Officer Name: Michael Lyons Officer Email: [email protected] Phone No: 07 5329 6500 CRM No: RM2022/09056 & RM2020/5358 7 June 2022 OZCARE c/- 66 River Terrace Kangaroo Point QLD 4169 Attention: Anna Gorgijeski ([email protected]) Dear Ms Gorgijeski, Re: APPROVAL to remove vegetation for fire management purposes 100 Cooyar Street, Noosa Heads Council advises that your recent application for permission to remove vegetation for fire management purposes within Girraween Nature Refuge (1SP239726) has been approved under specific conditions as indicated below: General 1. Approval is for the removal of vegetation, as detailed in permit application and email sent to Council 27" April 2022. No vegetation, other than that specifically approved for removal, is to be damaged. 2. The applicant, Ozcare, is responsible for all costs associated with the work and reinstatement of the site to Council Approved Standard. 3. Should the work result in damage to council infrastructure or should remediation of the site be required following completion of the work, council may use part or all of the bond to fund such work. Should the amount of the bond be insufficient to cover costs, the applicant will be liable to cover those additional costs. 4. Residents who may be affected by the removal of the tree must be notified of the work at least three days in advance of the work being undertaken. 5. All debris associated with the work must be removed from the site. 6. A Council representative attends a pre-start meeting prior to works commencing. 7. Ajoint (Ozcare & Noosa Shire Council) media release, stating purpose of activity is to be published for broader community notification. 8. No impacts to Endangered, Vulnerable & Near Threatened species identified under the Queensland Nature Conservation Act 1992. 9. Sheoak (Allocasuarina littoralis) trees are to be retained in perpetuity as per submitted survey to Council on the 27" April 2022. Contractors 10. Approved Noosa Council contractors must be engaged to undertake the approved work. 11. Contractors are required to be trained to AQF Level 3 in Arboriculture or equivalent recognised and with relevant experience, 12. All work is to be performed in accordance with all applicable laws, ordinances and regulations required by authorities having jurisdiction over such work and provide for all inspections and permits required by Federal, State and Local Governments and Authorities in furnishing and transporting materials. 13. All Workplace Health & Safety regulations must be adhered to. NOOSA COUNCIL PO Box 1414 P. (07) 5325 6500 [email protected] ABN. 97 Gea 214 L TEWANTIN QLD 4565 F. (07) 5329 6504 www.noosa.qid.gov.iau Document Set ID: 21955679 Version: 1, Version Date: 08/06/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 29 pages
Page 2
14. All machinery is to be controlled by competent operators in possession of appropriate and current licences/tickets. 15. Contractors must hold Public Liability Insurance in the sum of $20 million. 16. The Dial Before You Dig information obtained (this can be done online at https://Awww.1100.com.au/) which demonstrates that the tree works will not interfere with existing underground services, is to be provided to the tree contractor prior to works commencing. 17. Traffic and pedestrian access and management must be MUTCD (Manual of Uniform Traffic Control Devices) compliant. 18. Work must be undertaken and completed within 28 days of receipt of approval. Native wildlife 19. A licensed and qualified fauna spotter/catcher is present at all times during operations. Stumps 20. Stumps are to be cut as low as possible and poisoned with an appropriate herbicide application to prevent re-shooting. OR 21, Stumps must be ground to a minimum depth of 200mm. 22. Stump grinding is to be inclusive of any surface roots that may be reasonably considered a potential trip hazard to pedestrians. 23. Woodchip produced during stump grinding is to be removed from the site. 24, Depressions created during stump grinding operations must be back filled to existing ground level with soil containing no more than 2% organic material. 25. Stump grinding sites are to be left in a clean and safe condition for use by pedestrians. Please note that in order to receive the Bond refund OZCARE must email Council to advise completion of all works and provide your bank account details. Once inspected and all works are fully completed and accepted, Council will release the performance bond back to you. Should you wish to discuss this issue further, please do not hesitate to contact our Natural Areas team at [email protected]., or Council’s contact officer noted on this correspondence. Please quote RM2022/09056 for any future communication regarding this matter. Yours faithfully, Leo Jensen Director Environment and Sustainable Development (Acting) Document Set ID: 21955679 Version: 1, Version Date: 08/06/2022
Page 3
Noosa National Park
Girraween Nature Refuge
1
ProE yer!
Page 4
From: Ashley Everton
Sent: Wednesday, 27 April 2022 3:15 PM
To: Michael Lyons <[email protected]>
Cc: Lisa Pienaar <[email protected]>; Kerri Coyle <[email protected]>; Peter
Milne <[email protected]>; Fred Jacuzzi <[email protected]>; Anna
Gorgijeski <[email protected]>
Subject: RE: Ozcare Noosa - 100 Cooyar St Noosa Heads
Importance: High
Hi Michael,
We have not received Council’s updated letter as identified below.
However, please find attached our final Bushfire Vegetation Management Application to undertake
works within the Girraween Nature Refuge on Lot 1 SP 239726. We would greatly appreciate if
Council could issue a fee quote for the updated application and bond fees for Ozcare to organise
payment, to then enable Council to issue the final approval to enable the works to occur from 9th to
13th May 2022.
If you have any questions please call me on my mobile to discuss.
Thanks,
Ashley
Ashley Everton Associate Director
Planning
T. +617 3852 1822
M. +61 423 741 892
W. ethosurban.com
Level 4, 215 Adelaide Street
Brisbane QLD 4000
(Turrbal, Jagera and Yugara Land)
Page 5
Our ref: 7190526
Council ref: PLM21/0010 & RM20205358
27 April 2022
Environmental Operations
Environment and Sustainable Development
Noosa Shire Council
Att: Michael Lyons
By email: [email protected]
Dear Micahel,
RE: Bushfire Vegetation Management Approval
Girraween Nature Refuge on Lot 1 SP 239726
Reference is made to Council’s RM20205358 Bushfire Vegetation Management Conditional Approval dated 7
October 2020 and pre-lodgement advice dated 17 July 2021.
This letter has been prepared by Ethos Urban on behalf of the Applicant, Ozcare, seeking final approval to
undertake bushfire vegetation management works within the Girraween Nature Refuge on Lot 1 SP 239726.
