               Shrinkage control joints for extruded kerbs and gutters shall be constructed by
               guillotining.

015.2          Concrete pavements

               Surfaces shall be kept continuously wet until the form work is removed.

               The location and type of construction joint shall be planned in advance to comply
               with the requirements of the Superintendent.

               Form construction joints in horizontal members against a vertical barrier unless
               otherwise shown on the drawings.

               Before fresh concrete is placed against hardened concrete at a construction joint, the
               joint surfaces of the hardened concrete shall be thoroughly roughened and cleaned
               so that all loose or soft material, free water, foreign matter and laitance are removed.


               Provide a weakened plane joint at 1.5 m centres with a tooled finish and a clean
               break at 4.5 m centres with a tooled finish.



016            CONCRETE FINISHES

               Visible concrete surfaces shall be finished to Class 3 finish in accordance with
               AS 3610. Concealed surfaces shall be finished to Class 4 finish.



017            PITS

               Pits shall be standard Council pits as detailed in Appendix IX.

               Alternative rectangular pit designs (pre-cast or in-situ) may be used in instances
               where standard Council pits are deemed inappropriate, however, this shall be agreed
               with the Superintendent.



018            KERBING


018.1          New roads

               All kerbing shall be constructed in accordance with the details shown on the

               Drawings.

               Existing roads

               All kerbing on existing roads shall match the existing kerb profile.



019            ORAIN OUTLETS


               Drainage outlets between the kerb and private property shall be constructed In
               accordance with the drawings.




AEVI07.201-TD-CV-SPC-000I Rev. A                     D-5
10 July 2012                                                                            KBR

Used in these records

About this file

File size
12.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application IDAS Form 1 & 6 - OPW12_0439.pdf · 12.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.