Council archive · source document
Development Application IDAS Form 1 & 6 - OPW12/0439
Very large file (12.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
coffey~~’ geotechnics SPECIALISTS MANAGING THE EAR’TH
Worldparl<, 33 Richmond Road, Keswlc.k SA S035
Ph: (08)83754400 Fait: (08)8375 4499
Test
Client: KELLOGG BROWN AND ROOT PTY LTO Job No. 06974AB
Principal: DCP Test No. BH2
Project: PROPOSED PAVEMENTS.WOOlWORTHSAREA Tested On: 9-May-12
Location: PLAYFORD ALIVE Date: 11-Ma -12
Test Method: AS 1289 .
6.3.2 -
1997 Determination of the Penetration Resistance of a Soil using 9 kg
Dynamic Cone Penetrometer
Hammer Mass: 9.06 kg Hammer Drop: 508 mm
Number of Blows per 100 mm Penetration
0 2 4 6 8 10 12 14 16 18 20
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
_.~
0.9
1
1.1
1.2
1.3
1.04
1.5
1.6
1.7
~ 1.8
_g 1.9 -
.r.
....
2
Q.
GI
I
0 2.1
2.2
2.3
--~-=
2.4 i=
2.5
2.6
2.7
2.8
2.9
3
3.1
3.2
3.3
o
g- _
.
3.4
3.5
3.6
_____.J
3.7
06974AB OCP’S bh1-bh16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application IDAS Form 1 & 6 - OPW12/0439Related documentApplication case desk ↗
About this file
- File size
- 12.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.