This request is supported by the following information:
Attachment 1 - RM20205358 Bushfire Vegetation Management Conditional Approval
Attachment 2 - Council pre-lodgement advice 17 July 2021
Attachment 3 - Arboriculture Qualifications
Attachment 4 - Work Cover and Liability Insurance
Attachment 5 - Survey
Attachment 6 - Risk Assessment Form
Attachment 7 - Application Pathway & Infrastructure Agreement Correspondence
Attachment 8 - Access trail crossing
Smart People, T. +61 7 3852 1822 E. [email protected] L4, Adelaide Street Brisbane ABN.
People Smart W. ethosurban.com QLD 4000 13 615 087 931
Page 6
Ozcare Noosa | April 2022
Response to RM20205358 Bushfire Vegetation Management Conditional Approval and Council pre-lodgement advice 17 July 2021
The following provides responses to the items contained within Council’s RM20205358 Bushfire Vegetation Management Conditional Approval and pre-
lodgement advice dated 17 July 2021.
Requirement Action and update
RM20205358 Bushfire Vegetation Management Conditional Approval
1. Payment of an application fee of $187.00 and a bond of $643 to be Noted. We request that Council issue an invoice for payment identifying
made at our Customer Service Counter located at level 1, 9 Pelican the current applicable fees.
Street, Tewantin. Please note that return of the bond will be subject
to an inspection of the site after completion of works and the
inspection may take up to 10 working days from datecustomer
advises completion of the works.
2. Contractors that are engaged to undertake tree removal are required to TreeFix ABN 39019550176 has been engaged to undertake the works.
be trained to AQF Level 3 in Arboriculture or equivalent recognised and Please refer to the Arboriculture Qualifications attached as Attachment
with relevant experience. 3
3. Contractors must hold Public Liability Insurance in the sum of $20 million. Please refer TreeFix’s Work Cover and Liability Insurance attached as
Attachment 4.
4. A Dial Before You Dig must be obtained; this can be done A survey of the site has been undertaken to identify site services, please
online at https://www.1100.com.au/ and evidence provided refer to Attachment 5.
that the tree works will notinterfere with existing underground
services.
5. Residents who may be affected by the removal of the tree must be Noted. The site does not have any directly adjoining neighbours in the
notified of thework at least three days in advance. area that the works are to be undertaken.
6. All debris associated with the removal must be removed from the site. Noted. To be undertaken and confirmed post works.
7. Traffic and pedestrian access and management is the Noted. Given the location of the clearing external traffic and pedestrian
responsibility of thecontractor/client. management is not required
8. Work must be undertaken and completed within 28 days of receipt of The contractor is scheduled to undertake the works from the 9th to 13th
approval. May 2022.
9. If required, stumps must be ground to specifications. Noted. Will action where required.
Ethos Urban | 7190526
2
Page 7
Ozcare Noosa | April 2022
10. Applicant is to submit on behalf of the contractor WH&S Risk Please refer to Attachment 5 – Risk Assessment Form.
Assessment form,identifying hazards and relevant control
measures prior to commencement.
Council pre-lodgement advice 17 July 2021
a) Temporary Access: Council agrees to the use of Council’s land (Lot 1 on Noted. The retention of retention of Glossy Black Cockatoo feed trees,
SP239726) for temporary construction access, generally in accordance namely She-Oaks, have been identified on the survey (Attachment 1)
with the below subject to retention of glossy black feed trees. The
construction access route commences within the Ozcare land (Lot 9 on
RP 225312) carpark, it then makes its way to the Council land access path
via an existing driveway next to the existing shed (to be removed and
replaced with a refuse storage and collection area), access to the
development area is then available via the existing Council access
path. Construction access will be approved through the development
application process, no need to contact Council’s Property Team
separately.
Ethos Urban | 7190526
3
Page 8
Ozcare Noosa | April 2022
b) Application Pathway: Council’s preference is for a development application Ethos Urban advised Council of the intention to pursue a Minor Change
to be lodged over both the Ozcare land and Council land to accommodate approval pathway with accompanying Infrastructure Agreement on 9
the bushfire mitigation within the approval – this would require a Change December 2021, see Attachment 7 - Application Pathway &
‘Other’ Application to development approval 21675 DA dated 7 December Infrastructure Agreement Correspondence.
2005, due to the application applying to a new parcel of land (i.e. the
Council land). The Applicant should contact Denis Wallace (Property Ozcare is currently preparing an Infrastructure Agreement that will cover:
Advisor, Noosa Council, 5329 6239, [email protected]) to
a) Construction of the access track crossing, refer to Attachment 8 -
arrange the relevant consent to lodge the application over Council land.
Access trail crossing.
However, if there are any issues with the regional planning designation of Note: the construction of the access track crossing will occur after
Council’s land and the ability to lodge a development application, Council development approval has been granted but prior to the
will agree to the preparation of an Infrastructure Agreement, at Ozcare’s commencement of use. The design plan will be submitted with the
expense, that stipulates the requirements of the above – this would involve Infrastructure Agreement.
a Minor Change Application to development approval 21675 DA as there
would be no new land parcel added to the application, but would still need b) Maintenance of the access track (including crossing).
to confirm there are no new referral agencies and the proposal meets the c) Maintenance of the vegetation buffer zone along the north-eastern
test of a minor change. and south-eastern boundary of the Subject Site, refer to Attachment 1
- RM20205358 Bushfire Vegetation Management Conditional
Approval but retaining She-Oak Black Cockatoo feed trees as
identified on the survey (Attachment 5):
Ethos Urban | 7190526
4
Page 9
Ozcare Noosa | April 2022
i) north-eastern boundary: maximum total width of 20m comprising
15m as a Fire Access Trail / Fuel Free Zone width and 5m Fuel
Reduction Zone width.
ii) south-eastern boundary: maximum total width of 15m comprising a
15m Fuel Free Zone.
