Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Negotiated Decision Notice - Advice Agency - DPI - 010.2006.00001395.001 [As Published] · 132006.1395

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                   - 11 -



72.   A Waste Management Plan (construction and demolition) shall be submitted prior to
      demolition, removal or relocation of any building other than a shed.
      A Waste Management Plan (construction and demolition) is also required for construction of
      15 or more dwelling units or for any business use of greater than 500m².
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Refer to
      Noosa Council Waste Management Code).
      The Plan shall contain the following information:
             The site area for the storage and separation of waste is to be shown on the plan
               drawings accompanying the application.
             A waste management table as indicated below is to be completed showing how waste
               material is to be segregated - recycled – reused or disposed.
           MATERIALS ON-SITE                  DESTINATION
                                              Re-use and Recycling                     Disposal
           Expected       waste   Estimated   On-site             Off-site             *specify
           materials              volume      *specify proposed   *specify             contractor    and
                                  (m³)        re-use or on-site   contractor     and   landfill site or
                                              recycling           recycling outlet     other     disposal
                                              methods                                  site
           Excavation
           material
           Green waste
           Bricks
           Concrete
           Timber-please
           specify
           Plasterboard
           Metals -     please
           specify
           Asbestos
           Other -      please
           specify


      Note * If a demolition contractor is undertaking works, then the Waste Management table is to
      be completed by the demolition contractor.


      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
      effective reuse and recycling of such materials. Additionally Council rewards those who
      segregate waste by significantly reducing disposal fees at the landfill some items are free.
      Higher gate fees are charged for loads of mixed waste.


                                                                                                  11 of 19

Used in these records

About this file

File size
154 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice - Advice Agency - DPI - 010.2006.00001395.001 [As Published].pdf · 154 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.