07/1815 - Preliminary building works assessable against planning scheme [As Published] · 172007.1815
Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
Form : 1PartaA "
1.1.1 Ensure that the form is fully compieted.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 lf there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form’ Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [7]
1.1.2.1 Ensure that each of Forms B-O which are attached are ee completed.
34 Ensure that Part G is completed if EPA referral is . required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and and recorded on the n the application
41 "Ensure that items 1 28 have been checked and/or completed including information regarding
applicant details and owners consent.
51 ‘Ensure that at feast 6 sets of the Plan of Development (5 for Reconfiguration and Operationat 3
Works) accompanies the application. In addition ensure that each set is complete. ,
§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is |
unbound.
Ensure that at least 6 copies of any report accompanies the spolication (5 ‘stor Reconfiguration 7
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of freper's ensure that 1 of the copies is in an A3 or Ad format and is unbound.
7 Ensure that ‘the application fee, as determined from the Councll’s ‘adopted scale of fees, ow
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form. . , |
Receiving Officer... aS vee Dome
Having completed this form and accepted the anfSeation please deliver both to the following !DAS Application Receiving
trays:-
* If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.
« — {fthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
e Inalt other circumstances — AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and OO NOT deliver the application to Records,
8
Pag i
SEP! g:\ant\orms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 24 pages
Page 2
INTEGRATED reas ACT 1997
2007 /1 315
~ Part E, Version 2.1, 18 June 2007
Po peratona 8/or building work 3 Woe.
assessable against a local government’s planning scheme
g
*
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work andlor building work assessable
against.a focal govemiment's planning scheme (including detailed engineering plans end other plans, detailed engineering plans for subdivisional works and conceptual
design plans for engineering & bulking work when the epplicstion does not involve assessinent of a material change of use of premises at the same time).
Nature of the works
The types of work that are assessable against|
a planning scheme are determined by the
-Scheme for a particular local goverment and
+will vary across the State,
: To determine the types of work that are
assessable under a particular planning
scheme, contact the relevant local
‘ goverment. ~
The information in Q2 is necessary for
1.
The a plication i is seeking approval of (tick one (1) or both if applicable):
Building work assessable against a planning scheme - provide detais of the aspects of building
work (@.9, building height greater than 8.5m; building work on high landslip risk area)”
(BUC Bing: OT é6e2' DECK
(2 Operational work assessable against a planning scheme - provide details of the nature of the
operational work (8.9. roadworks; landscaping; drainage works; stormwater; water infrastructure; sewerage
infrastructure; earthworks; clearing vegetation; signage) :
Le |
* Stastical and planning purposes. 2. _|s the application for operational work involving the creation of new lots?
‘ [Ko - [1] YES - specify number of new lots to be created below
3. -Does the proposal involve the construction of a canal that is associated with reconfiguring a tot?
mx. Cives
__ Nature of the application 4. This application i is for (tick one (1) or both if applicable) .
_ A development penmit authorises
development 2 aa, nee seni oO Preliminary approval - provide deta of the type of work eg. roadwork, stormwater, water and sewerage
: applicabley
«Pil to issuing’a development péimit forthe
. Works, the assessment manager is required
" by law to “sigh an approved form, issued by
, Qleave, which signifies that the PLSL levy
sha been paid. :
‘For further information refer to
. tila leave ald gov
(Bide OF _71Bee DER
.1 Are the’works subsequent toa previous development permit or preliminary approval?
[ebevelopment permit - provide details of the type of work eg roadwork, stormwater, water end sewerage
infrastructure, etc :
a
NO —_L) YES = provide detais of ail previous approvals .
.g_. Ust of approval referencels ... «Date. approved sos. °.[, - 3s Date approval tapses
: A i of I
‘Is payment of a Portable Long Service Leave (PLSt) levy applicable to the proposal?
DYES - complete a7
1 - Q7, 8 & 9.do not apply
Has the PLSL levy been paid?
(1 YES - complete 08
CINO- ~ ie pays po bk dvtmert ent canbe pnb was
How much was paid? - oo, . .
What is the receipt number of the payment?
Page 3
“} t ' 4 . INTEGRATED PLANNING ACT 1997 - : : Part E, Version 2.1, 18 June 2007, ° . PLEASE NOTE. Be , Wd This application cannot be accepted unless accompanied by Part A.of Form 1. me assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide-all applicable information so requested by Part A and any other relevant t par of Form 1. OFFICE USE ONLY (applicable to assessment manager) * ‘TINO, Ci yes- complete Q( s (i) Has the approved form (issued by Qheave and which sigtiies that the PLSL levy has been paid) been sighted by! the assessment "| manager / private certifier at the time of lodgement of this application? aa ‘No .. oe Cves- = rove recep dees a is aPLSL levy applicable i in this instance? | “+ Sr yy tee NY MA: ae a ae tc ae
Page 4
- If telephoning or calling-please-ask.for:_ —. ~ IBSTever SA | Dana J McKenzie, 07 5449 5260 , Email: dmckenzie@noosa. qid.gov.au % COUNCIL Application Ref: 2007/1815 Your Ref: 12 September 2007 Anglican Church Of Australia 1 Rectory Street POMONA QLD 4568 Dear Sir/Madam, ’ Re: Application for Alternative Siting Provisions - Deck situated at 24 Orchard Avenue BOREEN POINT described as LOT: 83 RP: 59216 | refer to the above application for a Alternative Siting Provisions - Deck and wish to advise that following preliminary examination of the plans, the following information is required to be submitted:- 4 1. IDAS Form E has not been submitted. Please complete the enclosed form and submit at your earliest convenience in order-. that assessment of your application can commence. Should you have any further queries in relation to the above, please do not hesitate to © contact Dana McKenzie on the above number. Yours faithfully Dana McKenzie ADMINISTRATION — BUILDING SERVICES Award Wi - Australian Cl Beach ; ey en 00d t inten pe ~6=—)d NOOSA COUNCIL aneraeasia 4 Challenge 2004 Litter Prevention 9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565 . Phone: 07 5449 5200 Fax: 07 5447 1062 Email: [email protected]
Page 5
INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
+ The completion of all applicable questions on Part A Is mandatory for all applications: Part A must be accompanied by the completed IDAS Assessment Checklist if. °
ae required, and by one (1) or mor other competed parts of fe rorm as euros. Fot more information on thé parts of the Form refer to www.ipd.aid.gov.au. va
"Any information requested in the form may be provided in an attachment to the appication. For furthér information about covtipteting the following details, refer to Guide 4,
} Description of land
Alliand the subject of the application, must be
identified. However, 3 description of the land is not
' fequired in retation to a mobile or
| advica for completing Q3 - Most land canbe
[identified by a lot on plan description. These details
i can be obtained from tide documenis or through the
Focal government.
However, if the land on which the developments
"proposed does not have a lot on plan description (i.e.
the development is proposed in a water body or
watercourse) provide -
# (i) “the fot on plan description for the
js. adjoining/adjacent land; or
{(G) GPS coordinates where there is no
‘ _ adjoining/adjacent land (eg. in Moreton Bay).
Advice - Q7 does: not apply if the
development is within a water body or watercourse.
"Advice for completing Q8 - 8 applies i
development is within a local government area.
Nota: Areas below high water mark are pot within a
Jocal government's area unless provided for under the
“¢locat Goverment Act 1993.
letin: + 9 applies if
ee ett a stetegk -
;ort land tidal area. For more details refer to Guide 4 4
bE
1.