Note: the bushfire vegetation management works sought to be
authorised by the application will be undertaken prior to the lodgement
of a development application. An updated survey / aerial photograph of
the site post works will be included within the Infrastructure Agreement.
c) Bushfire Vegetation Management on Council land: Council agrees in The bushfire vegetation management works are proposed to be
principle to the use of Council land for bushfire vegetation maintenance, undertaken in accordance with Attachment 1 - RM20205358 Bushfire
maximum total width of 20m comprising 15m as a fire access trail width Vegetation Management Conditional Approval:
and 5m fuel reduction zone. The clearing of glossy black cockatoo feed
i) north-eastern boundary: maximum total width of 20m comprising 15m
trees should be avoided, see further details below. The attached
as a Fire Access Trail / Fuel Free Zone width and 5m Fuel Reduction
RM20205358 Bushfire Vegetation Management Conditional Approval
Zone width.
requires a further application to Council for approval to undertake the
clearing works prior to the development application being lodged to protect ii) south-eastern boundary: maximum total width of 15m comprising a
existing infrastructure and building works on site and people. 15m Fuel Free Zone.
Glossy Black Cockatoo feed trees, namely She-Oaks, will be retained as
Council’s endorsed Noosa Bushland Reserve Strategic Fire
management Plan permits a 20m wide area in Council’s land per the survey attached as Attachment 5.
comprising 15m as a fire access trail width and 5m fuel reduction zone
Note: the bushfire vegetation management works sought to be authorised
for the nursing home.
by the application will be undertaken prior to the lodgement of a
development application. An updated survey / aerial photograph of the
This means all vegetation is cleared within the 15m Fire Access Trail
site post works will be included within the Infrastructure Agreement.
or the Fuel Free Zone, then 5m Fuel Reduction Zone. Fuel Reduction
Zone requires understorey and mid-storey vegetation removed but
mature trees(those with stem diameter greater than 200mm) are Please refer to the access trail crossing design attached as Attachment
8.
retained, lower branches of mature trees in this zone should be lift
pruned (in accordance with AS 4973 - Pruning of Amenity Trees) to
Note: the construction of the access track crossing will occur after
2m above ground level to prevent fires moving from ground into tree
canopy. The below image provides some guidance for the Fuel development approval has been granted but prior to the commencement
Reduced/Reduction Zone: of use. The design plan will be submitted with the Infrastructure
Agreement.
Ethos Urban | 7190526
5
Page 10
Ozcare Noosa | April 2022
As stated in the FMP, Fire access trails need to be well formed
(natural surface) drained and works still need to achieve biodiversity
outcomes. For instance, further investigation by the applicant would
need to be conducted in the northern & southern sections with regards
to potential glossy black cockatoo feed trees and if deemed present
retained.
To properly aid emergency access, piped drainage from this
development currently hinders vehicle throughfare, see below aerial
image. It would be beneficial if this infrastructure was extended (or
removed altogether) to allow complete access.
Ethos Urban | 7190526
6
Page 11
Ozcare Noosa | April 2022
Further investigation though is needed at the south eastern and
northern corners and investigation of feed trees for glossy black
cockatoos – where feed trees exist, clearing should be avoided and
where necessary fire management mitigation measures should be
undertaken on the Ozcare site.
Ethos Urban | 7190526
7
Page 12
Ozcare Noosa | April 2022
We kindly request that Council issue the final Bushfire Vegetation Management approval and invoices for
payment of the applicable application fee and bond to enable the works to be undertaken from 9th to 13th May
2022.
If you have any questions or require additional information, please don’t hesitate to contact me.
Yours sincerely,
……………………………..
Ashley Everton
Associate Director
ETHOS URBAN
0423 74 1892
[email protected]
Ethos Urban | 7190526
8
Page 13
Officer Name: Michael Lyons
Officer Email: [email protected]
Phone No: 07 5329 6500
CRM No: RM2020/53583
7 October 2020
Anna Gorgijeski
66 River Terrace
Kangaroo Point QLD 4169
Dear Anna,
RE: Request for approval to remove vegetation for Fire Mitigation
Further to your request for approval to undertake work to remove specified vegetation to
20m along the North-eastern boundary and 15m along the south-eastern boundary, I am
advising the results of the inspection and assessment undertaken by council’s
Assessment Officer.
Approval for removal of the vegetation for fire mitigation will be granted, subject to
conditions, and upon receipt of further information and payment of an application fee and
a bond. Particulars contained in this letter are for your information only - this letter does
not grant approval.
The following conditions will be applied:
1. Payment of an application fee of $187.00 and a bond of $643 to be made at our
Customer Service Counter located at level 1, 9 Pelican Street, Tewantin. Please
note that return of the bond will be subject to an inspection of the site after
completion of works and the inspection may take up to 10 working days from date
customer advises completion of the works.
2. Contractors that are engaged to undertake tree removal are required to be trained to
AQF Level 3 in Arboriculture or equivalent recognised and with relevant experience.
3. Contractors must hold Public Liability Insurance in the sum of $20 million.
4. A Dial Before You Dig must be obtained; this can be done online at
https://www.1100.com.au/ and evidence provided that the tree works will not
interfere with existing underground services.
5. Residents who may be affected by the removal of the tree must be notified of the
work at least three days in advance.
6. All debris associated with the removal must be removed from the site.
7. Traffic and pedestrian access and management is the responsibility of the
contractor/client.
8. Work must be undertaken and completed within 28 days of receipt of approval.
9. If required, stumps must be ground to specifications.
10. Applicant is to submit on behalf of the contractor WH&S Risk Assessment form,
identifying hazards and relevant control measures prior to commencement.
Page 1|2
Page 14
To further your request, please complete and return to council:
• Payment of the application fee and bond required; and
Your application will be processed within 10 business days.
Please note – if your completed application form with payment of the application fee and
bond is not received within three (3) months of the date of this letter, your request will
lapse and be closed. If you require further time to complete your application, please
advise Council within the three month timeframe.
Should you wish to discuss this issue further, please do not hesitate to contact Council’s
Parks team at [email protected] Please quote RM2020/53583 for any future
communication regarding this matter.
