Original source · versioned page text
Development Assessment Report
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
Project Urban – 15228 June 2016
(2) by demonstrating it complies with the SPP
code: Water quality (Appendix 3).
NATURAL HAZARDS STATE INTEREST
Assessment Criteria Comment
(1) avoids natural hazard areas or mitigates the Complies
risks of the natural hazard to an acceptable or A very small portion of the site’s north eastern
tolerable level, and corner is identified as an erosion prone area and
subject to flood hazard. This area of the site is
located within proposed lot 9 which will
accommodate the existing detached house which
is outside the identified hazard areas. No new
development is proposed within the area of the
site mapped as being subject to natural hazards. In
this regard the development is considered to have
avoided natural hazard areas in accordance with
the assessment criteria.
(2) supports, and does not unduly burden, disaster Complies
management response or recovery capacity and As above it is considered that the proposed
capabilities, and development has avoided natural hazard areas. In
this regard the proposed development will not
negatively impact disaster management response
or recovery capacity and capabilities.
(3) directly, indirectly and cumulatively avoids an Complies
increase in the severity of the natural hazard and As above it is considered that the proposed
the potential for damage on the site or to other development has avoided natural hazard areas. In
properties, and this regard the proposed development will not
result in an increase in the severity of natural
hazards and the potential for damage on the site
or to other properties.
(4) avoids risks to public safety and the Not applicable
environment from the location of hazardous The proposal is for a residential subdivision. No
materials and the release of these materials as a hazardous materials will be stored on site.
result of a natural hazard, and
(5) maintains or enhances natural processes and Complies
the protective function of landforms and The landform of the area of the site mapped as
vegetation that can mitigate risks associated with being subject to natural hazards will remain
the natural hazard, and unchanged by the development. Vegetation within
the mapped natural hazard area will be maintained
which will assist in mitigating erosion hazard.
(6) is not located in an erosion prone area within a Not applicable
coastal management district unless: The site is not within a coastal management
a) it cannot feasibly be located elsewhere, and district.
b) is coastal-dependent development, or
temporary, readily relocatable or able-to-be-
abandoned development, and
(7) that is the redevelopment of existing permanent Not applicable
buildings or structures, is located outside an The proposed development is not for the
erosion-prone area or, where this is not feasible, redevelopment of existing permanent buildings or
redevelopment: structures.
a) is located:
i. as far landward from the seaward property
boundary as possible, or
ii. landward of the seaward alignment of the
neighbouring buildings, and
b) provides space seaward of the development
within the premises to allow for the future
construction of erosion control structures,
such as a seawall, and
(8) proposes to undertake coastal protection work Not applicable
(excluding beach nourishment) only as a last resort No coastal protection work is required or
Development Assessment Report Page 12 of 24
Reconfiguration of a Lot
28 Elkhorn Drive, Tewantin
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.