Skip to the record
Every meeting, every word.

Original source · versioned page text

Attachment 4 - Bushfire management vegetation clearing approval

of 30

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

 

a

 

Sheet | of

 

 

 

Survey Report
Stations 7, 14, 20 & 22 are fixed by original marks and measure in general agreement with RP176147 (1980) and

RP176150 (1980) which surveyed most of the road frontage boundaries of Cooyar Street and Langura Street as one survey.
Stations 1, 3, 5 & 7 are fixed by original marks and measure in general agreement with RP845331. Station 2 is reinstated by
proportion of excess to RP845331 between Stations 1 & 3. Station 4 is reinstated by proportion of excess to RP845331
between Stations 3 & 5. Station 6 is reinstated by proportion of excess to RP845331 between Stations 5 & 7.

Stations 9 — 13 are reinstated original dimensions per RP176150 between Stations 7 & 14. Stations 7, §e23 & 24 are fixed
by original marks and measure in general agreement with DP276620. Stations 15 — 19 are reinst \ dimensions
per RP176150 between Stations 14 & 20. Station 21 is reinstated deed distance per ree BS Stations 20 & 22,
Stations 30 — 32 & 35 are fixed by original marks and measure in general agreement with deed. Station 34 is reinstated
deed distance from Station 30. Station 33 is reinstated deed distance from Station 34 and parallel with Line 30 — 31. It also
maintains the 20m wide corridor in relation to Station 31. Station 36 is under water and therefore not searched. It has been
shown deed dimension from Station 35.

Stations 25 — 29 are fixed by original marks. Stations 7, 27 & 30 maintain their deed distance between them. Stations 28 &
29 measure original distance per DP276620, but 0.025m excess to Station 17 which is due to the reinstatement of Cooyar
Street. Stations 6, 25 & 26 measure in general agreement with SP300412. Station 26 to Station 27 measures 0.068m
shortage to deed and Station 8 to Station 27 measures 0.027m shortage to deed.

A

   
   
  
 
   
   
  

OlP
4

ti
R
G
Qe Bese
5
S
CG

127
MCH4469

No O Mk

0S

$2.78
.2 @!” O Screw in Kb (N &C)
7 : (8/0P276620)

   
  

No O Mk i a p
: ean 50°15'10”
{ LG 553
O Screw in Kb 7 23
(9/0P276620) 8 O Screw in Kb (N&C)
O-OINW, O-O/NE (0P276620)
O Screw (N &C)
O Screw (New Ref) 7
\
NW Cor Br 128
I-565E, 0-38NE
ONail (N & C) MCH4469
+

Scale 1:500

DRAFT

 

Fe ee

Om 5 10 15

 

 

20-25 «= 30's 35—s—is—“‘i‘aKG‘SSCSCi‘iG‘_ OSsS“‘<«i~iRSCiH_SSC‘aOSSCS
100 |mm__| \ | L__150 |mm

IS303880

 

50/mm i Il |

200070_002_IDENT

 

 
Log in to download the original file

Attachment 4 - Bushfire management vegetation clearing approval.pdf · 1.9 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.