Yours faithfully,
Michael Lyons
Environment and Sustainable Development
Technical Officer – Natural Areas I Noosa Council
Page 2|2
Page 15
Hanley Signata Pty Ltd ATF HANFORD TRUST t/as Tree Fix ABN: 39 019 550 176 veww.treefix.com.au Direct: 0439 724.013 Office:07 5446 8635 | Depot: 212 Wappa falls Ri Yandina 4 Depot: 22 Gerber Ri PRUNING | REPO <T re Depot: 413 Blacksnake R oad, as61 load, Widgee 4570 oad, Blacksnake 4600 Job Location RISK ASSESSMENT FORM Task Road Type | __ Traffic Vol NOTE: Each new site requires this risk assessment to be readdressed with all Teak & Bhurrip Local Road (LR) Very tow volume (VLV) site workers and any changes communicated. Paling tress/parts Mair Roads (MR) Low VowneytV] EWP/Crane Private Property High Volume (HV) Site: QPCARE OP Cooyar 4 Mica | hie work | Povee | VL STANDARD FIELD PRESTART CHECK LIST (if ‘No’ stop work) HES IINOD ae Has a Pre-start/Site briefing of work being carried out with all team member Are all Sub-contractors briefed on work being carried out IS THERE APPROPRIATE SUPERVISION provided for trainees Are Staff inducted to SWMS and the use of relevant equipment \s the worksite access restricted et ively to public vehicles and pedestrians: List Precautions taken? Apa Yen) + +barrier + traffic control ‘DeVou have the appropriate equipment to complete task and are all Crew and Sub-contractor’s: tools, rigging equipment and machinery in good order and prestart checked Do all Sub-Contractors and Team Members have the appropriate PPE Do Subcontractors have the appropriate insurances in place (Work Cover and Public Liability) Clear of protected Flora or fauna (list) or any DANGEROUS Flora or fauna present (list precautions) Spe Are there suitable First Aid, Rescue equipment, and trained rescue personal on site NANA SASS Control] Measures if control score result is higher than ‘LOW’ consult management Risk Score Before Controls A rectiei Hazard Risk Score After Controls Oo Work under traffic risk N/A O Signage- Traffic Controllers (Licence) Ke Pedestrian traffic risk work site defined to public & pedestrian spotter pa traffic volume changes (heview site traffic controls (top work pan M Lack of visibility - sind corners arricading, Bollards, Cones — 7 é ‘ 1 Exclusion Zone (Elec=3m Low V) Cable locater, DBYD, q Sprvices and electrical risk (A Dedicated SPOTTER, (approvals by Energex) e DW Lack of Road Shoulders, Soft ®Set up work site location that is suitable to equipment ran Edges, steep drop offs. and task needs Working at Height Pali protection, ladder security A [climbing and rigging gear checked Procedure Communicated Ground support 0 EWP/Crane needed Wee cutting at height WMS - Working safely with trees (the green book) Score L wh munication intention to drop material Cf Falling objects ‘Control material with rigging methods L Yr PSF] S| SS Manual Handling ¥nder 40kg -Mechanical Assistance or Team Lift ie silt traps & Spill kits « environment 1D Manage noise, dust and erosion a Rafarenyro.plan Ee Emergency / communication Evacuation & Assembly Point prepared Bignal Dial-000112 Ly & Outdoor work (Sunscreen, PPE, Shade, Rest, Water L Site Induction Record: the undersigned people have participated in the risk assessment process and agree to abide by all control measures for workplace health & safety. All persons to work safe and to there limits, at no time put themselves in harms way or knowingly endanger themselves or others . ALL Site Personal must sign below. NAME SIGNATURE DATE Document* 1 MAKE COMMENTS OF REVERSE SIDE OF THIS FORM. Is there comments on back of this form Yes / No Doc: Tree Fix Insurance Quote Form Reviewed by: Scott Hanley Review 1 March 2020-2021 Status: Released Document Location: QA System !SO 9001:2015 Page 1 of 2
Page 16
Diploma
rhis is lo cediry rhat Christopher Scott Hanley
0906750498
has lullilled the requirements for
Diploma ol Arboriculture
AHC50510
al the TAFE Oueensland East Coast
National Provider Number 0418
Documenl Number 51406513QD
Dated the Twenty-Ninth
day of October 2014
THE OUALIFICATION IS FECOGNISED wlTH THE AUSTBALIAN OUALIFICATIONS FRAiIIEWORK.
efr-t,/-
CEO, TAFE Queensland General Manager
Page 17
Record of Results
Christopher Scott Hanley
212 Wappa Falls Road
YANDINA QLD 4561
Christopher Scott Hanley
StudentNumber: 0906750498
AHC50510 Diploma ol Arboriculture
SCT - TAFE Ouoensland East Coast National Provider Number 0418
AHCPClVl60lA Develop and implement a planl health 20-Sep-2014 24-Ocl-2014 SCT J
management strategy
Award Details
0l -Jun-2007 RTF50103 Diploma ol Horticulture csr s0701640QD
26-Aug-2011 TAE40110 Certificate lV in Training and Assessmenl s110706804
05-Apr-2013 AHC30810 Certificate lll in Arboriculture GCT 51304144Q3
29-Oct-2014 AHC50510 Diploma of Alboriculture SCT 51406513Q0
CEO, TAFE Queensland Date 30-Oct-2014 Page 4
Page 18
Record of Results
Christopher Scott Hanley
212 Wappa Falls Road
YANDINA QLD 4561
Christopher Scott Hanley
StudentNumber: 0906750498
RTF50103 Diploma of Horticulture
CSI - TAFE Queensland East Coast National Provider Number 04'18
RTE5901A Develop a marketing plan 11-Nray-2006 30-Ap.2007 csr J
