Original source · versioned page text
16-003302-3000(A)
From the archive 16-003302- Proposed Stage 3 Plans.zip, inside Operational Works Application OPW16/0345. File date in the archive: 2016-12-23 11:13.
DocuSign Envelope ID: 69D49415-881C-4D35-BC9B-DE8DA1B3BB93
PALM LAKE RESORT
19 TRADING POST ROAD, COOROY
STAGE 3 - FOR APPROVAL
FOR PALM LAKE WORKS PTY LTD
DRAWING INDEX CONSTRUCTION HOLD POINT
GENERAL ONCE THE BASE OF MANHOLES, INSPECTION PITS, GULLIES AND
3100 COVER SHEET FIELD INLETS FOR STORMWATER DRAINAGE AND SEWER
RETICULATION HAVE BEEN POURED, FURTHER CONSTRUCTION
3101 LEGEND
SHALL NOT PROCEED UNTIL THE SUPERINTENDENT AND OR
3102 GENERAL NOTES ENGINEER HAVE INSPECTED THE WORKS FOR FINISHED LEVELS
PROJECT BULK EARTHWORKS
3200 BULK EARTHWORKS LAYOUT PLAN
AND APPROVED CONSTRUCTION TO CONTINUE.
3201 BULK EARTHWORKS SECTIONS
SITE 3202 RETAINING WALLS TYPICAL DETAILS
EL
3203 EROSION AND SEDIMENT CONTROL LAYOUT PLAN
M
3204 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
ST
CONSTRUCTION NOTE
RE
ROADWORKS AND DRAINAGE
THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH:
E
3300 SURVEY SETOUT LAYOUT PLAN
T(
· LANDSCAPE ARCHITECTS PLANS - TBA
3301 ROADWORKS AND DRAINAGE LAYOUT PLAN
CO
· STORMWATER QUALITY MANAGEMENT REPORT
l
TP
3302 LONGITUDINAL SECTION & DETAILS SHEET 1 OF 2 · SEDIMENT AND EROSION HAZARD ASSESSMENT
ORE
3303 LONGITUDINAL SECTION & DETAILS SHEET 2 OF 2
PEC
· GEOTECHNICAL REPORT
YC
3304 INTERSECTION DETAILS AND CARPARKING SETOUT · ELECTRICAL CONSULTANTS PLANS
OS
MA
TR
D
ON
3305 STORMWATER DRAINAGE CATCHMENT LAYOUT PLAN
OA
RA
PR
AD
NE
3306 STORMWATER DRAINAGE LONGITUDINAL SECTIONS
R
SR
IN
CT
A
3307 STORMWATER DRAINAGE STRUCTURE DETAILS
GP
ST
ON
IO
3308 STORMWATER DRAINAGE CALCULATIONS TABLE
RE
NR
OS
RS
SEWERAGE
ET
CONSTRUCTION HOLD POINT
OA
TR
3500 SANITARY SERVICES SITE PLAN
PEA
PRIOR TO CONSTRUCTION THE CONTRACTOR
D
OA
3501 SANITARY SERVICES LONGITUDINAL SECTIONS
)
SHALL VERIFY LEVELS OF ALL EXISTING
D
WATER
CROSSINGS AND CONNECTION POINTS.
LOCALITY PLAN 3600 WATER SUPPLY NOTES AND DETAILS
N.T.S 3601 WATER SUPPLY LAYOUT PLAN
FILE: H:\16\003302 - PALM LAKES BALANCE STAGES\6_MODEL\AUTOCAD\3100 COVER SHEET.DWG LAST SAVED BY:HUNG TRAN
STORMWATER QUALITY
3700 STORMWATER QUALITY NOTES & DETAILS
NOOSA COUNCIL DATUM LEVEL: 1 DATUM LEVEL: 2 3701 BIOPOD LAYOUT PLAN
No. OF LOTS = 5 P.M. 24974 P.M. 107072
AREA OF SITE = 0.94ha RL 110.614 AHD RL 109.477 AHD
RP DESCRIPTION
PART OF LOT 102 ON SP287641
PARISH OF TEWANTIN
COUNTY OF MARCH
PALM LAKE RESORT
STAGE 3
Project No.: Stage: Milestone: Revision Date.: Drawing No.: Revision:
16-003302 3 APPROVAL 21.12.16 3100 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.