Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Approved Plans MCU22-0080

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
GENERAL NOTES                                                                                  COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.                                                                                                    LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS

1.   ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.
                                                                                               CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND                       EARTHWORKS NOTES                                                               ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY
                                                                                               STOCKPILE ON SITE OR REMOVE FROM SITE AS DIRECTED.                                                                                                           PRACTICAL TO RESTRICT DUST MOVEMENT.
                                                                                                                                                                             1.  FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL              19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
2.   ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.                  18. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR,                          INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS                       THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
     CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY                             HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS.                                  RECOMMENDED THAT THE GEOTECHNICAL CONSULTANT BE CONTACTED                  WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
     SETOUT THE WORKS.
                                                                                       19. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT                                   TO CONFIRM THE SOIL CONDITIONS PRIOR TO EARTHWORKS
                                                                                                                                                                                                                                                        20. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
3.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                                AUTHORITY: ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN                            COMMENCING.
                                                                                                                                                                                                                                                            REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
     SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                             FOR ALL WORKS WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO                         2. GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF                   GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY
     CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                             ALLOW FOR ALL COSTS ASSOCIATED WITH IMPLEMENTATION OF THE                             100MM OVER THE EXTENT OF THE WORKS UNLESS DIRECTED                         UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED
     GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED                              TMP.                                                                                  OTHERWISE AND STOCKPILED WHERE REQUIRED FOR FILL OF                        AT 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO 3M
     STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.                                                                                                                                 LANDSCAPING AREAS. TOPSOIL MATERIALS MUST NOT BE USED IN
                                                                                       20. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL                                                                                                           IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL
3.   SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE                            AUTHORITY APPROVALS RECEIVED FOR THE PROJECT AND IN                                   STRUCTURAL FILL.                                                           ENGINEER.
     OF THE TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION                          ACCORDANCE WITH OPW APPROVALS BY COUNCIL.                                         3. UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR                21. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE
     AND LOCAL AUTHORITY REQUIREMENTS, THE CONTRACTOR WILL                                                                                                                       SOFT MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING                        ACHIEVED, TEMPORARY SHORING WILL BE REQUIRED UNDER THE ADVICE
     RECTIFY AT THEIR COST INCLUSIVE OF ANY ADDITIONAL COSTS                           21. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                             SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE
                                                                                           BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF                                                                                                       OF A SPECIALIST SHORING CONTRACTOR.
     INCURRED BY RECOR.                                                                                                                                                          MATERIAL TO BE REMOVED FROM SITE AT CONTRACTORS EXPENSE.
                                                                                           THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY, ROAD                                                                                                22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
4.   EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS                                                                                                           4. COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES                            SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE
                                                                                           RESERVE, PARKS/OPENSPACE, EASEMENTS.                                                  SUBSTANTIAL VOLUMES OF WATER COMBINED WITH VIBRATORY
     SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY                                                                                                                                                                                            CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ
     IS TAKEN BY RECOR OR THE PRINCIPAL FOR THE ACCURACY AND                           22. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION                             COMPACTION EQUIPMENT. CARE MUST BE TAKEN TO ENSURE THERE ARE               STRUCTURAL ENGINEER.
     COMPLETENESS OF THIS INFORMATION. IT IS THE RESPONSIBILITY OF                         DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.                                          NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO BE
                                                                                                                                                                                                                                                        23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT
     THE CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND                                                                                                                     COMPACTED IN ACCORDANCE WITH GEOTECHNICAL REPORT AND
                                                                                       23. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN                                                                                                      ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES ON
     LEVEL OF ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY                                                                                                                AS1289.
                                                                                           ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN                                                                                                         THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM
     WORKS. ANY DISCREPANCIES SHALL BE REPORTED TO THE                                     AND CONSTRUCTION CODE (2013).                                                     5. A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE                      FACTOR OF SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR
     SUPERINTENDENT. CONTRACTOR TO LOCATE AND PROTECT SERVICES                                                                                                                   REQUIRED ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN                    SATISFACTION.
     AS REQUIRED DURING PROPOSED WORKS.                                                                                                                                          AREAS TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN
                                                                                                                                                                                                                                                        24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS
                                                                                       STANDARD SIGNS AND LINE MARKING NOTES                                                     WOULD BE REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF ANY
                                                                                                                                                                                                                                                            INCLUSIVE OF TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING
5.   THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND                                                                                                                  HEAVY MOBILE PLANT ON THE SITE.
     SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS                         1. GENERAL                                                                                                                                                           DRAWINGS FOR BUILDING SLAB THICKNESSES AND HYDRAULIC
                                                                                                                                                                             6. IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND                        DRAWINGS FOR SUB-FLOOR DRAINAGE FOR DETERMINATION OF
     SHOWN ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING                             1.1.  ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH                         COMPACTED WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED
     SERVICES CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS.                                   THE QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC                                                                                                            REQUIRED BULK EARTHWORKS SURFACE.
                                                                                                                                                                                 AND AS OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM
     CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR                              CONTROL DEVICES (CURRENT EDITION).                                                                                                                        25. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
                                                                                                                                                                                 LEVEL. IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED
     AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL WORKS.                       2. SIGNS                                                                                                                                                             GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW
                                                                                                                                                                                 MATERIAL FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM
                                                                                         2.1. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS                                                                                                 FOR THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO
6.   ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS                                                                                                                 PARTICLE SIZE OF 100mm AND CAPABLE OF BEING COMPACTED INTO
                                                                                              NOTED OTHERWISE.                                                                                                                                              UNDERTAKE THE PRELOADING OPERATIONS.
     SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS,                                                                                                                       COHERENT FILLING TO THE SPECIFIED STANDARD. THE MATERIAL SHALL
                                                                                         2.2. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO                         HAVE A MAXIMUM PLASTICITY INDEX OF 15%, A SHRINK-SWELL INDEX OF        26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
     FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND
     ROAD PAVEMENTS.                                                                          EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE                          LESS THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%.
7.   CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO
                                                                                              POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM                       7. ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE             INSPECTIONS:
                                                                                              FACE OF KERB.                                                                      CONTENT FOR STANDARD COMPACTION.
     AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR                                                                                                                                                                                                 THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
     REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE                                  2.3. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING                        8. ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE
                                                                                              TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS                        PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF               BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS
     SATISFACTION OF INFRASTRUCTURE OWNER/MANAGER /                                                                                                                                                                                                     TO PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
     AUTHORITY/COUNCIL.                                                                       TO BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING                             RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN
                                                                                              HEADLIGHT.                                                                         CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH             INSPECTIONS. SHOULD THE
8.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL                          3. SIGN SUPPORTS                                                                          STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH           CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE
     WORKPLACE HEALTH AND SAFETY REQUIREMENTS.                                                                                                                                   CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT.                      RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED
                                                                                         3.1.  SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS
9.   WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN                                  WHERE THEY ARE IN A PAVED SURFACE.                                             9. REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR                        TO THE SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE
     CLOSE PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR                                 4. LINEMARKING                                                                            CONFIRMATION OF RETAINING WALL COLOUR AND FINISH.                      RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID BY THE
     INFRASTRUCTURE, CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO                            4.1. REDUNDANT LINEMARKING IS TO BE GROUND OFF.                                     10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2'          CONTRACTOR.
     PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY OF                           4.2. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.                             SOIL ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF          a.      PRESTART
     EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE                                                                                                                AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL
     USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS                                                                                                                       PROVIDE CERTIFICATION THAT ALL GENERAL EARTHWORKS OPERATIONS           b.      EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF
     REQUIRED.                                                                         JOINTING NOTES                                                                            HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND                      SEDIMENT AND EROSION CONTROL MEASURES UNSUITABLE GROUND
10. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON                                                                                                                     SPECIFICATIONS AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE         c.      SIDE AND CUT OFF DRAINS
    THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
                                                                                       1.      ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE                            TO THE REQUIRED BEARING CAPACITY UNDER THE
                                                                                               REQUIREMENTS OF AS3727.1:2016.                                                                                                                           d.      STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
    WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.                                                                                                                                PLATFORM/STRUCTURES AS SPECIFIED BY THE GEOTECHNICAL REPORT.
                                                                                       2.      SAW CUT JOINTS MUST BE:                                                       11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED             e.      STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
11. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL
    CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT                                   2.1.         BETWEEN
                                                                                                                   1 AND 1 OF CONCRETE PAVEMENT DEPTHS.                          TO 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX OF
                                                                                                                                                                                 AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN
                                                                                                                                                                                                                                                        f.      STORMWATER STRUCTURE BASE SLABS
    REQUIREMENTS. UNLESS OTHERWISE ADVISED BY RECOR CONTRACTOR
    TO NOTE COUNCILS ADAC REQUIREMENTS.
                                                                                                                   4 3                                                           LAYERS OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).                 g.      SEWER RETICULATION
                                                                                            2.2.
                                                                                               CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.                                12. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO               h.      WATER RETICULATION
12. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH                                    2.3.
                                                                                               PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE                              TESTS PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED
    RELEVANT APPROVALS.                                                                                                                                                                                                                                 i.      PAVEMENT SUBGRADE
                                                                                               POURS.                                                                            300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL
13. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,                          3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT                         EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL                     j.      PAVEMENT REINFORCING
    LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL                               TO ALLOW EXPANSION AND CONTRACTION MOVEMENTS.                                         ENGINEER AND LOCAL AUTHORITY REQUIREMENTS.
                                                                                                                                                                                                                                                        k.      PAVEMENT PRIOR TO SEALING (PRESEAL)
    CONSTRUCTION.                                                                      4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO                         13. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN
                                                                                           CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES                             ACCORDANCE WITH LANDSCAPE DRAWINGS.                                    l.      RETAINING WALL FOOTING REINFORCING
14. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR                                    IN THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS.                                 14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.                    m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
    DEMOLITION WORKS COMMENCING ON SITE.
                                                                                       5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES                       15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED                n.      STEEL REINFORCEMENT OF CONCRETE STRUCTURES
15. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES,                               ONLY AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB                         MANAGEMENT PLANS.
    ROADS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE                          SURFACE.                                                                          16. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE             o.      PRACTICAL COMPLETION
    U.N.O.                                                                             6. DOWEL BARS ARE TO BE                                                                   INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT FENCE         p.      ON MAINTENANCE
16. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING                           6.1.   FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT                        ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.
                                                                                                                                                                                                                                                        q.      OFF MAINTENANCE
    PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO                                           400MM CENTRES                                                                 17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS
    COMMENCEMENT OF ANY WORKS ON SITE.                                                  6.2.   FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT                        OR RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER RELEVANT            r.      ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
                                                                                               300MM CENTRES                                                                     AUSTRALIAN STANDARDS AND LEGISLATION.                                          DEVELOPMENT APPROVAL)
17. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS
    IDENTIFIED IN THE APPROVED VEGETATION MANAGEMENT PLAN.                              6.3.   FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT                    18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON                 s.      ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE
    CONTRACTOR TO ENSURE ALL TREE ROOTS AND STUMPS ARE                                         300MM CENTRES                                                                     UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT                    RELEVANT TO THEIR CERTIFICATION SCHEME




