONJUNCTION WITH
SCG CONSULTING ENGINEERS STORMWATER
MANAGEMENT REPORT 31131(SWM)
ALL SERVICES SHOWN ON THIS PLAN INDICATIVE
ONLY CONTRACTOR TO LOCATE ALL SERVICES
PRIOR TO COMMENCING WORKS ON SITE. ALL
SERVICES ARE TO BE PROTECTED IN
ACCORDANCE WITH THE AUTHORITY
RESPONSIBLE FOR THE SERVICE
KE
EX. SWPT EXISTING STORMWATER PIT
RC. HW. — REINFORCED CONCRETE HEADWALL
EX. SMH — EXISTING SEWER MANHOLE
E.0.B. EXISTING EDGE OF BITUMEN
K&C EXISTING KERB & CHANNEL
N.S.L. NATURAL SURFACE LEVEL
FH. FIRE HYDRANT
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
ROOF DRAINAGE
ROOF DRAINAGE BY HYDRAULICS CONSULTANT,
ROOF DRAINAGE FOR THOI-THO3, TH-17, TH-18,
APT-19 & APT-20 10 BE DIRECTED TO THE
15kL STORAGE TANK AT THE FRONT OF THE SITE,
THE REMAINING ROOFS TOP BE CONNECTED TO
SW PITS WITHIN THE DRIVEWAY
ALL GRATED STORMWATER PITS WITHIN DIVEWAY
TO BE FITTED WITH OCEANAGUARD GPT INSERTS
Revisions for Council RFI
01.06.22
Revisions for Council RFI
19.05.22
OPERATIONAL WORKS ISSUE
05.04.22
THO6/07/08/09 REVISED
09.03.22
Dojo /m)7
BINS MOVED TO FRONT OF SITE
22.02.22
A
MAINTENANCE RAMP ADDED
11.02.22
Revision
Description
Date
Iss
* FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.
DEBUILD T/A
he
) sce
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 299
Title:
SITE STORMWATER
DRAINAGE PLAN
Project
89-93 Eumundi Noosa Rd,
NOOSAVILLE
Date: Apri 22 Drawn SR Design SR
0 2 4 6 8 10 1-200 @ AT . Checked: Drg No. Rev
Tu 8
1400643 | Smee |) [S1131-SW1.1 | F.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Revised Drawings SCG 31131-OPW-2022.061.01-Council RFI.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.