Original source · versioned page text
2021-09-13 GC Agenda - Item 11 - Attachment 1 - Noosa Oyster Project Annual Report 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Project restoration plan
TNC developed the Project Restoration Plan tailored to government requirements (Figure 18). The plan is a central
tennet of permit applications. The plan provides agencies with an overview of the project context and management
arrangements, and outlines technical details pertaining to the selection and design of restoration sites in the Noosa
River estuary.
The plan includes risk assessments assessed against environmental, social and aesthetic parameters and details
management arrangements for the four restoration sites. The plan is supported by 14 annexes, including engineering
certified site plans and multiple regulatory assessments.
The plan represents a major and unique (for Queensland) body of work involving four consultancy firms, TNC
restoration specialists, input from members of the project Technical Advisory Group (TAG), local stakeholders, project
partners, DAF and MSQ.
Key content from the plan is available in project reports or project briefs. Additional information regarding
construction and site management will be reformated into publically digestable formats and released widely at the
appropriate times. Before implementation, the Project Restoration Plan will be updated in line with permit conditions.
Figure 18: Project Restoration Plan
45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.