Council archive · source document
Development Application IDAS Form 1 & 6 - OPW12/0439
Very large file (12.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
F4 MATERIALS
F4.1 Sand type A
-
This material shall be free flowing pit or beach sand, clean and completely free of
all fibrous vegetable matter which may attract or be attacked by termites. The sand
shall consist of well rounded particles, free of any sharp or hard materials and with
100% passing the 4.75 mm sieve and not greater than 10% passing a 0.075 mm
sieve.
F4.2 Sand type B
-
This material shall be coarse, free flowing pit or beach sand, with a plasticity index
less than 5. The material shall be clean with not greater than 10% passing the
0.075 mm sieve and with 100% passing the 6.25 mm sieve, and such that it can be
satisfactorily and economically compacted in the dry state.
Compaction shall be obtained by rolling or mechanical tamping.
F4.3 Select material for trench backfilling
This material shall be sand or selected soil, as approved by the Superintendent. It
shall be free from rock or other hard particles that would be retained on a 13.2 mm
sieve and free from lumps of soil having dimensions greater than 50 mm. Normally
the excavated material, if free from rock and well broken up by the ditcher, will be
deemed suitable. If this is not the case, suitable material shall be obtained from on-
site stockpiles of selected material provided by the Principal.
F4.4 Graded gravel
This material shall be supplied and placed by APA. Material used by APA shall
meet the requirements of both NBN and ETSA.
The Superintendent reserves the right to permit APA to utilise previously excavated
material.
F5 CLEARING AND GRUBBING
This section refers to vegetation, perishable materials of any nature and surface
obstructions that are required to be removed and that lie within the actual cut and/or
fill operations area.
No trees shall be felled, destroyed or interfered with by the Contractor in his
construction operations unless he has first received authorisation from the
Superintendent to fell, remove or otherwise interfere with such trees. Refer also the
’Earthworks’ section of this Specification for further details on trees.
F6 EXCAVATION
F6.1 General
Generally, limits for depth of excavation for the Common Service Trench shall be in
accordance with details shown on the Drawings.
AEVI07.201-TD-CV-SPC-000I Rev. A F-3
10 July 2012 KBR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application IDAS Form 1 & 6 - OPW12/0439Related documentApplication case desk ↗
About this file
- File size
- 12.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.