2205-28613 SRA - Response with conditions (MCU220070)(OPW220116)
Attached to the e-mail 2205-28613 SRA application correspondence - Referral agency response – with conditions - 21 Witta Circle, Noosa Heads.
Attached to the e-mail MCU22/070 & OPW22/0116 - 21 Witta Circle, Noosa Heads.
2205-28613 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. Conditions Condition timing
Development permit for operational work
Schedule 10, Part 17, Division 3 Table 1, Item 1 – Tidal works or works within a coastal management
district — The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Environment and Science to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
1. The construction of the pontoon must be undertaken generally in For the duration of
accordance with the following plans: works and to be
maintained.
Site Plan, Layout Plan & Water Allocation prepared by The Jetty
Specialist dated 25/01/2022, reference JSP-SJ-35810, revision
A.
Elevation prepared by The Jetty Specialist dated 25/01/2022,
reference JSP-SJ-35811, revision A.
2. The works to which this approval relates are to be for a private At all times.
purpose only.
3. Any operator and contractor involved in the works to which this During construction.
approval relates must:
a) be provided a copy of these referral agency conditions
b) install all measures, plant and equipment necessary to ensure
compliance with the conditions of this approval
c) maintain such measures, plant and equipment in a proper and
efficient condition
d) operate such measures, plant and equipment in a proper and
efficient manner.
4. For the proposed works only use materials which are free from During construction.
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
5. Should the works become damaged as a result of erosion, flooding At all times.
or storm tide inundation, the registered landowner(s) of the subject
land shall be responsible for the removal of all debris at their own
expense
Schedule 10, Part 17, Division 3 Table 2, Item 1 – Tidal works or works within a coastal management
district — The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
6. The development must be carried out generally in accordance with At all times.
the following plan:
Site Plan, Layout Plan & Water Allocation prepared by the Jetty
Specialist dated 25/01/2022, reference JSP-SJ-35810, revision A
7. The structure must be lit/marked in accordance with the following At all times.
specifications, such that it does not cause a risk to the safe
navigation of other ships:
State Assessment and Referral Agency Page 3 of 8