2021-09-13 GC Agenda - Item 11 - Attachment 1 - Noosa Oyster Project Annual Report 2

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Small craft           + 10 m   Areas within      Creates 20 m buffer with centre as per           Agreed with
channels              buffer   buffer = 0; all   Maritime Safety Queensland Beacon to             MSQ
                               other areas =     Beacon suggested passage. Allows for
                               4                 adequate restoration site area at narrow
                                                 sections of the estuary while maintaining
                                                 safe navigational passage. In relative,
                                                 restoration sites will be closer to shorelines
                                                 to avoid boating interactions.
Tidal Works           + 30 m   Within 250m       Prefers restoration sites closest to access      Agreed with
(pontoons, jetties,   buffer   = 4; all other    points. Included as a way of reducing cost of    MSQ
boat ramps)                    areas = 2         substrate deployment. 30 m buffer
                                                 included to reduce chance of damage to
                                                 restored oyster beds, vessels, and for the
                                                 safety of workers.
Moorings              + 30 m   Within 30 m       Ensures safe distance to eliminate chances       Agreed with
                      buffer   = 0, all other    of damage to moored vessels or restored          MSQ
                               areas = 4         oyster beds.
Foreshore Access      + 10 m   Within            Areas excluded to maintain high level of         Agreed with
                      buffer   exclusion         public access to foreshore. 10 m adjacent        MSQ
                               area = 0, all     buffer included for ease of vessel access.
                               other areas =
                               4
In-water urban        +5m      Within            Ensures safe distance to eliminate chances       Proposed to
utilities             buffer   exclusion         of damage to submarine cables and                Unity Water
(submarine cables              area = 0, all     pipelines.                                       and Telstra
& pipelines)                   other areas =
                               4
In-water urban        + 30 m   Within            Avoid existing infrastructure                    Agreed with
utilities (cross-     buffer   exclusion                                                          MSQ
river cable barges,            area = 0, all
ferry terminals,               other areas =
etc.)                          4




                                                                                                                38
Log in to download the original file

2021-09-13 GC Agenda - Item 11 - Attachment 1 - Noosa Oyster Project Annual Report 2(PDF, 8MB).pdf · 8.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.