Environmentally Relevant Activity (ERA). 2.
Advice for completing Q2- Q2 applies : |
' development is proposed within a water body or I
\ watecourse. 3.
Street address: fnetudinghouse number, street name,” suburbVlocelity name & postcode) (if applicable) 2”
[24 ORCHALD AVE, BOREV Pon/T 4¥SES::
Name of water body of watercourse, within- which: the develapment i is proposed: (fappicabe)
—y
=
Lot on-plan description (eg. Lot 123 on RP 4567) / GPS. coordinates: _
kLoT 3 on7RPS2916.
The
ve description i is for: (tick applicable box)
(i) the land‘on which the development is ‘proposed; or
“proposed; or
Dili) the water body or watercourse.
“Shop / tenancy number:
6. Storey /level:
+ oO (ii) the land ‘adjoining, the water body or watercourse, within which the development is”
7. Total area of land: (m? or ha):
|
-[Q0S06H ‘|
. Local government area in which the land‘ is situated: (ea: Esk, Hervey Bay, y Woocon $i: if applicable)
LACOSA
ope
Port authority for the strategic port larid or strategic port land’
development is proposed:
[23
id of strategic port onwhidh'the “<.
(eg. Port of Brisbane, a ne PRECEWES
.
‘8
7
; Proposal details
10.
Existing use of the land: (eg. vacant sirigé house, shop eta) *. it 4
-—oFeane
t cuUF
HOOSASiiRe CODHCIL
+ formation provided is corect. The assessment
M ilanager, any referral agency & the Chief Executive , 11
Lu RECTORY SE Ponront A
‘Signature:
{(where applicable) will refy on this informafion when
{ Bisessing and deciding the application. .
‘ilthe applicant ie a company - a contact person *
East be shown.
}
¥
‘
- 418.°
Hea ein um lta as mayb | | CHURCH - - ie FRONT COUNTED ay
f . ‘11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot resident s 1, ERA for equacuftute in
ponds with a total area of 7 ha for which wastes are released into waters etc}. Lory: - \ ne
H - | [Gaur ces | “W/o |
FOther applicable parts of Form 4 12. Other parts of Form 1 completed as part of this application: (eg: Part D, Part I. etc)
Part A must sheays ied by other LI EC.
i pleted parts of yrs 1 For ifooneton about | Peper E- |
@ part of Form 1 may apply refer to Guide 1, . . e . = .
plicant details |13. Applicants name: . Lo 5. Contact person: | SO
[arcncalpeeteceetecs | “ANGLICAN CHURCH OF, ASA [eve Woo cee
When signing and lodatng this appfication '|14: Contact number, = 16. Facsimite number/e-inail address:
eThe applicant is responsible for ensuring the
{07 SASS 121E |
Postal address:
patool vier @) bi igpond ne
“4 SeF
19. Date:
a
[Ey 2007
Ape
110907_mbiltings_154132_001.tif
io re
Page 6
4)
INTEGRATED PLANNING ACT 1997
Land owner's ‘consent: (i applicable)
| Section 3.2.1(3) ofthe [PA prescribes tial an .
‘pplication must contain, of be supported by, the
involves: :
Li). material change of use,
(I) -reconfiguration of a lot
fii) work of land below high-water mark & nit within a
"| canal as defined under the Coastal Protection and
Management Act 1995,0r
‘IN) work on fall corridor land defined under the
Transport Infrastructure Act 1994...
* Section 3.8,1(2){a) of the IPA provides that
; landowner's consent is pot required for a moblig or
temporary ERA
For tore information refer ta Guide 1.
-aniten consent ofthe tand owners, {the epogaion te
Name
| qy “2 Conromron ax The
2-2 SSTMOO OF fet DUBE oF
ONS BANE
IST Seetepmmcngte oe NER mR oe
~
E (v)
F Resource entitlement (if applicable) 21. Does this application involve a State resolirce prescribed under a regulation
Section 3.2.1(5) of the IPA requires evidence of yn on State coastal land. under the Coastal. Protection and Menagement Act 1998) .
| resource entitement be given for applications that :
involve a prescribed State resburce. NO -goto.Q24 Oo YES =;
pees tiranehde PArrescrbes at an 22. This application is accompanied ‘by evidence: (tick. appcabe box)
pivithout evidence ofthe oer he entitlement AQ of the allocation of, or entitlement to, the resource — attach eviderioe and go t0'025(u)
Rete to schedule 10 of the integrated Planning OW the chief executive of the department administering the resource is: Satisfied the:
Reguiation 1998 that prescribes the nature of evidence
paren te Stee i. ‘edging ons development Is-consistent with an allocation of, or entitlement to, ‘the oe
‘development appl : :
t Li (iii) the chief executive of the department administering the resource is satisied the.
' development application. may proceedin the absence of an allocatic of;or ss
[ entitlement to, the fesource- goto 023 a
i omptetiia G23 __.__ |23. Evidence of: the resource entitlement: Bo, * ae
Tei me a oe nandalory f evidence is (i) “Resource entitement/ aithority details“: _{vii) Official stamp of the:
{The oficial stamp of the Department of Natural . _ *+ administering
j Resources, Mines and Water is mandatory where the . — = <7 = applicable) -
F application Involves any water or riverine quarry
Fate! under the Water Act 2000
; Section 3.2. 1(5A) allows the resource manager to limit
‘ { the time the evidence may be used. Q23 (vi} must be
jeomplted if the evidence is fime limited.
Assesment triggers
the completion of Parts A and B of the Form only. tt
Must be completed for ail other applications.
This checkist does pot apply if the application ceninel :
Plans / drawings / reports
“An application should be aocompaniad by details to
Support the proposal & enable the assessment ~
‘manager, refetrel agencies end any person viewing
| the application during public scrutiny or public .
Rolification to understand the scope of the proposal ¢
jond any potential impact ao
at
25. Pianeldvawingaroporis accompanying | ‘this “pplication:
Title
Plan / Drawing / Report Number
. 2a MN CLESS
C-UL-l 2eve t Conve Osce. 3:9-o7
PLEASE NOTE: The assessment manager nay refuse to accept an application that, at the time of fodgement, fails to provide all applicable information required bye PartA
- and any other relevant part of Form 1.
FRE @)
OFFICE USE, ONLY (applicable to assessment menegers
‘DATE ©
\"
To
Aecrdtatn
- Notification of Engagement of Private Certifier (Optional formal)
Council, | have been engaged as the penal certifi for the building work refered toin his application,
_Name: Signature: ara
Number. -
Oateofengagement / /
:
- ’
}
Page 7
“INTEGRATED PLANNING ACT1997- =~ ~ : IDAS Assessment Checklist, Version 20, 2 April 2007
_ IDAS Assessment
Checklist —
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklist’, Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
~*Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities {e.g. Environmental Protection
Agency, Dept of Natural Resources and Water, Queensland Heritage Councit etc).
3. This checklists provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application. ‘
Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
Itis the responsibility of the applicant to accurately complete this checklist.
Depending on the nature of the application, an applicable State entity may be either the assessment Manager or an IDAS referral agency for the application.
4
5.
6. Section 2 is mandatory only if the proposed development is tocated in any part of a'wild river area declared under the Wild Rivers Act 2005,
7.
8.
