F10 REMOVAL AND DISPOSAL OF WATER
The Contractor shall provide and maintain the means and equipment required to
sustain water at levels to suit his method of excavation and for the proper disposal
of water entering the excavation and other parts of the work.
All excavation shall be maintained in a dry condition and no bedding material or
concrete shall be placed in water except with the prior approval of the
Superintendent.
F11 PROTECTION OF PROPERTY AND STRUCTURES
The Contractor shall at his own expense, properly maintain in their places and
protect from damage all pipes, poles, conduits, walls, buildings, piers, and
abutments, and any other structures, utilities and property within the vicinity of his
work. The Contractor shall give due notice in writing to the owner of any property
orutility that may be affected by his construction operations at least forty-eight
(48)hours prior to his actual commencement of such work.
The Contractor shall be responsible for all damages and costs involved in respect
thereof, caused by his Contract construction operation to any person, utility service,
property or structure.
F12 COMPACTION TESTING
Where fill is required to be compacted to a specified density, tests for compliance
may be carried out by the Superintendent, using the test procedures specified as in
AS 1289.5.2.1.
The Principal will pay for one series of tests only, as a basis for compliance and
acceptance of work -
to be undertaken upon the advice of the Contractor that the
works have been completed to Specification and are ready for testing. If any of
these tests should fail or show non-compliance with the Specification, retesting will
be at the Contractor’s expense.
F13 BEDDING
F13.1 ETSA cables and/or conduits
The Contractor shall supply and place a minimum 100 mm layer of bedding sand
(Type A) at the base of all trenches. This material shall be kept free of all rubbish
and foreign matter. All necessary excavation works shall be completed in stages as
required prior to the laying of cables by ETSA.
F14 ETSA CORPORATION CABLES AND/OR CONDUITS
F14.1 Sand protection
After the laying of cables (and/or conduits) and with the approval of ETSA, the
Contractor shall supply and place sand (Type A) to cover all cables the underside of
the gas main level. No ETSA cables are to be left unsanded overnight.
AEVI07.201-TD-CV-SPC-000I Rev. A F-6
10JI/ly 2012 KBR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application IDAS Form 1 & 6 - OPW12/0439Related documentApplication case desk ↗
About this file
- File size
- 12.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.