2021-09-13 GC Agenda - Item 11 - Attachment 1 - Noosa Oyster Project Annual Report 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
• Media highlights included the joint TNC-NSC media release for the Reef Builder project
• TNC reached 436,547 people through mainstream media and 23,666 people through social media;
• 459 people visited the project website;
• 15 tonnes of oyster shell was recycled and prevented from entering landfill;
• One partnership formed with Noosa Integrated Catchment Association (NICA) to deliver oyster gardening
and water quality monitoring;
• One partnership with Noosa Environmental Education Hub (EEhub) established to deliver the Noosa Senior
Schools engagement project with three local schools;
• One partnership with Noosa Biosphere Community Association (NBCA) established to deliver the Junior
Schools engagement project with three local schools including indigenous involvement and community
awareness;
• Detailed bathymetry of four oyster ecosystem restoration sites mapped with partner Northgroup Consulting;
• Detailed habitat mapping of four oyster ecosystem restoration sites completed with partner Ecological
Service Professionals (ESP);
• Three engineered concept models and four engineered site plans developed and certified for four oyster
ecosystem restoration sites with coastal specialist partner, Integrated Coastal Management (ICM);
• Detailed Project Restoration Plan including risk assessments, site management and contingency measures
developed and submitted to government. Annexed to the Restoration Plan are five detailed government
code assessments;
• Project information sheet, Project Q&A information sheet, Rock Oyster Fact Sheet, and special Project Brief
(reef design and restoration sites) developed and distributed;
• 101 stakeholders received the Noosa Oyster Chronicle news circular - Autumn 2021 and Winter 2021
editions;
• Three local quarries assessed for capacity to provide quality rock for oyster reef patches;
• One construction loadout site identified to support construction works with the support of Noosa Shire
Council (NSC)
Currently in progress:
• Oyster seeding contract development to produce 5-10m oyster spat
• Shell washing and bagging of 2 tonnes of cured oyster shell;
• Monitoring and evaluation contract development and baseline survey planning;
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.