RTF5018A Assess trees 11-May-2006 30-Ap.2007 CSI J
WBBPM2B Recruil and select personnel 11'May-2006 30'Ap.-2007 CSI J
R1120209 Certilicate ll in Surface Exlraction Operations
SCT - TAFE Queensland Easl Coast National Provider Number 0418
RI|OHS2o4A Work safely at heights 12'Nov-20'12 15-Nov-2012 SCT J
TAE40110 Certiticale lv in Training and Assessmenl
SCT ' TAFE Queensland East Coast National Provider Number 0418
BSBLED4o'lA Develop leams and individuals 13-May-2011 25-Aug-2011 SCT J
RTC5801A Provide specialist advice to clients 23-Aug-2011 SCT T
TAEASS4o1A Plan assessment activities and processes 13-May-2011 25-Aug-2011 SCT J
TAEASS4o2A Assesscompetence 13-N,4ay-2011 25-Aug-2011
TAEASS4o3A Parlicipateinassessmentvalidation 13-May-2011 25-Aug-2011 SCT J
TAEDEL3oIA Provide work skill insiruciion 13-[,4ay-2011 25-Aug-2011 SCT J
TAEDEL4o1A Plan, organise and deliver group-based 13-[,4ay'2011 25-Aug-2011 SCT J
learning
'I-AEDEL402A Plan, organise and facililale loarning 13-[,4ay-2011 25-Aug-2011 SCT
jn the workplace
TAEDES4o1A Design and develop learning programs 13-May-2011 25-Aug-201'1 SCT J
TAEDES4o2A Use training packages and accrediled 23-May-2011 26"Aug-2011 SCT J
courses lo meei client needs
CEO, TAFE Queensland Date 30-Oct'2014 Page 2
Page 19
Record of Results
Christopher Scott Hanley
212 Wappa Falls Road
YANDINA OLD 4561
Christopher Scott Hanley
StudentNumber: 0906750498
AHC30810 Certificate lll in Arboricullure
GCT - TAFE Oueensland Gold Coast Nalional Provider Number 0083
AHCARB2O4A lJndertake standard climbing techniques '14-l\.4ar-2013 03-Apr-2013 GCT J
AHCARB3OlA lmplement a tree maintenance program 14-Mar-2013 03-Apr-2013 GCT J
AHCARB3O2A Conduct tree inspections 14-Mar2013 03-Apr-2013 GCT J
AHCARB3O3A lmplement a tree pruning program 14-Mar-2013 03-Apr-2013 GCT J
AHCARB3O4A Fell trees with advanced lechniques 14-Mar-2013 03-Apr-2013 GCT J
AHCARB3O5A Remove lrees in contined spaces 14-Mar-2013 03-Apr 2013 GCT J
AHCARB3O6A lJndertake aerial rescue 14'MaF2013 03-Apr2013 GCT J
AHCARB3OTA lJndertake complex tree climbing 14-Mar-2013 03-Apr-2013 GCT J
AHCARB3lOA Perform aerial rigging 14-Mar-2013 03-Apr-2013 GCT J
AHCARB5OlA Assess lrees 03-Apr-2013 GCT T
AHCPCT\,1303A ldentily plant specimens 14-Ma.2013 03-4pr2013 GCT J
cPccct\,42010A Work safely at heights 03-Apr-2013 GCT T
cPccoHS200lA Apply OHS requirements, policies and 14'Mar-2013 03-ApF2013 GCT J
procedures in the construction industry
FPtCOr2221B Trim and cross cut Jelled trees 14-Mar-20'13 03-Apr2013 GCT J
FPIFGM32O4A Fall lrees manually (intermediale) 14-N,4ar'2013 03-Apr-2013 GCT J
FPIFGM32O5A Fall lrees manually (advanced) 05-Apr-2013 GCT T
AHC50510 Diploma ol Arboriculture
SCT - TAFE Queensland Easl Coast National Provider Number 0418
AHCARB5OlA Assess trees 20-Sep'2014 24-Oc1'2014 SCT J
AHCAR8502A ldenlify, select and specify trees 20-Sep-2014 24-Oc12014 SCT J
AHCARB503A Diagnose lree diseases 20-Sep-2014 24-Oc12014 SCT J
AHCARB5O4A Develop a lree Proiection Program 20-Sep-2014 24-Ocl-2014 SCT J
AHCARB505A Document and audil tree work 20-Sep-2014 24-Oct2014 SCT J
AHCOHS5OlA Manage Occupaiional Heallh and Saiety 20-Sep-2014 24-Oct-2014 SCT J
(OHS) processes
CEO, TAFE Queensland Date 30-Oc12014 Page 3
Page 20
Record of Results
Christopher Scott Hanley
212 Wappa Falts Road
YANDINA OLD 4561
Christopher Scott Hanley
StudentNumber: 0906750498
n39 Certiticate lll in Horticullure
CSI - TAFE Queensland Easl Coast National Provider N!mber 0418
HOR109 Work sile preparation 11-[Iar-1998 23-Feb-1999 CSI J
HOR110 Occupational health and safety 1 1-N,4ar-1998 01-[.lar-1999 csl J
HOR119 Workplace orientation 11-Mar''l998 23-Feb-1999
HOR202 Ground support 11-NIar-1998 23-Feb-1999 CSI J
HOR203 Basic chainsaw operation '11-NIar-1998 23-Feb-1999 CSI J
HOR205 Basic tree climbing techniques '11-Nlarl998 23'Feb 1999 cst J
HOR217 Planting skills 11-N,4ar-1998 23-Feb-1999 CSI J
HOR225 Pruning and shaping 11-Mar-'l998 23-Feb-1999 csr J
HOR228 Smalllree removal 11-[,4ar-1998 23-Feb-1999cst J
HOR234 Weed trealment 11-Mar-1998 10-Llar-1999 cst Aw
HOR236 Workplace communication 11-[rar-1998 23-Feb'1999 cst J
HOR246 lntroduction to soils '11-Mar-1998 23-Feb-1999 cst J
HOFt251 lntroduction to planls 11-[rar-1998 23-Feb-1999 cst J
HOR302 Advanced lree removal 11-[rar-1998 23-Feb-1999 csr J
HOB314 Horlicultural workplace quality 11-Mar-1998 23-Feb-1999 CSI J
HOR353 Machinery and equipment mainlenance 11-Mar-1998 23-Feb-1999 csr J
RTF50'103 Diploma of Horticulture
CSI - TAFE Queensland East Coasl Nalional Provider Number 0418
BSBI\,,IGT6O9A Ivlanage risk 11-May-2006 30-Apr-2007 cst J
RTC5504A Develop a management plan for a 1'1-N,4ay-2006 30-Apr-2007 cst J
designated area
BTC5801A Provide specialist advice to clients 1 1-N,4ay-2006 30-Ap12007 CSI J
BTC5908A Prepare estimales, quoles and tenders 11-[,4ay-2006 30-Apr'2007 cst J
BTC59134 Collect and manage daia 11-Nray-2006 30-Apr'2007 cst J
RTC59144 Prepare reporls 11-[ray-2006 30-Apr-2007 CSI J
RTE58O74 Manage slaff 11-May-2006 30-Apr-2007 CSI J
CEO, TAFE Queensland Dale 30-Oc12014 Page