The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination2,
9. To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au, Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application. ,
10, Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www.ipa.aid.gov.au,
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
Slate assessment triggers
TEBE tc ae
ree 1
apply
STATE -ASSESSMENT:
GERRI ony “a The 4 ti
to development other than for building work assessable against the Builc
wee
(Completion' manda
2 ha ARR
Environmentally retevant activity
For more information refer to Guide 4.
Untess you answered “none af the above" to 01,
the application requires assessment by the
administering authority.
Ifan entity, other than the administering
authority, is thé assessment manager for the
application, the administering authority is a
concurrence agency for the application in relation
to this matter, .
Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where 'an allocation under the Water
Act 2000 is required.
1. The application involves: (tick applicable box/es)
0 (i)
Di)
Mi
an environmentally relevant activity (ERA) for which a code for environmental compliance
has not been made - complete Part G of Form 1 uo
a mobile or temporary ERA for which a code of environmental compliance has not been
made - complete Part G of Form 1
none of the above
Continued overleaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist {if applicable).
OFFICE USE ONLY (applicable to assessment manager)
1 The assessment manager is responsible for assessing and deciding an !DAS application. The assessment manager for an appfication is prescribed in schedule 8A of the-IPA.
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’, oe
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local goverment (for a devolved ERA) or the Queensland Department of Primary industries and
Fisheries (for a delegated ERA).
x
Page i
Page 8
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 20, 2 April 2007
_ State-controlied.road matters :'|2) The application involves: (tick applicable bowes)
Far mere information seer o Guide 3 J (i) development on land contiguoust to a State controlled road and for -
Unless, yOu answered ‘none of thé: above" 0Q2,)
“the application triggers referral to the Deparment Oo {a} material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referral agency.
(7 (b) reconfiguring a lot unless -
any wage nner e the total number of lots is not increased; and
be a concurrence ‘agency: « the total number of lots abutting the State-controlled road is not increased:
stom wil assist you 8 1 (c) operational work (not associated with a material change of use assessable against the
-concurrences agency for-the application. | planning scheme or reconfiguring a lot mentioned in (b) above)—
* associated with access to a State-controlled road; or
for filling or-excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
(1 (ii) development on land not contiguous to a State-controlled road and -
(a) material change of use - ,
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP. Regulation and exceeding the thresholds set by
‘ that schedule;
~ (1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation r )
oy "and exceeding the thresholds set by that schedule;
[J (©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) above)~
at ° « assessable against the focal government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
. ‘ that schedule.
‘| ir) none of the above
- Clearing vegetation ot os va) 3. The application involves: (tick applicable box/es)
For mae information refer to Guide 12, CJ (i) . material change of use -
Unless you answered “rione of the above" to Q3,
the application requires assessment by the (a) assessable against the planning scheme;
‘Department of Natural Resources and.Water + -
wae ee {b) on alot containing
fan agency other than NRW is the agsessmient « acategory 1, 2 or 3 area shown ona property map of assessable vegetation; or
manager for the application, NRWis a * « if there is no property map of assessable vegetation. for the lot - remnant vegetation;
Ganaurtence agency for te application in retelion (c)_ where'the existing use of the land is a rural or environmental use; and.
to this matter.
Hlyousicked-03() or (i, your application ia (d) - where the size of the land is 2 hectares or larger - complete Part J of Form 1
referral to: NRW for assessmeit regardless of - Ci (ii) reconfiguring a fot -
whether-vegetation clearing is pfoposed.or not. | | . . .
: vee i (a) on alot containing a category 1, 2 or 3 area shown on a property map of
-assessable vegetation or, if there is no properly map of assessable vegetation for
the lot, remnant vegetation; :
(b) , where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(4) where the size of any lot created is 25 hectares or smaller - compete Pert J of Form 1
C1 (iii) operational work. -
, (a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ji) - complete Part J of
Form t
ww) none of the above.
Strategic portland 4. The application involves:
or more infomation refer Gude 11 (1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (Tl
‘if you ticked (j) - the relevant Port Authority is the Act) - complete Part | of Form 1
assessment manager for.the application. . pe . : .
fyou ticked (i) Queensland Transport is a (1 (ii) a material. change of use that is inconsistent with the land use plan approved under the
concurrence agency for the.application. TI Act for the strategic port land - complete Part f of Fonn 1
wi none of the above
4 Land contiguous to a State-controtled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-contolled road; 0 or that is part of a future State-
controlled road.
Page 2
Page 9
INTEGRATED PLANNING ACT-1997_ —-
~ : IDAS Assessment Checklist, Version 20, 2 April 2007
Acid sulfate soils 5. The application involves development on land situated in an identified? local government area
For more information refer to Guide 10. and where the surface of the land is: (tick applicable box)
Uniess you answered “none of the above” to QS, (1) below 20m AHDS and the development wil involve the excavation of 1000m3or more of
the application requires assessment by il below 5 H
Deparment of Natural Resourcés and Water soil or sediment at or below 5m AHD, or
(NRW). C1 (ii) at or below Sm AHD and the development will involve fi iiling the site with 1000m3 or more
tan agency other than NRW's the assessment . of material
thanager for the. application, NRW Is an advice /
ney’ lication in étaion to this (iii) none of the above
: es-oF, possible 6. Does the application involve a.material change of use for a major hazard Taclty or “possible
inajor hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more informa ‘refer to. ‘Guide 17. 0
Htyou answered "YES" to Q6, the application
fequires assessmient by the Department of LI YES - complete Part L of Forn 1.
»Emeimericy Services (DES). ,
Iban agency other tha DES is the, assessment
-Managet for the pplication, DESis a
, sconcurrence. agent y forthe application it in
‘Water related development underthe |7. The application involves:
Water Act 2000 C1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
“For itore. information about items (a) - (0), refer - (tick applicable box/es)
@ Guide15. For more information about iter” -
Guide 14 Dées my application (1 (a) in a watercourse, lake or Spring, (eg. a pump, gravity diversion, stream re-direction, weir or
Sig se issment of a referable dam dam) - complete Part Ke, Ks, Ks, Ks, or Ko of Form 1 whichever is applicable; :
- Unless you answered ‘none ‘of the abave' to Q7, [1 (b) for an artesian bore anywhere in the State, no matter what the use - - complete Part
the: application: Tequires assessment by the
: Department, of Natural Resourtes and Water Ki of Form 1; . .
* (NRW). oO {c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
J aft agency pies tan Nevis te asssne by a water resource plan, for use for purposes other than stock and/or domestic
Hnanager.for 8 applicatio a
Gdricurrerice agency for the application in USE - complete Part Kx of Form 1,
relation to this matter, [1 (@) for a subartesian bore, in certain declared subartesian areas, for use for stock
, and/or domestic purposes - complete Part K; of Form 1;
(J (e) for taking overland flow water in certain areas covered by a water resource plan
— complete Part Ks of Form 1;
(1) for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1
(21 (g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
(ii) none of the above. /
‘Removal of quarry material from a 8. Does the application involve development for the removal of quarry material from a watercourse?
- watercourse
For inore information refer to Guide 16.
If you answered “YES" to Q8, the’ application
requires assessment by the Department of
Natural Resources and Water (NRW). .
‘If an agency other-than NRW is the assessment
«mariager for the application, NRW is a
concurrence agency for the application in
elation to this matter.
Note: Part G of Form’ is required to be .
completed as thé activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
0
(YES - compiete Parts Ky and G of Form 1
requigjng an allocation notice under the Water Act 2000?
