Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Development Application IDAS Form 1 & 6 - OPW12/0439

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (12.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

2.2    Laboratory Testing
Laboratory testing was undertaken at Coffey’s NATA accredited Keswick laboratory on samples of
subgrade material and comprised:

         Soaked CBR testing on seven samples (2natural and 5fill)


         Atterberg.lim ts and particle size distribution analyses on seven samples (6natural and 1 fill)

The soaked CBR testing was conducted on samples remoulded at optimum moisture content to a target

dry density ratio of 98% relative to Standard compaction (AS12895.1.1). The samples were then
soaked for four days with a 9 kg surcharge prior to testing.

Estimated CBR values were calculated from results of Atterberg limits and particle size distribution

analyses based on a method used by the Department of Planning, Transport and Infrastructure (DPTI).

The results of the laboratory testing are presented in Appendix B.



3          SITE CONDITIONS


3.     Site Descripiion

The site fOf the proposed roads around the Woolworth’s area is located north of Curtis Road and either
side of Peachy road at Munno Para West.

At the lime of the investigation the area to the east of Peachy Road comprised vacant open land with a

relatively level surface of bare earth. The materials exposed at the ground surface were assessed to be
engineered fill.

The area west of Peachy Road comprised a construction site for a nearby development wth associated
unsealed car parking areas, access tracks and areas of bare earth. A temporary construction road was

present in the south of the site which had a quarry rubble surface.

An open unlined channel was present in the northwest corner of the site west of Peachy Road. The
channel is understood to have been constructed for slormwater drainage for previous stages of

development and is being progressively backfilled as part of the current Playford Alive redevelopment.
These backfilled channels are understood to extend across parts of the current site area.

At the time of the investigation much of the study area had been subject to previous filling activities and
filled above surrounding ground surface levels. II is understood that the placement of the fill was
conducted under Level 1 "observations" and have been assessed as ~controlled fill" for engineering

purposes by others. Coffey has not sighted any records related to the fill placement.


3.2    Regional Geology
The Geological Survey of South Australia (1:50,000 Gawler Sheet) indicates that the site is underlain at
shallow depth by the Poofaka Formation. These soils typically comprise red-brown clay and sandy

clay, possibly with sand and gravel lenses associated with former drainage channels. At deeper depths
the site is underlain by H ndmarsh Clay consisting of mottled red-brown sandy clay with sand and

gravel lenses.




Correy Geolechnics                                                                                         2
06974AB.AB
6 June 2012
                                               "

Used in these records

About this file

File size
12.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application IDAS Form 1 & 6 - OPW12_0439.pdf · 12.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.