Council archive · source document
Attachment 3 - Current TPC 1724 Quamby Place Approval · 51985.3785.05
Attached to the e-mail Change to DA - 51985.3785.05 (TPC 1724).
188/99 /Admin Marduk 4 20. 21, 22. 23. 24. 25. 26. 27. Any flat or unit intended to be let out for fee or reward is to be licenced annually with Council's Health Department in accordance with the provisions of Chapter 43 of Council's By-Laws prior to such letting. The swimming pool shall be licensed annually with the Council's Health Department in accordance with the provisions of Chapter 42 of Council's By-Laws. Should S.E.Q.E.B. require provision of a transformer, such provision is to be made to the satisfaction of S.E.Q.E.B. and the Shire Planner. The transformer is not to be located within landscaping areas unless approved by the Shire Planner. An identification survey of the subject site is to be carried out by a Licensed Surveyor and is to be submitted to Council at the time of foundation inspection by Council's Building Surveyor or immediately thereafter. Such survey shall set out the boundaries of the site and the position of the buildings on the site. The provisions of this Town Planning Consent are to be effected, prior to the commencement of the specific use granted under this Consent Council reserves the right to call upon the bond or guaranteed sum referred to in this approval for the purposes of litigation should the use not be conducted in accordance with this Approval. Submission of a cash bond or trading bank guarantee to the sum of $50,000 to secure performance of conditions, prior to the issue of Building Approval. The cash bond or trading bank guarantee may be returned to the developer upon performance of the conditions of approval. This Consent may be revoked pursuant to Section 33 (16D) of the Local Government Act if substantial progress has not been made in the erection of any building or other structures in accordance with this Consent or the rights conferred by this Consent are not exercised in accordance with this Consent within two (2) years of the date thereof. The existing rock seawall at the river frontage of the site shall be upgraded to the original design profile at the full cost of the developer to the requirements of the Shire Engineer and the Beach Protection Authority. The developer shall arrange for the Body Corporate By-laws to include a responsibility clause for the maintenance of such wall to the requirements of the Shire Engineer.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Current TPC 1724 Quamby Place Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 334 KB (small file)
- File type
No other editions are linked here.