Page 21
(VET) Transcript
The records held in the National VET Provider Collection’ for training
undertaken from 1 January 2015 to 30 June 2018 show that
ASHLEY WAYNE TREBILCOCK
(Are your name details incorrect? Update your personal details)
@ Select all @)
Undertook the following nationally accredited VET
unit(s) and module(s):
Provider: TAFE QUEENSLAND EAST COAST (0418)
Select: 0
Unit/Module UNDERTAKE AERIAL RESCUE
(identifier - (FI (AHCARB306A) - (20)
Outcome RPL
Enrotinent Period = - 27/01/2016 - 21/03/2016
Select o
Unit/Module UNDERTAKE STANDARD
{identifies - (FI CLIMBING TECHNIQUES
(AHCARB204A) - (20)
Outcome RPL
Enrolment Penod 27/01/2016 - 21/03/2016
Page 22
_ Interlink Training | o— Professional Training Solutions aa ae - RTO No: 21055 | This és to certify that | Ashley Trebilcock Participant Number: 9459677 Has successfully fulfilled the requirements for: } AHC30816 Certificate Ill in Arboriculture a ——— a joa ae j [ore = Document ID: $489677-7904892 lana —= bssued: 26 July 2021 A = ABN 73.030 208 674 a J Nallouaaly Recoerati Phone: ae lve This quabfication is recognised within the Australian Qualification Framework
Page 23
1 Marve Mores Cnet tennis Offeae Interlink Professional Training Sotut This ts to certify that Benjamin Walker Participant Number: 9457676 Has successfully fulfilled the requirements for AHC30816 Certificate III in Arboriculture benued: 26 Juby 2021 Ale 73.010 906 674 Prone 1200 731 were Witertr’ edu ay —_—— ( I S Document IO: 9450676-790478) A | = [ies woaheatan 6 recaqrentd witen the Auirtrahan Qualification Farmewors
Page 24
we
Australian Government
Student Identifiers Registrar
Authenticated Vocational Education and Training (VET) Transcript
The records held in the National VET Provider Collection for training undertaken from 1 January 2015 show that
BENJAMIN ROBERT WALKER
Undertook the following nationally accredited VET unit(s) and module(s):
Provider: INTERLINK TRAINING (21055)
Unit/Module (Outcome
(identifier) - (F1")
PREPARE AND APPLY CHEMICALS cA
(AHCCHM303) - (21)
TRANSPORT AND STORE CHEMICALS a
(AHCCHIM304) - (21)
USE STANDARD CLIMBING TECHNIQUES TO ACCESS TREES
(AHCARB312) - (21)
WORKING SAFELY NEAR LIVE ELECTRICAL APPARATUS AS A NON- cA
ELECTRICAL WORKER
(UETTDREL144) - (22)
OPERATE A POLE SAW ca
(Fwecors238) - (13)
TRIM AND CUT FELLED TREES cy
(Fwecor2239) - (13)
COORDINATE WORK SITE ACTIVITIES “a
(AHCWRK305) - (11)
SHIFT MATERIALS SAFELY USING MANUAL HANDLING METHODS cA
{TuD1004) - (23)
Provider: BLUE DOG TRAINING PTY LTD (31193)
‘Unit/Module Outcome
(identifier) - (F1°)
WORK SAFELY IN THE CONSTRUCTION INDUSTRY cA
(CPCCOHS10024) - (20)
Provider: RE:VIVA FIRST AID & RESUSCITATION TRAINING PTY LTD (90176)
Unit/Module _ Outcome
(identifier) - (FI")
PROVIDE BASIC EMERGENCY LIFE SUPPORT cA
{HLTAIDOO2) - (20)
PROVIDE CARDIOPULMONARY RESUSCITATION cA
(HUTAIDOO4) - (20)
PROVIDE FIRST AID cA
{HLTAIDOO3) - (20)
Date Generated: 09 February 2021 4:12:58 PM
Times are shown in AET
Enrolment Period
15/08/2019-15/08/2019
18/03/2019-28/03/2019
21/02/2019-21/02/2019
26/10/2018-23/11/2018
26/10/2018-23/11/2018
31/08/2018-23/11/2018
31/08/2018-31/08/2018
Enrolment Period
(09/09/2017-11/09/2017
Enrolment Period
20/07/2016-20/07/2016
20/07/2016-20/07/2016
20/07/2016-20/07/2016
Page | 1of3
Page 25
Authenticated Vocational Education and Training Transcript of the records heid in the National VET Provider Collection from 1 January 2015 for BENJAMIN ROSERT WALKER 1s currently enrolied in the following nationally accredited VET unit(s) and module|s): Provider: INTERLINK TRAINING (21055) Unit/Module (identifier) - (Fi) FALL TREES MANUALLY (INTERMEDIATE) (FwPFGM212) - (11) INSPECT TREES FOR ACCESS AND WORK (AHCARB302) - (21) PERFORM PRUNING OPERATIONS (AHCARB303) - (21) IDENTIFY TREES (ArICARB313) - (11) PERFORM GROUND BASED RIGGING (ArICARB207) - (11) ‘THE, DRESS, SET AND FINISH ARBORIST KNOTS (@rICARB311) - (12) Date Generated: 09 February 2021 4-12-58 PM Times are shown in AET PERRET Page | 20f3
Page 26
Authenticated Vocstona! Education ard Training Tranccrpt
Of the record: heid in the National VET Provider Collection from 1 January 2015 for
BENJAMIN ROBERT WALKER
Disclaimer
‘This transcript has been compiled using information held by the National Centre for Vocational Education Research
{NCVER}. The information is collated from submissions to the NCVER by the registered training organisations (RTOs) where
the student was enrolled.
RTOs provide these submissions on either a quarterly or annual basis. This means that recently completed qualifications
may not appear on the transcript until the next submission period falls due. In respect of any such qualifications, the USI
holder should provide the testamur or statement of attainment issued by the RTO.
‘The Registrar does not warrant the completeness of information in this transcript. The Registrar will have no liability
{including in negligence) to any person for any loss, damage, cost or expense (including reasonable legal costs and
expenses) incurred or arising by reason of any person using or relying on this transcript.
