022.2 Oowellng
Pram ramps shall be dowelled into the abutting footpath with 300mm long, 16mm
diameter Grade 250R steel bars at 300mm centres. The dowels shall be straight,
smooth and free from burrs and shall be capped and greased one end. Dowels shall
be placed orthogonal to the joint direction and parallel to the pavement surface.
023 CONCRETE TESTING
023.1 General
The Contractor shall carry out the following tests on samples of concrete to be
selected on site by the Superintendent:
Type of test No. ofsamples No. ofcylinders
Compression strength ~ 3 per sample (I tested at 7 days,
(cylinder test) 2 tested at 28 days)
Slump ~ I test per sample
~’!1Pj:Qvg -NA~~feg!stered testing authority shall be engaged by the Contractor.
The Contractor shall forward testing certificates to the Superintendent within 3 days
of testing being carried out.
023.2 Frequency of sampling
The minimum frequency of sampling of concrete of each type shall be In
accordance with the following:
No. of batches (i.e. truck loads) per day No. of samples
~ \!>
2 to 5 2
6 to 10 3
II to 20 4
for each additional 10 I additional sample
AEVI07.201.TD.CV.SPC-000I Rev. A D-?
10Jllly 2012 KBR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application IDAS Form 1 & 6 - OPW12/0439Related documentApplication case desk ↗
About this file
- File size
- 12.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.