Original source · versioned page text
Attachment 4 - Bushfire management vegetation clearing approval
Hanley Signata Pty Ltd ATF HANFORD TRUST t/as Tree Fix ABN: 39 019 550 176 veww.treefix.com.au Direct: 0439 724.013 Office:07 5446 8635 | Depot: 212 Wappa falls Ri Yandina 4 Depot: 22 Gerber Ri PRUNING | REPO <T re Depot: 413 Blacksnake R oad, as61 load, Widgee 4570 oad, Blacksnake 4600 Job Location RISK ASSESSMENT FORM Task Road Type | __ Traffic Vol NOTE: Each new site requires this risk assessment to be readdressed with all Teak & Bhurrip Local Road (LR) Very tow volume (VLV) site workers and any changes communicated. Paling tress/parts Mair Roads (MR) Low VowneytV] EWP/Crane Private Property High Volume (HV) Site: QPCARE OP Cooyar 4 Mica | hie work | Povee | VL STANDARD FIELD PRESTART CHECK LIST (if ‘No’ stop work) HES IINOD ae Has a Pre-start/Site briefing of work being carried out with all team member Are all Sub-contractors briefed on work being carried out IS THERE APPROPRIATE SUPERVISION provided for trainees Are Staff inducted to SWMS and the use of relevant equipment \s the worksite access restricted et ively to public vehicles and pedestrians: List Precautions taken? Apa Yen) + +barrier + traffic control ‘DeVou have the appropriate equipment to complete task and are all Crew and Sub-contractor’s: tools, rigging equipment and machinery in good order and prestart checked Do all Sub-Contractors and Team Members have the appropriate PPE Do Subcontractors have the appropriate insurances in place (Work Cover and Public Liability) Clear of protected Flora or fauna (list) or any DANGEROUS Flora or fauna present (list precautions) Spe Are there suitable First Aid, Rescue equipment, and trained rescue personal on site NANA SASS Control] Measures if control score result is higher than ‘LOW’ consult management Risk Score Before Controls A rectiei Hazard Risk Score After Controls Oo Work under traffic risk N/A O Signage- Traffic Controllers (Licence) Ke Pedestrian traffic risk work site defined to public & pedestrian spotter pa traffic volume changes (heview site traffic controls (top work pan M Lack of visibility - sind corners arricading, Bollards, Cones — 7 é ‘ 1 Exclusion Zone (Elec=3m Low V) Cable locater, DBYD, q Sprvices and electrical risk (A Dedicated SPOTTER, (approvals by Energex) e DW Lack of Road Shoulders, Soft ®Set up work site location that is suitable to equipment ran Edges, steep drop offs. and task needs Working at Height Pali protection, ladder security A [climbing and rigging gear checked Procedure Communicated Ground support 0 EWP/Crane needed Wee cutting at height WMS - Working safely with trees (the green book) Score L wh munication intention to drop material Cf Falling objects ‘Control material with rigging methods L Yr PSF] S| SS Manual Handling ¥nder 40kg -Mechanical Assistance or Team Lift ie silt traps & Spill kits « environment 1D Manage noise, dust and erosion a Rafarenyro.plan Ee Emergency / communication Evacuation & Assembly Point prepared Bignal Dial-000112 Ly & Outdoor work (Sunscreen, PPE, Shade, Rest, Water L Site Induction Record: the undersigned people have participated in the risk assessment process and agree to abide by all control measures for workplace health & safety. All persons to work safe and to there limits, at no time put themselves in harms way or knowingly endanger themselves or others . ALL Site Personal must sign below. NAME SIGNATURE DATE Document* 1 MAKE COMMENTS OF REVERSE SIDE OF THIS FORM. Is there comments on back of this form Yes / No Doc: Tree Fix Insurance Quote Form Reviewed by: Scott Hanley Review 1 March 2020-2021 Status: Released Document Location: QA System !SO 9001:2015 Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original