For more information please visit www.usi govay and www never edu.au.
Explanatory Notes
cA Competency achieved
nyc Not yet Competent
w ‘Withdrawn/discontinued
RPL Recognition of prior learning granted
RPLN Recognition of prior learning not granted
a Credit transfer/national recognition
Cont Continuing enrolment
sc Non-assessable enrolment — satisfactorily completed
NC Non-assessable enrolment - withdrawn or not satisfactorily completed
NYE Not yet available
RTOC incomplete due to RTO closure
value Description - Funding Source
i Commonwealth and state general purpose recurrent
3 Commonwealth specific purpose programs
35 ‘State specific purpose programs
20 Domestic full fee-paying client
30 intemational full fee-paying client
20 Revenue earned from another training organisation
NR Not Reported
34 intemational onshore client - other revenue
32 intemational offshore client - other revenue
value Description - Enrolment Period
NR Not Reported
‘The National Centre for Vorations! Education Research (NCVER) holds the National VET Provider Collection which includes records
of reported nationally recognized VET qualifications and units/madules. Training organizations report training on either 2 quarterly
‘or annual bass. This means that recently completed qualification: may not sppesr on the tranzcript until the next reporting period.
* Fl Funding IGentifier indicates the cource of funding used to undertake the training.
Date Generated: 09 February 2021 4:12:58 PM Page |30f3
Times are shown in AET
Page 27
Certificate of Currency
Employer's information
Employer name Hanley Signata Pty Ltd
Trading name Tree Fix
ABN 39 019 550 176
ACN 150 279 799
Policy number WAD150466620
Insurance type Accident Insurance Policy
Statement of coverage
This certificate issued on 14 September 2021 is a Certificate of Currency, which provides cover under the Workers'
Compensation and Rehabilitation Act 2003 for:
(a) the employer's legal liability for compensation; and
(b) the employer's legal liability for damages.
The amount of insurance under the workers' compensation scheme is unlimited subject to the provisions of the
Workers' Compensation and Rehabilitation Act 2003 and the Workers' Compensation and Rehabilitation Regulation
2014 and the employer's compliance with their requirements. In some instances, non-compliance can jeopardise an
employer's insurance cover but will not prevent an injured worker from being compensated pursuant to the Act.
This Certificate of Currency is issued for the insurance period from 01 July 2021 to 30 June 2022.
This Certificate of Currency is current on the date of issue. The employer's insurance policy will remain current while
they continue to make premium instalment payments or premium is fully paid.
WorkCover industry classification
731338 - Tree Lopping & Arborist Services
For more information, please contact us on 1300 362 128 or visit our website at worksafe.qld.gov.au.
GPO Box 2459 Brisbane QLD 4001 - 280 Adelaide Street P: 1300 362 128 F: 1300 651 387 ABN: 40 577 162 756 worksafe.qld.gov.au 1
Page 28
631 Waverley Road
Glen Waverley Vic 3150
Tel: 03 8544 1600
Fax: 03 8544 1699
Email: [email protected]
Web: www.fitzpatrick.com.au
Certificate of Currency
Combined General & Products Liability Insurance
This Certificate:
• Is issued as a matter of information only and confers no rights upon the holder.
• Does not amend, extend or alter the coverage afforded by the Policy(ies) listed.
• Is only a summary of the cover provided.
• Reference must be made to the current Policy wording for full details
• Is current at the date of issue only.
This Certificate confirms that the undermentioned Policy is effective in accordance with the details shown:
Policy Number: 467029Q
Insured: Hanley Signata Pty Ltd ATF Hanford Trust T/as Tree Fix
Business Description: Tree Services
Period of Insurance: From: 02/03/2022 at 4pm local standard time
To: 02/03/2023 at 4pm local standard time
Limit of Indemnity: AUD $20,000,000 any one Occurrence in respect of public liability and in the
aggregate during the Period of Insurance in respect of products liability.
.
Fitzpatrick & Company Insurance Brokers Pty Ltd, Date Tuesday, 1 March 2022
as an agent of Liberty International Underwriters
Horticultural’s Programme Combined General & Products Liability Policy
Liberty Specialty Markets is a trading name of Liberty Mutual Insurance Company, Australia Branch (ABN 61 086 083 605)
incorporated in Massachusetts, USA (the liability of members is limited)
Page 29
OP 6°44’, 0:29
OPM (New Ref) 9
Septheenes ano RP225312 3
u. — Cen GIFP'1/4°46", 0-12
OIP (New Ref)
OPM (New Ref) DR AFT
COOYAR
Cor not searched (under water)
OIP not searched (under water)
LP 36
av O Nail in Cone footing
Dy 8 (2/RP 2253/2)
2 Se, —-3468°0, 0-02
Cen GIFP
320°25', O15
I3.Q
12 SEE MCH4469
SHEET 2
35
ONail in Cone footing on,
(3/RP225312) on 129°O%, 0-02
Cen GIFP 185°26', 0-05
Sheet | of
} 22 1412
OP 0:035, 0-04W
oIP > REFERENCE MARKS
STN TO ORIGIN BEARING | DIST
& / olp 7/RPB4533! | 38°48'05" | 1-0
3 3 olP E/RPB4533/ | 257°4805"| 1-0
BN g 5 O Screw in Kb 5/SP300412 | 210°0215" | 7-67
ly 6 O Nail in Kb 6/SP3004/2 | 226°36’ | 6-636 | (New Ref)
OP Renwd 7 O Nail in Kb /O0/0P276620 | 238°45'50" | 6-315 |(N&C)
ly pe N 8 O Screw inkb | 9/0P276620 | 55°57'40" | 028 | (N&O)
Oe 2 8 O Screw in Kb 8/SP300412 | 236°28 | 568 | (New Ref)
RR J 10 Nail in Kb 270°37'30" | 10-074
13 O Screw inkb —_|/5/0P276620 | 281°12'30" | 11-396 | (New Ref)
WY /4 OIP /5b/RP176150 | 199°00'15” | /-0
(7 aIP /O/RPI8I8. 307°12’ | 0-965 | (New Ref)
17 Nail in Cone x 319°38°20" | 13-829
Qo 20 OlP 358°00'20"| 2-0
Sem? 2/ OIP 12 | 286°35’ | O21 | (New Ref)
& one 2/ |O Screw in Cone Ha 0540 | 274°44' 1292 | (New Ref)
Ba). oak 22 orp RP2I7617 | 272°0" | 10
Tg\S 22 Screw in Kb 284°23'25" | 17-03
N3|° 25 O Spike in Bit M/SP300412 | 58°55'10" | 2-445
~R te, 26 OP 7/RP1BIB35 | 64°55/15" | 1-0
S 28 OIP 9/RP 181835 | 126°40'30"| 1-0
Lp 30 oIP 4/RP225312 | 71°37/10" | 1-0
3/ OIP 318200540 | 126°22'25" | 0-995
lp 32 OIP S/SP15860 | 30/44’ | [335
op 35 OIP 8/SP115860 | 266°0I'30"| 0-8/
OIp LP 36 | OIP (not searched -— | 9/SPI/S860 | 39°52'30” | 0-795
}20 under water)
nv
ae |S
| a ©
X a OP 14°0’, 0-24
als is, LP OP '15°0’, 0-08 Remvd
2
SPI6I94I
No 0 Mk,
en GIF}
> 65°30', 0-08
OIP
Es ° 1
Cc 2y2037'25"
OR ae gee OOS = SP239726
>
OP Leang 50°38’, 0:06
O Spike
op sees oes Lease P
Wail (New Rep) ®X 2° 7-002 SP3I004I2 or ey Report, See Sheet 2.