VIN
a
5. The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cootoola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vate, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa,
Australian Height Datum (AHD).
Cans
Watercourse is defined in sch 10 of the IPA
The declared ground water areas are listed in Guide 13. Development i in a declared catchment area.
Referabte dam is defined under the Water Act 2000.
Taro, Torres, Townsville, Whitsunday.
Page3
Page 10
* Qld) as a-concurrence agency.
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007 '
Operational work that Is tidal work or |9. The application involves operational work that is: (tick the applicable box/es)
work in coastal management district C1 (i) tidal work'® as defined under the Coastal Protectian and Management Act 1995 (the
For more information refer to Guide +8. For
more information about prescribed tidal work in
local govemment tidal areas refer to Guide 24. - oO (ii
Unless you answered ‘none of the above" to Q9,
the application requires ‘assessment by the oO wm)
Environmental Protection Agency (EPA).
i an agency ‘other than EPA is the assessment
Manager for the application, EPAis‘a
:concurrence agency / for the application in
felation to this matter.
: is the assessment manager
for-all prescribed tidal work.
‘Operational work below high water | 10. The application involves operational work that is: (tick ine applicable box/es)
mark .
For more information refer to Guide 18. For
more information about prescribed tidal work in
local govemment tidal areas refer to Guide 24
Unless you answered “none of the above” to
Q10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Local government is the assessment manager
for all prescribed tidal work.
iv)
Di
O i
Oil)
fen
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, oF
tidal work that is prescribed tidal work"' other than in a canal"? -complete Part P of Fonn 1; oF
carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are ticked.
(J (a) constructing or installing works in a watercourse between MHWS and HAT (le.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
(2 (b) constructing a canal12 intended to be connected to tidal waters;
[1 (©) constructing an artificial waterway;
{J (d) reclaiming land under tidal water;
(J (e) disposing of dredge spoil or other solid waste material in tidal water;
(J (f) "interfering with quarry material on State coastal land above high- -water mark;
(1) (9) draining or allowing drainage or.flow of water or other matter across State
coastal land above high-water mark;
(1 (h)_ removing or interfering with coastal dunes | on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(i). constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high- -water mark; or
none of the above. .
tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work = complete Part M of Form 1; OF
tidal work that is prescribed tidal work"4 - complete Part P of Form 1; OF
carried out within a coastal management district!S under the Coastal Act and for -
(1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 7; .
[2] (b)_ rectaiming land under tidal water - complete Part M of Form 1; OF
(1 (c) constructing a canal12, if the canal is associated with reconfi iguring a lot -
complete Part M of Form 1;
none of the above.
Coastal management 11.
For more information refer to Guide 18.
Unless you answered “none of the above” to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
lf an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
The application involves: (tick the applicable box/es)
Of
Oi)
Diy
Ow
wm
a material change of use assessable under a planning scheme involving operation
work carried out completely or partly in a coastal management district’
a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is ~
« the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a lot” assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 — complete Part M of Form 1
none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly wilhin a local government tidal area.
12 Canal means canal as defined under the Coasta! Protection and Management Act 1995
13 Tidat work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastat Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a loca! government tidal area, :
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a°
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go oto the planning scheme agains! which the application is being assessed,
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial i walerway, must de
accompanied by the application for ihe operational works to construct the artificial waterway.
Page4
Page 11
+ within 200m of @ shipping channel or, ai entry
INTEGRATED PLANNING ACT 1997"
Development within the limits of a
pot -
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
it you answered.“YES’ to Q12, the application
triggers referiat to the Port Authoiity .
The Port ‘Authaiit is'a concurrence Agency ‘ithe
dévelopmenti is=
and exit shippirig comidor for the. port ©
* within 1000m of a swing bagin,.a commercial
Shipping wharf, a, moori Anchoragé or spoil
grounds; .
the Transport. affastucturé Aét-1994,
in all other situation the Port Auttioity i
“advice agency:
12.
—_.IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark’ and within the limits of a port
undeythe Transport Infrastructure Act 1994? -
NO
(1 YES - complete Part M of Form 1, of Part P of Form 1 if the work is prescribed tidal work
‘Marinas +: | -
Service as an a
For more information refer.to Guide 18. For’
information about.whether a'm: is prescibey
tidal work refer to Guide 24. The'locat
govémmientis the assessment ft agi for a”
preséribed tidakwork. -* '
tf you answered "YES" to Q13, the app! lication .
triggers referral to Queensland Fire-and Rescie
Does the application involve operational work that is tidal work for a marina with more than 6 -
vessel berths?
Mio .
(DYES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
fetter cer ti ee
‘areas tis;
Tidal works.in Strategic: port tand tidal
: : : et
Uniess you answered*NO” to ata; the relevant |
Port Authority is the assessment manager for the
application and:the courant Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
4,
Wo application involve tidal works within a strategic por land tidal area)
NO .
{1 YES - complete Part M of Form 1
» you answered "YES" to 15, the application
Heritage
For further information refer.to Guide 19.
triggers referral to the Queensland Hefitage
Couneil as concurrence agency forthe -
application.
Unless you answered "none of the above" to
Q15(b), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application
15.
Does the application involve development i in a heritage registered place as defined under the ~
Quegnsiand Heritage Act 1992?
NO .
[71 YES ~ complete Part C of Form 1
45(b)The application involves: (tick applicable boxes) .
Oi(i) — amateriat change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
D ti) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
(iii) none of the above.
Declared catchment areas
For more information, including a list of the
declared catchment areas within Queenstand,
fefer to Guide 13.
Unless you answered “none of the above” to
Q16, the application requires assessment by the
Qepartment of Natural Resources and Water
(NRW). .
if an agency other than NRW is the assessment
manager for the apptication, NRWis a
concurrence agency for the application i in
relation to this matter.
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring fide.
19 Marina is defined in the Transport Operations (Maritime Poifution) Regulation 1995,
20 Strategic port land tidal areas are the areas genesaily 50 metres seaward of high water mark adjacent to strategic port land.
16.
The application is in an area declared to be a catchment area under the Water Act 2000 and / {
involves: (tick the applicable box/es) -- }
oO (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Li (i) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
wo out an environmentally relevant activity under the Environmental Protection Act 1994;
(iii)
none of the above
Page 5.
Page 12
INTEGRATED PLANNING ACT 1997
Contaminated land’
Applications involving material change of use
and? or reconfiguring.a lot may trigger this
feferal.
For more information refertoGuide'5. -
Unless you answered “none of the above” to
Q17, the application requires assessment by.the
Environmental Protection Agency: (EPA). fan
‘agency other than EPA‘ is’ ie assessment
manager. for.the a appli EPA will be a
¢ for:thé application in
‘elation to this matter.
17. The application involves: (tick the applicable box/es)
(reconfiguring a lot for which all of part of the premises are -
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b)
ordnance - complete Part N of Form 1
Oi) a material change of use -
(a) ‘made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
. for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
. wei none of the above
IDAS Assessment Checklist, Version 20; 2 April 2007
in an area for which an area management advice has been given for unexploded |
“Electricity frastrii
‘For more information referto. schedule ofthe P
Requiation.
