012 FORMS ANO EQUIPMENT
Before placing, all equipment for mixing and transporting the concrete shall be
clean, debris shall be removed from that place to be occupied by the concrete, and
forms shall be thoroughly wetted. Forms shall conform to the shape, lines and
dimensions of the concrete as called for in the Drawings. The surface of all forms
in contact with concrete shall be clean, and forms shall be substantial and
sufficiently tight as will prevent leakage of mortar. Forms shall be supported and
braced so that they will not deflect, distort or move out of position when concrete is
placed and compacted.
The Contractor shall have available on site and operational at short notice,
adjustable forms, vibrating screeds and associated equipment suitable to carry out
the following work:
Complete concreting work by hand methods to an approved construction joint in
the event of machine failure.
Remedial work to any surface where a machine has not fmished concrete to a
satisfactory standard.
013 TOLERANCES
Kerbs shall be within +3 mm in line and level from the positions shown on the
Drawings and shall not deviate more than 3 mm from a 3 m straight edge.
014 CURING
Exposed surfaces of concrete shall be kept constantly damp for the first seven days
after placing. Alternatively, curing compounds may be used subject to the
agreement of the Superintendent.
015 JOINTING
015.1 Kerb, water tables, spoon drains and edge strips
Shrinkage control joints shall be constructed by template for hand laid work using
fixed form work. Joints shall be regularly spaced at 3 m intervals using a spacer or
guillotine 3 mrn thick. A minimum of 50% of the area of the selection shall be cut.
The resultant slot in the section shall be tooled to a depth of not less than 20 mm to
produce a neat groove of less than 5 mm in width.
Construction joints shall be created wherever the work of placing concrete is
delayed until the concrete has taken its initial set. Joints shall be made during
pouring and not saw cut after hardening.
The construction joints shall be located at the nearest 3 m shrinkage joint as
specified above, and shall be avoided in entranceway inverts, pram inverts and radii
at street corners.
The construction joints shall be straight and perpendicular to the kerb face and
vertical in the kerbs and shall be tooled off to provide a neat groove.
AEVI07.201-TD-CV-SPC-OOOI Rev. A D-4
IOJllly 2012 KBR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application IDAS Form 1 & 6 - OPW12/0439Related documentApplication case desk ↗
About this file
- File size
- 12.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.