mer ‘310°4 2,
= 48°05"
No O Mk No O Mk °5", 15.074
OScrew 4 Oo, 33505, Sos" PERMANENT MARKS
3 No OMk, OP »2003 PM ORIGIN BEARING DIST NO TYPE
press #5505" //—-OPM (not searched) /4/DP276620 | 265°00'30"| 156-6 78207
"5-004 /7-OPM \/0P276620 | 33/°05'05"| 5/76 78213 (New Ref)
20 /8-OPM 2/SPI97S75 | 307°22/10"| 33-544 7BAID (New Ref)
RP845331 aX
-» Scale 1:1500
oN
SP239726 > Om 50 100 150 200 250
0 ! ! ! 1 50}mm L i {100 |mm i i |__150 [mm
B.B.H. PTY. LTD. (ACN 010 427 531) (trading as Bennett and CLIENT
Bennett Group) hereby certify that the land comprised in this plan PO Box 5021, GCMC QLD 9726 ETHOS URBAN
was surveyed by the corporation, by Majella Therese Barnes, Ph: (07) 5631 8000 | [email protected] B E N N ET T + Locality
Surveying Graduate, for whose work the corporation accepts Surveying, Town Planning & Spatial Services NOOSA HEADS
tesponsibility, under the supervision of Stephen Paul Pedwell, www.bennettandbennett.com.au BE N N ETT Local Auth
Cadastral Surveyor, and that the plan is accurate, that the said . a . NOOSA SHIRE COUNCIL
survey was performed in accordance with the Survey and Mapping
Infrastructure Act 2003 and Surveyors Act 2003 and associated Map Ref Scale
Regulations and Standards and that the said survey was completed 9545-33142 1:1500
on 4/4/2022. Drawn Plan No.
sg: . ARS 200070_002_IDENT
Identification Survey Plan a
bir of Part of Lot 1 on SP239726 DRAFT
ecto 1S303880
ot eR SEAA SunDySS aN zs resSLEIESCSING Meridian Orig Por,
Date RP176150 Por 1653
Page 30
a
Sheet | of
Survey Report
Stations 7, 14, 20 & 22 are fixed by original marks and measure in general agreement with RP176147 (1980) and
RP176150 (1980) which surveyed most of the road frontage boundaries of Cooyar Street and Langura Street as one survey.
Stations 1, 3, 5 & 7 are fixed by original marks and measure in general agreement with RP845331. Station 2 is reinstated by
proportion of excess to RP845331 between Stations 1 & 3. Station 4 is reinstated by proportion of excess to RP845331
between Stations 3 & 5. Station 6 is reinstated by proportion of excess to RP845331 between Stations 5 & 7.
Stations 9 — 13 are reinstated original dimensions per RP176150 between Stations 7 & 14. Stations 7, §e23 & 24 are fixed
by original marks and measure in general agreement with DP276620. Stations 15 — 19 are reinst \ dimensions
per RP176150 between Stations 14 & 20. Station 21 is reinstated deed distance per ree BS Stations 20 & 22,
Stations 30 — 32 & 35 are fixed by original marks and measure in general agreement with deed. Station 34 is reinstated
deed distance from Station 30. Station 33 is reinstated deed distance from Station 34 and parallel with Line 30 — 31. It also
maintains the 20m wide corridor in relation to Station 31. Station 36 is under water and therefore not searched. It has been
shown deed dimension from Station 35.
Stations 25 — 29 are fixed by original marks. Stations 7, 27 & 30 maintain their deed distance between them. Stations 28 &
29 measure original distance per DP276620, but 0.025m excess to Station 17 which is due to the reinstatement of Cooyar
Street. Stations 6, 25 & 26 measure in general agreement with SP300412. Station 26 to Station 27 measures 0.068m
shortage to deed and Station 8 to Station 27 measures 0.027m shortage to deed.
A
OlP
4
ti
R
G
Qe Bese
5
S
CG
127
MCH4469
No O Mk
0S
$2.78
.2 @!” O Screw in Kb (N &C)
7 : (8/0P276620)
No O Mk i a p
: ean 50°15'10”
{ LG 553
O Screw in Kb 7 23
(9/0P276620) 8 O Screw in Kb (N&C)
O-OINW, O-O/NE (0P276620)
O Screw (N &C)
O Screw (New Ref) 7
\
NW Cor Br 128
I-565E, 0-38NE
ONail (N & C) MCH4469
+
Scale 1:500
DRAFT
Fe ee
Om 5 10 15
20-25 «= 30's 35—s—is—“‘i‘aKG‘SSCSCi‘iG‘_ OSsS“‘<«i~iRSCiH_SSC‘aOSSCS
100 |mm__| \ | L__150 |mm
IS303880
50/mm i Il |
200070_002_IDENT