Unless you ar answered jone of the ‘abovi
. The ‘appl
Ov
Di)
iii)
ication involves: (tick the applicable box/es)
reconfiguring a fot where any part of the lot is —
+ subject to an easement in favour of a distribution entity or transmission entity under the
’ Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
* any part of the premises is subject to'an easement in favour of a'distribution entity or
_ transmission entity under the Electricity Act 1994 and the easement i is for a transmission
grid or supply network under that Act; and
any structure or work that is the natural and ordinary consequence of the use is, or wil be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
site;
with reconfiguring a tot if any part of the premises is situated within 100m of a substation
O (iv) operational work that is filling or excavation assessable against the planning scheme,
(v)
not associated with reconfiguring a lot, if —
any pant of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
none of the above.
Land designated for:community
infrastructure
Applications involving. development on land
designated for community infrastructure may .
trigger this referral,
For mora information refer to schedule 2 of the
IP Regulation.
Ifyou answered “YES"4o Q19, the application
fequires.assessment by the.chief.executive-of.”
the department administering. the Act: authorising |
the development for the.designated purpose.
if an agency other thanthe designator.is the °
- assessmerit manager for the application, .the
designating agency will be a concurrence
agency for the application it in-relation to 'this
matter. *
Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
{ii) on land not owned by or on behalf of the State; and
(iii) other than development —
(a)
(b) carried out by, or oni behalf of, the designator.
Go .
Dyes
for the designated purpose; or
Page 6
Page 13
“* Q24; the’ appl
, Concurrence agency for the application in
- JNTEGRATED-PLANNING.ACT 1997_
SEQ Regional Plan
For more information refer to schedule 2 of the
AP. Regulation.
Refer to: Chapter: 2 pat 5A and schedule 10 of .
te ‘Integrated Act. 1997, and schedule
2of the Regulatory Provisions for relevant’
d
ne of ihe above" to
IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable bowes}-
(i) amaterial change of use of premises -
O
{a) in a Major Development Area in the Urban Footprint for -
DD (i) anurban activity -
(1 inan area incliided in a structure plan where the IPA, section 3. 1 6
applies; .
O in an area not included in a structure plan where -
“e the IPA, section 3.1.6 applies to the application for the material ‘change
of use; or .
” the premises exceeds 10,000m2: or
+ the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme”
CD (ii) intensive animal husbandry, or”
J (ii) residential development involving a rural residential purpose
- (b). in the Regional Landscape and Rural Production Area for -
0) (i) anurban activity and not specified in section 2.4(2); or.
C1 (ii) residential development involving a rural residential purpose aiid not
: specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 28(0)
{d) in the Investigation Area for -
1 (i) anurban activity and not specified in section 2.10(2);
OO (i) residential development involving a rural residential purpose and not |
specified in section 2.12(2); o
OO (it) intensive animal husbandry
{ii) reconfiguring a lot- : 4
On land ina Major Developnient Area in the Urban Footprint that is:
(a} not included in a structure plan; and
(b) not specified in section 3.1(2).
(iii) none of the above
Fisheries matters
- For-more information refer to schedute 2of the P
i Regulation.
‘Uniiess you answered“ ‘none of the above” to
tion requifés assessment by the
Department'of Primary industries and Fisheries
(OPIBF), _
if ani agency other than DPI&F is the assessment
sariager for the application, DPI8F is a
relation to items: (i) - ~{¥) and an advicé agency
‘in relation to item (v)..
21. The application involves: (tick the applicable box/es)
Oi)
Diii
Diiy
Ow)
Om
wn
an assessable material change of use for aquaculture - complete Part O: of Form 1:
assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 7;
assessable operational work completely or partly. within a declared fish habitat area...
complete Part O2 of Form 1;
assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
development assessable under the IPA, schedule 8, pat 1, on fand that adjoins a -
declared fish habitat area;
none of the above.
Page?
Page 14
INTEGRATED PLANNING ACT 1997 Integration of tand use and public transport —~ For mare information refer to Guide 23, schedule 8A of the IPA, & schedule 2 of the IP Regulation. Unless you answered “none of the above", the ‘application triggers réferral to QT as a concurrence agency. ; Railway safety and efficiency For more information refer to Guide 23, schedule _ 8A of the IPA & schedule 2. of the IP Re Regulation, Unless you answered “none of the above”, the application triggers referral to QT asa * concurrence agency. r IDAS Assessment Checklist, Version 20, 2 April 2007 22. The application involves: (tick the applicable box/es}— LD (i) a material change of use assessable against the planning scheme for a purpose ~ mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that schedule. DO (ii) reconfiguring a lot— (a) __ onland that is completely or partly within a public transport corridor, and the total number of lots increases; (J (b) on land that is completely or partly within a future public transport corridor or an airport's public safety area; . CD (ce). on land that is within 400m of a public passenger transport facility or a future public passenger transport facility, and the total site area is 5000m2 or greater; (1.(@) . for a residential purpose within the 25 ANEF contour for an airport; (e) _ for a residential purpose resulting in 100 or more allotments. _ C1 fill) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) ” above, on land that— C1 (a) _ is completely or partly within-a public transport corridor or a future public transport corridor; [1 (b) will result in work that encroaches into an airport's operational airspace. Fa none of the above. 23. The application involves: (tick the applicable box/es)— ow (i) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13D of the P Regulation and exceeding the thresholds set by that _ schedule. . , D (ii) reconfiguring a lot— @ (J (a) ontand that is completely or partly within a a future public transport corridor, future railway land or a railway tunnel easement; (J (b} on tand that is within 400m of a Citytrain passenger railway station or a future Citytrain passenger railway station, and the total site area is 5000m? or . greater; (Jo on land that abuts rail corridor land, commercial corridor land or future railway Jand, and the total number of lots increases; [1 (4) onland that abuts rail corridor land, commercial corridor land or future railway land.and an easement abutting the corridor or future railway land is created; Le) _ ontand that is completely or partly within 100m of, and abutting an approach to, a railway level crossing, and thé total number of lots increases; | (1) _ for a residential purpose resulting in 100 or more allotments. @ | | LD (ii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii} above, involving extracting, excavating or filling greater than 50m3, on land that (1 @) _ is completely or partly within rail corridor land or commercial corridor land, and - the work is not for rail transport infrastructure or other rail infrastructure; [3 (b) _ is completely or partly within future railway land, or a railway tunnel easement; (J (co) abuts rail corridor land, commercial corridor land or future railway land, and -the work is within 25m of the railway boundary. ria none of the above. Moonie to Brisbane pipeline For more information refer to schedule 2of the IP Regulation. Unless you answered “none of the above”, the application triggers referral to the holder of pipeline licence No 1 issued under the Petroleum! Act 1923, currently Santos QNT Pty.Ltd, for advice, 24. The application involves the easement for the construction or operation of the Moonie to Brisbane strategic pipeline, and involves: (tick the applicable box/es)— (1 (i) a material change of use assessable against the planning scheme and not associated with reconfiguring a lot, and any structure or work will be located wholly or partly in the (21 (i) reconfiguring a lot C1 (ii) operational work assessable against the planning scheme, that is filling, excavation, compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the work is located wholly or partly in the easement. wl none of the above. | q | | | easement. : / Page 8
Page 15
INTEGRATED. PLANNING ACT. 1997
Koala habitat area
For more information, refer to Guide 26 and
schedule 2-of the (PRequiation.
