020 EXPOSED AGGREGATE SURFACES
Sample panels are required to assess the techniques, surface finish, distribution of
stones and colour. The finish shall be agreed with both the Superintendent and
Council prior to undertaking the work on site.
The wash-off technique removes a thin layer of cement paste by rushing and
flushing the surface with a waster spray soon after concrete has stiffened
Management is required of the liquid waste flushed off the concrete as part of the
wash-off process. The waste shall not be discharged into the stormwater system.
021 REJECTION OF CONCRETE
The Superintendent may refuse to accept concrete after it has hardened if:
it is porous, segregated or honeycombed;
the construction joints are not as specified;
the reinforcement is disturbed;
the required surface finish has not been achieved;
the strength requirements have not been met;
the required finished levels or dimensions of the structure have not been
achieved.
Immediately following the Superintendent’s refusal to accept any concrete, the
Contractor shall, at his own expense, demolish and remove from the site the
unacceptable concrete and shall reconstruct the said concrete at his own cost in
accordance with the Drawings and the Specification.
No extension of time of completion will be granted for delays occasioned by
demolition and rebuilding of concrete and associated work.
022 PRAM RAMPS
Pram ramps shall be installed at locations shown on the Drawings with additional
locations nominated in writing by the Superintendent. Pram ramps shall be
constructed in accordance with the details in Appendix IX of this Specification.
The width of the pram ramp shall match the abutting footpath width as shown on the
drawings.
Pram ramps shall be constructed integral with the watertable (i.e. in a single pour).
A construction joint between the ramp and water table will not be accepted. Where
required, common service conduits installed by the Contractor at road crossings
shall be extended 900mm beyond the pram ramps to enable access to the conduits
for CST works.
022.1 Grab Rails
Bicycle/pedestrian grab rails nominated on the drawings shall be constructed in
accordance with the details contained in Appendix IX of this specification.
AEV107.201-TD-CV-SPC-0001 Rev. A D-6
10 July 2012 KBR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application IDAS Form 1 & 6 - OPW12/0439Related documentApplication case desk ↗
About this file
- File size
- 12.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.