                                                                                                                         CLIENT DETAILS:                                   PROJECT ADDRESS:                                   APPROVED BY:                   PROJECT NAME:

                                                                                                                                                                                                                                                             PROPOSED RESIDENTIAL DEVELOPMENT
                                                                                                                                  MARK BAIN CONSTRUCTIONS                                                                                                    TITLE:                                   STATUS:

                                                                                                                                           PTY LTD                                   15 ROSS CRESCENT,                                                       GENERAL NOTES                            RFI RESPONSE
          © ABN 89 647 469 707
                                                                                                                                                                                  SUNSHINE BEACH, QLD 4567                             JARO BAULEKA
            75 NOOSA DRIVE                                                                                                                                                                                                               RPEQ: 2693
                                            01   02/09/22   RFI RESPONSE ISSUE                     JAC     MVP      JB   SCALE:
         NOOSA HEADS, QLD 4567                                                                                                                                                                                                             CPEng
             +61 7 5211 1003               REV   DATE                DESCRIPTION               DWN         CHK     APP
                                                                                                                                                    N.T.S.                                                                             DATE: 02/09/22
                                                                                                                                                                                                                                                             DRAWING NUMBER:                          PROJECT NUMBER:          SHEET REV:
                                                                                                                                                                                                                                                                                                                                SIZE:
         RECORCONSULTING.COM                                               REVISIONS
                                                                                                                                           DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                             002                                      20220072                 A1 01
Log in to download the original file

Approved Plans MCU22-0080.pdf · 11.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.