Unless you answered “hone of the above’, the
application requires referral to.the Environmental
Protection Agency as a concurrence agency.
oe IDAS Assessment Checklist, Version 20, 2 April 2007
25. The application involves: (lick the applicable boxes}— ~~ a
oO 9 a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -
O(a) clearing of native vegetation over an area greater than 2500m?,
L(b) anew building and any reasonably associated structure with a total. footprint =
greater than 1000m2;
[J (c) an extension to an existing building and any reasonably associated structure if
the extension has.a total footprint greater than 1000m2:
Od: extracting gravel, rock or sand from an area’greater than 5000m?;
[1 (e). excavating or filling an area greater than 5000m2;"
[1 () additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
0 (ii) reconfi figuring a foti in a koala conservation area or koala sustainability area that will
result in -
(1 (a) an increased number of lots; :
LD (b) clearing of native vegetation over an area greater than 2500m?. .
C1 (ili) operational work in-a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result. in the Clearing of native vegetation
over an area greater than 2500m2.:
_ Civ) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme {not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above} that is not for a domestic activity
and will result in —
. C1 (a) clearing of native vegetation over an area greater than 2500m2;
C1 (b) extracting gravel, rock or sand from an area greater than 5000m?;
LF) (ec) excavating or filling an area greater than 5000m2,
oe none of the above.
“Wild river area
For more information, refer to Guide 27
Ifyou answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which refersat
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the.assessment manager.
26. Does the application involve development in a wild river area dectared under the Wild Rivers Act
- 2005?
who:
Cyes
Preliminary Approval
Ifyou answered YES to Q27, the application
triggers referral to the Department.of Local
Government, Planning, Sport and Recreation as
an advice agency.
27. Does the application involve a development for which preliminary approval is sought under
Sectign 3.1.6 of the integrated Planning Act 1997?
VIN
10
LYes
Wetlands
Dornestic activity means the construction or use
of a single residence Gn a lot and any reasonably
associated building or structure, Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker’s residence, granny flat, building or
structure used for a home business.
Note: Wetiand is defined in the integrated
Planning Regulation 1998.
Unless you answered “none of ttie above’ to
Q28, the application involves referral to the
Environmental Protection: Agency as an advice
agency for the application.
28. The application ‘involves: (tick the applicable boxes) -
C1(i) .amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
Oi) reconfiguring a tot -
In or within 100m of a wetland that will result in
(J (a) more than 10 lots being created; or
y [)(b) lots less than 5 hectares; .
Mii none of the above ‘
Page 9
Page 16
INTEGRATED PLANNING ACT 1997
Conservation Estate
_ Urban,purposes is defined in the Integrated
Planning Act 1997 as “purposes for which land is
used in cities or towns, including residential,
industrial, sporting, recreation and. commercial
purposes, but not including e environmental,
conservation, niral, natural or wildemess area
‘purposes’.
Q29, the application involvés referral to the
_ Environmentat Protection Agency as an advice,
“agency. for the ‘application:
”
IDAS Assessment Checklist, Version 20, 2 April 2007
29, The application involves: (tick the applicable box/es)— : so
(1{i) a material change of use for urban purposes that is in or within 100m of any of the
following -
LJ (a) aprotected area, forest reserve, critical habitat or area of major interest under
- the Nature Conservation Act 1992;;
[J (b) a State forest or timber reserve under the Forestry Act 1959;
[1 (©) amarine park under the Marine Parks Act 2004;
(2 (@) arecréation area under the Recreation Area Management Act 1988;
(1 (e) a world heritage area listed under the World Heritage Convention;
(1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
(7 (ii) reconfiguring a lot if -
C1 (a) any part of the lot is situated in, or within 100m of, any of the following -
C1 ()} - aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
[J(i) a State forest or timber reserve under the Forestry Act 1959;
D0 (ii) a marine park under the Marine Parks Act 2004;
CI (iv) arecreation area under the Recreation Area Management Act'1988;
LJ (v) a world heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
Ob) (b) the reconfiguration involves more than 10 lots being created, or any lot
y resulting from the reconfiguring is less than Sha;
he none of the above.
Page 10
Page 17
DAS Assessment Checklist, Version 20, 2 April 2007 Wild River Area. It the responsibility of the applicarit to determine if the evelopment is. proposed: in ‘a wild river area. ‘ “Information about wild:river areas:including the geographical location and position of er management areasiin relation to properties, car’, be dccessed by contacting the Department of ‘Natural Resources and Water (NRW), accessing the'department’s website iwininnw. ald. goviau or: Contacting the department by email on: > Wild [email protected]:au Note on Referrals ‘Réfervals for development in a wild river.area’ : (ther than for agricultural activities-and animat husbandry activities) are not changed ftony'thé existing referral afrangemenits, zl ‘Notes on development assessable against the Wild Rivers Code Fort information regarding development it in-a'witd fiver area, see the relevant wild river declaration * and Guide 27. Theretevantwild river. declaration will pidvide information regarding .which:types of.development must be assessed + against the Wild Rivers Code, and in some ‘Cases which types.of' development are exempt from wild river requirements. The riotes on development assessable against the Wild Rivers Code in-this section: of the checklist provide some guidance however this «may vary between wild river areas, The relevant declaration will provide the information applying “to each wild river area. Applications for some new developments will not |’ ” “be.accepted:if the proposéd development is in a high preservation area (HPA). Most applications for development activities which may-be made including those in a preservation area (PA), must be assessed against and must comply with the Wild Rivers Cade where indicated in a relevant wild river declaration, Which wild river area is the development proposed in in? The proposed development is to.be located in: (tick the applicable bowes) (11) a high préservation area (HPA); (Di) a preservation area (PA) ; . O itt) a wild river floodplain management area (FMA); [_J iv) a wild river nominated waterway; O v) a designated urban area (DUA). Environmentally relevant activities 2. (ERAs) in a designated urban area ffyou answered: YES, your application for an ERA is exempt from any wild river requirements nd provided there are no other aspects of this - development that require assessment against wild rivers, you do not need to complete the remaining questions in Section 2. If you answered NO to Q2, please complete the Temaining questions in Section 2, Does the proposed development only involve any of the following environmentally relevant activities (ERAs) in a designated urban area (as:mapped in the relevant wild river declaration}? i) An ERA 28 or ERA 14; or ii) A level 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59, oO NO O YES (ensure you have completed Part G of Form 1) Clearing native vegetation 3. IF YES, there are a limited number of purposes for which an application to clear native vegetation may be accepted in a HPA. See Guide 27 for a list of relevant purposes for | 4, which an application may be made in a HPA. IEYES and you ticked Q4 box i) the application may be made and is assessable against the Wild |’ Rivers Code. If YES and you ticked 04 box ii) the application will not be accepted. Note: If clearing native vegetation is in a PA, there are no wild river requirements and provided there are no other aspects of this development where wild river requirements apply, do not complete the remaining questions in Section 2. _ Is the application operational work for clearing native vegetation in a HPA? Q NO O YES (ensure you have completed Part J of Form 1) If YES, is the clearing? O i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered area of agriculture in a HPA (see Guide 27); or : ET ii i in a HPA outside a registered area of agriculture? Page 14
Page 18
INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas ‘
Ifyou answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
Assessed against and must comply with the Wild
Rivers Code.
Ifyou answered YES to Q5 and licked box i}'in®
Q6, your application is required to be referred to
-the EPA.
_Note: if specified works are-proposed in a toca |
government area, itis prescribed tidal work - the
sTelevant local govemment will be the
assessment manager with the EPA as a
concurrence agency
if you answered YES to Q5, and ticked box ii) or
iti) in Q6, your application tequires referral'to
‘DPIF.
of you answered'NQ to'Q5 and ticked box i) in
Q6, the. application will not be accepted.
