Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2021-09-13 GC Agenda - Item 11 - Attachment 1 - Noosa Oyster Project Annual Report 2

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                        To improve the environmental health of the Noosa River Estuary through active
Project Goal            restoration and conservation activities that engage the Noosa Community in meaningful
                        conservation and support economic and community wellbeing.
                                                   Expected
                                                   completion date                                Party
Objectives              Deliverables               (from 1 July 2019 Measurable outcomes          responsible for
                                                   unless otherwise                               Deliverable
                                                   stated)
                        works/activities for                            to Noosa Council by TNC
                        future period.                                  in conjunction with
                                                                        Noosa Council officers
                                                                        for its approval for
                                                                        endorsement within 90
                                                                        days of the end of each
                                                                        financial year during the
                                                                        term of the Agreement,
                                                                        and (if acceptable)
                                                                        approved by Noosa
                                                                        Council.
                                                                        6 monthly status and
                        (A1.6) 6 monthly status                         progress reports, and
                        and progress reports                            financial statement, are
                        which address, at a                             produced, endorsed by
                        minimum:                                        the Technical Advisory
                        Progress against                                Group, and provided to
                        deliverables and                                NSC, within 30 days of
                        monitoring and              6 monthly           end of each six (6) month TNC
                        evaluation report.                              period. Reports and
                        6 monthly financial                             financial statements due
                        statements including                            at the end of the
                        a statement of Project                          financial year may be
                        income/funding and                              included with annual
                        expenditure                                     reports and the final
                                                                        report.
                        (A2.1) Oyster reef
                        restoration suitability                         Habitat suitability model
A-2: Site selection     model incorporating                             which incorporates
                        physical parameters of      12 months           industry, Kabi Kabi
                                                                                                  TNC
Identify suitable       oysters and public and                          knowledge and public
restoration sites for   industry usage, access                          interests.
Phase II and Phase      etc. to identify priority
III and appropriate     sites for restoration.
reef design that                                                        Outcomes:
                        (A2.2) Obtain necessary
minimize estuary-                                                       (a) Obtain all required
                        State government
user conflict whilst                                                    State government
                        permits/authorities                                                       13(a) - TNC
optimizing reef                                                         permits/authorities for
                        including particular        18 months
rehabilitation                                                          installation of oyster
                        resource allocation
                                                                        reefs.
                        authority, for oyster reef                                                13(b) – NSC
                                                                        (b) Obtain all required
                        restoration
                                                                        Local government



                                                                                                                53
Log in to download the original file

2021-09-13 GC Agenda - Item 11 - Attachment 1 - Noosa Oyster Project Annual Report 2(PDF, 8MB).pdf · 8.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.