Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Attachment 3 - Current TPC 1724 Quamby Place Approval · 51985.3785.05

Attached to the e-mail Change to DA - 51985.3785.05 (TPC 1724).

of 5

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

188/99 /Admin Marduk 4

20.

21,

22.

23.

24.

25.

26.

27.

Any flat or unit intended to be let out for fee or reward is to
be licenced annually with Council's Health Department in
accordance with the provisions of Chapter 43 of Council's By-Laws
prior to such letting.

The swimming pool shall be licensed annually with the Council's
Health Department in accordance with the provisions of Chapter 42
of Council's By-Laws.

Should S.E.Q.E.B. require provision of a transformer, such
provision is to be made to the satisfaction of S.E.Q.E.B. and the
Shire Planner. The transformer is not to be located within
landscaping areas unless approved by the Shire Planner.

An identification survey of the subject site is to be carried out
by a Licensed Surveyor and is to be submitted to Council at the
time of foundation inspection by Council's Building Surveyor or
immediately thereafter. Such survey shall set out the boundaries
of the site and the position of the buildings on the site.

The provisions of this Town Planning Consent are to be effected,
prior to the commencement of the specific use granted under this
Consent Council reserves the right to call upon the bond or
guaranteed sum referred to in this approval for the purposes of
litigation should the use not be conducted in accordance with
this Approval.

Submission of a cash bond or trading bank guarantee to the sum of
$50,000 to secure performance of conditions, prior to the issue
of Building Approval. The cash bond or trading bank guarantee
may be returned to the developer upon performance of the
conditions of approval.

This Consent may be revoked pursuant to Section 33 (16D) of the
Local Government Act if substantial progress has not been made in
the erection of any building or other structures in accordance
with this Consent or the rights conferred by this Consent are not
exercised in accordance with this Consent within two (2) years of
the date thereof.

The existing rock seawall at the river frontage of the site shall
be upgraded to the original design profile at the full cost of
the developer to the requirements of the Shire Engineer and the
Beach Protection Authority.

The developer shall arrange for the Body Corporate By-laws to
include a responsibility clause for the maintenance of such wall
to the requirements of the Shire Engineer.

Used in these records

About this file

File size
334 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Current TPC 1724 Quamby Place Approval.pdf · 334 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.