“Ityou answered NO to Q5,'ticked box ii) in Q6
and the development i is Necessary to install
authorised works or infrastructure where a
‘development permit is not required, or if a
‘required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will |
Not be accepted.
tf you answered NO at Q5 and ticked box iii) in
Q6, the application may be made'if the works are
in aPA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27
IDAS Assessment Checklist, Version 20, 2 April 2007
{s the development for oy opediied works? (see defintion in the Wild Rivers Act 2005 and Guide 27-—
Development in a wild river area)
mie (yes
The application is for one or more of the following:
Oi i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1}; or ©
oO if) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); Of
Oi iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
Residential, commercial or industrial
development
if you answered YES to Q7, your application is’
not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.
if you answered NO-to Q7 and ticked either box
i) or ti) in Q8, the assessing agency is the
felevant tocal government. The application must
be assessed against and must comply with the
Wild Rivers Code.
8.
Is the application for residential, commercial or industrial development in ina 3 designated urban
area?
Lino CT ves
If NO, does the application for residential, commercial or industrial development involve: .
Oi i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or *
LJ ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).
Animal husbandry activities
Ifyou answered YES to Q9 your application
fequires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW. |
Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Does the application involve a material change of use for enimal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?
CjNno
O YES (ensure you have completed Part R of Form 1)
Agricultural activities
if you answered YES to Q10, your application
Tequires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
fot be accepted if proposed in a HPA. For more’
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
‘defined under the Wild Rivars Act 2005. For
more information see Guide 27,
10.
Does the application involve agricultural aclwvities (as defined under the Wild Rivers Act 2005) in
aPA?
(Jno
If YES is the application for:
("J i) a material change of use; or
DO ii) operational works.
Q YES (ensure you have completed Part Q of Form 4 )
* Page 12
Page 19
INTEGRATED PLANNING ACT'1907 ~~
Works that take overland flow water | 12.
The relevant wild river declaration will state
works that take overland flow water are either *
self assessable or assessable, or are exempt
from wild river requirements. 13.
Ifyou ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers C Code
and must comply with the code.
ifyou ticked Q13 ii) an application i is not required
to be made however the works must comply wath’
the relevant self-assessable section of the Wild -
Rivers Code, otherwise the works become
assessable development:for which an application
is required and must bé assessed by NRW. +
‘against the relevant pait of the Wild Rivers. Code’
and must comply with the code, “
{fyou ticked Q13 ill il) your application is.not
subject to wild river requirements. .
Applications far development thatis other than, '
that stated to be assessable, self-assessable | or:
éxempt will not’ be accepted,
‘Tno
= =~ - IDAS Assessment Checklist, Version 20, 2 April 2007 \
Does the application involve works that take overland flow water ina HPA oran FMA? - 4
Q YES (ensure you have completed Part Ke of Form 1) ‘
If YES, is the application for works stated in the relevant wild river declaration to be?
(1) assessable works
(J ii) self-assessable works.
[7] ili) exempt works , \
ed
‘Works that interfere with overland = °| 14,
flow water
~The'elevant wild river.dectaration will state’.
works that intétfere with overland flow water
are either self assessable, assessable ot exenipt| 15.
‘fram wild river requirements. :
‘ifyou ticked Q15}}, your application must be
‘assessed by NRW against the Wild Rivers Code’.
and must comply with the code.
Nyouticked .Q15 ii) an application is not required
to be made however the works must comply with
the relevant sell-assessable section of the Wild
Rivers Code, atherwise the works become
assessable development for which ai application
is required and must be assessed by NRW °
against the relevant part of the Wild Rivers Code
and must comply with the code,
tfyou ticked Q15 ili) your apptication is not
Subject to wild river requirements.
Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not-be accepted.
Does the application involve works that interfere with overland flow water in a FMA?
oO NO im YES (ensure you have completed Part Kio of Form 1)
If YES, is the application for works stated i in the relevant wild rivers declaration tobe?
(Ji) assessable works
O ii) self-assessable works
O i exempt works
Waterway barrier works 16.
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
Ifyou answered YES.to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve building o or raising waterway barrier works i in a PA?
O NO" O YES (ensure you have completed Part Os of Form 1)
Aquaculture (non ERA) 17.
Applications for aquaculture in a HPA will not be
accepted.
lf you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code,
Does the application involve aquaculture in a PA?
O NO O YES (ensure you have completed Part 01 of Form 1)
Works that interfere with waterina | 18.
watercourse
Note: if the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse {including dams or weirs,
stream realignment or steam diversion) wil not 19,
be accepted.
Ina PA, applications for instream dams and
weirs may be accepted in nominated waterways.
ifyou tcked box ji) in Q49, your application will
fot be accepted.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and Jocations of nothinated.
waterways is availablé by contact NRW,
accessing the departnent’s website
www.niw.gid.qov.au ar contacting the
department by email on:
wild [email protected],gov.au.
Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
QO NO YES (ensure you have completed the relevant Part K of Form 1)
If YES,
C i) The application is for an instream dam or weir; or
C ii) The application is for operational works that interfere with water in 4 watercourse, and is
for development other than a dam or weir.
Page 13
Page 20
- local goverment (see.EPA website for more
” are rere 16 Comnpiéte 22... . :
INTEGRATED PLANNING ACT 1997
Environmentally relevant activities | 20.
Most applications for an ERA in-a HPA will not
“be accepted. Applications which may be made
Tequire referral to the EPA. The assessment of
‘some ERAs is: s assessed by NRW, othershave | 21,
been devolved to DPIF, NRW ‘or delegated
information on devolved ERAs)
If you answered NO to Q20 you do not need to | 99°
complete Qs 21-24. , 4
Kyou answered YES to Q20.and the
developmentis in a PA, your appli
assessed by the: istering ‘authority? * 23
against the Wild Code and must comply, .
. with thé code, unless the proposal i
. development where an ‘application willnot be |
| accepted, or is exempt from wild fiver
Tequirements (see Q2). You will be able to
determine if an application will not be-acceptéd
~for-the development by answering Q21- — 024.
Hyou answered NO to.Q21, youdo not need.to
‘answered YES to aaty you
+ Ifyou answere
is proposed i inth HPA‘
accepted. ff:you answers
“application must be assessed by sg
“NRW {as prescribed i in scheduile:8A of the: ipa)”
against the Wild Rivers Code and must comply
‘with the-code. .
\tyou answered YES to. Q24 the application will .) .
not be accepted. 'f you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply |
with the code.
Exempt ERAs in a designated -urban
area ,
If the development is proposed in a designated
Urban area there may be no wild river
Tequirements. See Section 2Q2.
Note; All applications. that can be accepted | must
be assessed against and must comply withthe
Wild Rivers Code (other than exémpt ERAs in a
designated urban area).
“4
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve an ERA? .
O NO . LIYES (ensure you have completed Part G of Form)
Is the application for an ERA 20 instream?
[Jno | Lives
Isa quarry allocation notice held for the proposed ERA 20 instream?
[no Lives
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex}
ii) an ERA 19 (dredging)
iil) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
{no (yes
Is the proposed development for ERA 20 (out of stream) and; 7 : @
— inaFMA;and | .
— not low impact; and :
— not for a residential complex in the area, or for specified works.
(Jno (Yes
Documentation 125.
Fyou answered NO to Q25, ‘your application’
may be subject to an information request and
processing of the application may be delayed.
