Skip to the record
Every meeting, every word.

Original source · versioned page text

2021-09-13 GC Agenda - Item 11 - Attachment 1 - Noosa Oyster Project Annual Report 2

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                     To improve the environmental health of the Noosa River Estuary through active
Project Goal         restoration and conservation activities that engage the Noosa Community in meaningful
                     conservation and support economic and community wellbeing.
                                                Expected
                                                completion date                                 Party
Objectives           Deliverables               (from 1 July 2019 Measurable outcomes           responsible for
                                                unless otherwise                                Deliverable
                                                stated)
                     outcomes of community                           aggregated 600m2
                     consultation.                                   surface area of restored
                                                                     oyster reef in the Noosa
                                                                     River estuary.
                     (A4.3) Monitoring and
                     evaluation study for both
                     pilot and full restoration  Ongoing for         Annual monitoring and
                     sites. Monitoring to        duration of         evaluation report card
                                                                                                TNC
                     include oyster metrics,     project, at least   with 6 monthly status
                     invertebrates and fish      6 monthly           reports to be provided.
                     use (detailed in MER
                     plan).
                     (A5.1) Run workshop
                     with NSC to identify
                                                 9 months            Workshop completed.        TNC & NSC
                     ongoing focus areas for
                     TNC support.
                                                                     Minimum 5 peer review
                                                                     reports completed
                                                                     during the three-year
A-5 Noosa River
                                                                     term of this Agreement,
Plan
                                                                     if requested by NSC. If
                     *(A5.2) Provide
                                                                     NSC requests a peer
Provide technical    technical/peer review on
                                                 Ongoing for         review, TNC will provide
and expert support   minimum five
                                                 duration of         a minimum of 3 experts     TNC
to Noosa for         plans/reports/studies if
                                                 project             who are qualified in the
planning,            requested by Noosa
                                                                     relevant area of
implementation       Council.
                                                                     expertise for NSC
and evaluation
                                                                     consideration and Noosa
associated with
                                                                     Council’s acceptance of
appropriate
                                                                     one expert for the peer
elements of the
                                                                     review.
Noosa River Plan
                     *(A5.3) Facilitate a
and other coastal
                     minimum of three study
and marine
                     tours of relevant sites in                      Minimum three
management plans
                     line with objectives and                        individuals on study tours
                     scope of the program in     36 months           completed during the
                                                                                                TNC & NSC
                     Australia/US if requested                       three-year term of this
                     by Noosa Council (flights                       Agreement, if requested
                     and incidentals covered                         by Noosa Council.
                     separately by Noosa
                     Council, accommodation




                                                                                                              55
Log in to download the original file

2021-09-13 GC Agenda - Item 11 - Attachment 1 - Noosa Oyster Project Annual Report 2(PDF, 8MB).pdf · 8.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.