Has documentation been included with the application describing how the applicant proposes to ®
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in'the relevant part/s of the Wild Rivers Code?
Lino | Dyes
2) The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
Page 14
Page 21
Fy The Anglican Parish of Cooroora~{\\W7. -
a 1 Rectory Street, POMONA Qld 4568
Phone 07 5485 1218, Mobile 0419 779 968
E-mail: [email protected] ‘The Arplican Paris
Cooroy Pomona Kin Kin Boreen Point
August 30, 2007
TO WHOM IT MAY CONCERN
BOUNDARY RELAXATION APPLICATION FOR LOT 83; RP 59216
With reference to the above property, we request an approval to build a deck at the front entrance to the
Robert’s House premises at 24 Orchard Ave, Boreen Point.
The church is used by the Anglican Church of Australia, Parish of Cooroora, for regular worship. It is also
used by community organizations for meetings. Currently, visitors walk across the lawn which is saturated in
the wet due to the shallow level of underlying sandstone strata. A concrete footpath will lead people to stairs
with a low gradient leading to a deck to allow visitors, including people with disabilities, safe and easy access
into the House.
The whole reason for this application is for the Parish of Cooroora to provide a safer, more congenial entrance
to the building which the parish recognizes is an integral part of the community of Boreen Point and the
Cootharaba District. The parish’s intention is to retain the character of this building donated to the Anglican
Church by a parishioner without making any larger footprint frontage than any of the other adjacent dwellings.
On the left side of the property there is a 2m high hedge, while the adjoining property on the right hand side is
vacant. The neighbours will not be adversely affected by the construction of the proposed deck and stairs
which extends 3.7m from the fascia of the building, set back 3.5m from the front boundary. Mr Ian
McConnell, the owner of 22 Orchard Ave, Boreen Point (contact 0437 019 545) has confirmed his agreement
with the alignment of the proposed deck.
A number of other houses within the street have constructed decks or fixed landscaping structures closer to
the boundary than the prescribed 6m. Number 22 has an existing elevated timber deck set back 4.7m from the
front boundary and number 20 has an existing elevated timber deck set back 3.5m from the front boundary,
the same offset as the bottom of the stairs proposed at Number 24. Most importantly, from a visual impact
point of view, the proposed deck at the top of the steps is 4.65m back from the boundary which means the
immediate owners will have no more obstruction to their view than their own deck.
Approval is sought for a concession of 2.5m from the building alignment to the property boundary. This will
mean the deck will be 4.65m from the building alignment, with the stairs set back. 3-3 ON
The deck will range from .95m to 1.35m above existing ground level.
With kind regards
ig Woolner Dawn Williamson
iest-in-Charge Church Warden
May the God of hope fill you with all joy and peace in believing, so that you may abound in hope by the power of the Holy Spirit.
: . Romans 15:13
Page 22
me by Reoeeots Heusk 24 ofcwaads Ave 10 (4 {o
Bonrcens Powwr
RoiidtwG SerBace CECAX ATION
a
StRuic,
Mite i»
Hi LIGHTED
Nie WW
POC > VU
CeEret
UWwG
C-((6-| Reve
Fe. EXisT SeT BACK
PAW
\ \
VkeN
(
. N THA
it Ac
6B AL
Dec. 4H 2p Lo 3 > ST BAckK
Dec # 22 is AT SEY BAcie
oosé #2y 16 Ti2nw Ser Bact
hes et ie Wsire et u gq SET BAC sf STEMIS a.m
Page 23
fat ee eg et eo
. i
40-232 ™ x
- + ° . L &Zao
a | {
i pop. 3
|
, |
: HOUSE"
ly. a ~. : +4 a ls
@ NEU NISORILITY Kecese 8 “Kh Tee
a Goon) GQaée (a - —7 Pefunce Idiot 0 a ~
| Bese e te | Sse fa€
ot A le | 3
Mm. Ee 4 bo | wo 5 ‘
\ Repince EXISTING > Ff 2 ©
LJ fly \ . STEPS WITH EXTEND ~
‘, FEONT STEPS = : - 7 9 K
. Nei’ Couceere Dans ios
4 \ ed
e
- y+
"AO-232 1 . x L
= : —_f-
feng SITE # FLOOR PLAN !sl00
;e "2 :
‘ —s : a |
jg No 24 4 1 | DN) . Obes
. Lo i “FL. s, \
Poe uw 14 og ate 4
2 : Ve J :
Zz , i it
~ 1 / |
~ No 22 < oo oe
i - “ , lt ! f 3Sm SET Back
a . 74-7 ae ' cH ; f ai a (
Sou gt 7 & 2
. S | ELEVATION Greens x 250 an b
° g . . nm
8 No 20 | | g100 j oy pecen® Xe
atte cote Caen seenne © eee ete cee ene _ { 4 4‘ se? 200
EXISTING al a5 ' . »
ADJACENT “+ ROBERTS HOUSE” 24 ORCHARD AVE BORCEN PAINT . .. PROPASET” NEW Access
HOUSES & TT ENGLICAN CHURCH ALD 4565 & COMMUNITY AEC
DECKS 12500 ; a SIMON REED ARCUITECT
5 | ONG Colle -1 REV B Rog DESSAIX- ENGINEERING
y 5-9-7
SEPTEMBER O7 Beem
Page 24
b. NEW 2AMP Ra ‘ PELETE WisPonds ADD Bed e0ks mo PerenasneeeS, Tih 2 ———_ EKST WEST ELEVATIONS | ~ “ROBERTS HOUSE” ~ BNGLUICAN CHURCH RAISE Ludi Ee ProPesen SET B / HEPS 3500 dn. Co CO J ‘\ y 4 x Q 3 \ u . 4 : a New TL a ti v - | PeofoSed Bowoar oo | SET BACK. DECK, 2 LPO Uw 4900 2 ,) Ch. § . . = aa ‘ Hr s} Lo of ‘ ; 5 Wa 1 NGL Ue P é \ & ens f pie = oo — i % | ' ul Hs = CEROSSECTION i . i % i ; 4 ' i" Norés? —RBOREEN PRINT 24 ORCHARD AVE. t ALD 4565 Pencos ED NEW 4 CommbNtTY eck Dwey for Tike DECK & foonnd Aevas - i kere. Stascroma. Bears Due C-e-F KAA yt ut 4 ACCESS C-i6-2 REV A Row DESSRIX- ENGINEG RIE 3-94-07 SEPTEMBER. OT RPEQ vi , 566D
Page 25
“
Building Reinstatement Bond:
Payee Name:
Address:
Swimming Pool First Reg - (New) 32/12027.423.701
Doc.Lodgement Fee - Stat Group j 32/12023.423.760
Doc Sales, Retrieval of Plans ~ : , 31/12023.215.879
Boundary Setback Relaxation Fee His-EO 32/12023.423.717
CMS Endorsement Fee : 32/12023.423.717
_{Other Building . 32/12023.423.723
Soil Testing , 31/12023.423.723
Building Search . : 34/12023.423.779
Building Search - Pool Compliance : 34/12028.293.636
PAYEE NAME: Are roe ) Prciusty .
ADDRESS:
( Cece ST Ponen A
leew OfCAWOasS Me Baten) poe
DATE: A [A ( lo 7
TOTAL: BURBS OD
RECEIPT NO: ue game
Used in these records
07/1815 - Preliminary building works assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.